Bpm Minerals Ltd. · ASX:BPM
Bpm Minerals — Investor Presentation (March 2026)
14 slides from Bpm Minerals's investor presentation, March 2026
Slide 1: A major gold system, a major gold discovery in the making
A major gold system, a major gold discovery in the making Forelands Gold Project, WA: High-grade Beachcomber + Bonnie & Clyde unlocked March 2026 ASX:BPM | bpmminerals.com
Slide 2: Disclaimer
IMPORTANT INFORMATION Disclaimer COMPETENT PERSON’S STATEMENT This presentation is not a prospectus nor an offer of securities for subscription or sale in any jurisdiction nor a securities recommendation. The information in this presentation is an overview and does not contain all information necess
Slide 3: Corporate Overview: Capital Structure, Board and Management
CORPORATE OVERVIEW Capital Structure Board of Directors & Senior Management ~130M Shareholder OLIVER JUDD - Chief Executive Officer GREG SMITH - Non-Executive Director Shares on Issue Breakdown An exploration geologist with more than 17 years’ experience in precious and base-metals Greg commenced hi
Slide 4: The Forelands Gold Project
The Forelands Gold Project DRILLING SET TO RE-COMMENCE WITHIN A MAJOR GOLD SYSTEM WITH A PIPELINE OF QUALITY EXPLORATION TARGETS FOR 2026 630 km² landholding on the Yilgarn Craton–Albany Fraser Orogen margin Located ~150 km east of Kalgoorlie, on the Trans-Access Road, near multiple operating mills
Slide 5: More drilling to come at Beachcomber
FORELANDS GOLD PROJECT More drilling to come at Beachcomber First drilling at Beachcomber in over 15 years: Originally discovered in 2006 by Anglo Gold Ashanti with the last holes drilled in 2008. Considered the primary exploration target after Tropicana by AGA at the time. Key heritage agreement ov
Slide 6: The Right Rocks
FORELANDS GOLD PROJECT The Right Rocks Tier-1 geological setting Similar tectonic setting to AngloGold Ashanti’s Tropicana: Geological setting is directly analogous to Tropicana (7.89Moz @ 2.08 g/t)1 and Hercules (71koz @ 4.8g/t)2 just 220km away Genuine Tier-1 structural architecture: Forelands and
Slide 7: Footprint of a Major Gold System
FORELANDS GOLD PROJECT Footprint of a Major Gold System Beachcomber was the first target to be tested, now stepping out along the corridor. A pipeline of quality exploration targets spanning 75km of strike within a largely untouched, district scale land holding. • Bonnie & Clyde – Untested 6km long
Slide 8: Beachcomber (Main Lode)
FORELANDS GOLD PROJECT Beachcomber (Main Lode) High-Grade Gold Confirmed Re-Commencement of Drilling Imminent A high-grade gold bearing quartz vein with near-surface, visible gold Recently completed 3,180m 24-hole RC program results: • FLRC007 – 9m @ 7.77 g/t Au from 75m, including 2m @ 21.73 g/t Au
Slide 9: Beachcomber – Unlocking a High-Grade Gold System
FORELANDS GOLD PROJECT Beachcomber – Unlocking a High – Grade Gold System Discovery Focussed RC Drilling Set to Re-Commence Broader prospect area has potential for multiple ‘Beachcomber’ style high-grade gold bearing veins Detailed soil sampling survey6 has outlined a large gold system at Beachcombe
Slide 10: Bonnie & Clyde – Footprint of a Major Gold Deposit
FORELANDS GOLD PROJECT Bonnie & Clyde – Footprint of a Major Gold Deposit Tropicana-Style Mineralisation Potential • Target within key tenement recently granted7 • Comparable footprint to other major Proterozoic gold systems e.g. Tropicana (ASX:RRL) and Glenburgh (ASX:BNZ). • 6km long gold-in-soil g
Slide 11: Bonnie & Clyde – The Next Tropicana?
FORELANDS GOLD PROJECT Bonnie & Clyde – The Next Tropicana? WA’s most compelling untested exploration target Multiple coherent >100 ppb Au zones within a 6 km gold-in-soil anomaly, with individual samples exceeding 1 g/t Au. Gold mineralisation confirmed in Proterozoic bedrock immediately along stri
Slide 12: Pipeline of Targets
FORELANDS GOLD PROJECT Pipeline of Targets Pipeline of exciting exploration targets for testing through 2026 and beyond along the ~70km of highly fertile Yellow Dam Shear zone: Structural Targets Sidecar Soil Sampling Results • Dr Barry Murphy Structural Targets4 – Intersections of Yellow Dam Shear
Slide 13: Why Invest
Why Invest Drilling Imminent: Prime location: Aggressive exploration planned: 7,500m 40-hole RC program set to Strategically located ~150km east of Kalgoorlie, Situated in a world-class gold terrain with a ~630 km² commence at the Beachcomber High Grade adjacent to the Trans-Access Road, proximity t
Slide 14: Contact Information
Contact Information Oliver Judd Chief Executive Officer E oj@bpmminerals.com P +61 402 811 867 Corporate Presentation March 2026 ASX:BPM | bpmminerals.com Key ASX Announcements 1. BPM ASX Announcement – Acquisition of High-Grade Forelands Gold Project (WA) (7th July 2025) 2. BPM ASX Announcement – H