Naughty Ventures Corp. · CSE:BAD

Naughty Ventures — York Harbour Metals — Investor Presentation (December 2022)

21 slides from Naughty Ventures's investor presentation, Dec 1, 2022

  1. Slide 1: Investor Presentation

    Slide 1: Investor Presentation

    YORK HARBOUR METALS INVESTOR PRESENTATION

  2. Slide 2: Forward-Looking Statements

    Slide 2: Forward-Looking Statements

    Forward-Looking Statements This presentation includes statements that are forward-looking. All statements in the presentation (other than statements of historical fact) that address future operations or plans of York Harbour Metals Inc. (“YORK” or the “Company”) or their affiliates, proposed acquisi

  3. Slide 3: York Harbour Project – Overview

    Slide 3: York Harbour Project – Overview

    York Harbour Project – Overview • 100% Owned, Newfoundland, Canada • Volcanogenic Massive Sulphide (VMS) • 4,725 Hectare Land Package (historic 650 hectares) • Historic Work Focused on 400 Metre Strike Length • Previous Drilling Depth to Only 150 metres • Limited Modern Exploration • Mineralization

  4. Slide 4: Historical Summary – York Harbour Copper-Zinc Project

    Slide 4: Historical Summary – York Harbour Copper-Zinc Project

    Historical Summary – York Harbour Copper-Zinc Project Discovered in the 1890’s. Ore Shipped Directly to the UK Shaft Sinking Began in 1897 with Mining Continuing to 1918 Activity Resumed in the Early 1950’s through to 1970’s The Sea Level Adit was started in the mid 1960’s to enhance exploration and

  5. Slide 5: MAPS - Claim Boundaries & Geology

    Slide 5: MAPS - Claim Boundaries & Geology

    MAPS - Claim Boundaries & Geology - The volcanogenic massive sulphide ('VMS') mineralization occurs along an 18km contact Current Drilling Area - the 400 metre long Main Mine Area has received majority of the exploration - There are 14 reported mineral showings on the property - Aside from the Main

  6. Slide 6: Plan and Cross-Section of Historic VMS Zones Within the Mine Area

    Slide 6: Plan and Cross-Section of Historic VMS Zones Within the Mine Area

    Plan and Cross-Section of Historic VMS Zones Within the Mine Area (after P. Tallman, 2010) The historic plan and long-section of the Main Mine Area shows the distribution of the various named VMS zones and the intersection of these zones with the 4 Level Adit Only one-half of the northeastern 'A' zo

  7. Slide 7: Long Section of Mine Workings & Known VMS Mineralization Looking West

    Slide 7: Long Section of Mine Workings & Known VMS Mineralization Looking West

    Long Section of Mine Workings & Known VMS Mineralization Looking West (Source: Modified after Dearin, 2003) No exploration had been done more than 150 metres below surface York Harbour Metals | TSXV: YORK | OTC: YORKF 7 Investor Presentation | December 2022

  8. Slide 8: Historic Images of VMS Mineralization Photographed in the Level Adit

    Slide 8: Historic Images of VMS Mineralization Photographed in the Level Adit

    Historic Images of VMS Mineralization Photographed in the 4 Level Adit (Source: Duke collection, after Tallman, 2010) Note: Dark mineralization is massive zinc mineralization York Harbour Metals | TSXV: YORK | OTC: YORKF 8 Investor Presentation | December 2022

  9. Slide 9: Inferred Distribution of VMS Mineralization within Folded Volcanic Sequence

    Slide 9: Inferred Distribution of VMS Mineralization within Folded Volcanic Sequence

    Inferred Distribution of VMS Mineralization within Folded Volcanic Sequence (Source: Modified after Dearin, 2003) 500 0 500 York Harbour Metals | TSXV: YORK | OTC: YORKF 9 Investor Presentation | December 2022

  10. Slide 10: Exploration Phase 1-3 Highlights

    Slide 10: Exploration Phase 1-3 Highlights

    Exploration Phase 1-3 Highlights Phase 1 diamond drilling program was designed to confirm historical drilling results and reported grades for known lens of massive and semi-massive sulphide mineralization, primarily within the 'A', D' and 'H' zones. ASSAY HIGHLIGHT FROM PHASE 1: ● YH21-06: 52.2 m gr

  11. Slide 11: Exploration Plan – Phase 3 Highlights + Drill Hole Plan

    Slide 11: Exploration Plan – Phase 3 Highlights + Drill Hole Plan

    Exploration Plan – Phase 3 Highlights + Drill Hole Plan EXPANDED DRILLING PROGRAM • Completed 28 NQ-size diamond drill holes totalling 4,980 metres • Three phases to date total 66 diamond drill holes for a total of 10,764 metres completed since July 24th, 2021 • Analytical and assay results from Pha

  12. Slide 12: Representative Drill Core from YH21-22 & YH21-32

    Slide 12: Representative Drill Core from YH21-22 & YH21-32

    Representative Drill Core from YH21-22 & YH21-32 YH21-22 168.5-173.76m Zinc rich massive sulphides of 5.26m interval of 2.844% copper 31.964% zinc and 420.09 g/t Ag in overall 20.38 m grading 1.69% Cu, 11.91% Zn, and 18.25 g/t Ag York Harbour Metals | TSXV: YORK | OTC: YORKF 12 Investor Presentation

  13. Slide 13: Representative Drill Core from YH21-24

    Slide 13: Representative Drill Core from YH21-24

    Representative Drill Core from YH21-24 Very high-grade copper sample from Hole 24 intersection that intersected 29m of 5.3% Cu, 0.8% Zn, 436.5 g/t Co and 9.0 g/t Ag York Harbour Metals | TSXV: YORK | OTC: YORKF 13 Investor Presentation | December 2022

  14. Slide 14: Soil Geochemical Results from Noranda's 1990 Exploration Work

    Slide 14: Soil Geochemical Results from Noranda's 1990 Exploration Work

    Soil Geochemical Results from Noranda’s 1990 Exploration Work (modified after Dearin, 2003) Soil Geochemical Anomalies Overlying York Harbour Metals | TSXV: YORK | OTC: YORKF Property Geological Plan Investor Presentation | December 2022

  15. Slide 15: Phase 4 Exploration Program Ongoing

    Slide 15: Phase 4 Exploration Program Ongoing

    Phase 4 Exploration Program Ongoing HIGHLIGHTS FOR PHASE 4: • Program designed to test depth extensions within the northeastern (A, D-G Zones) and southwestern (H Zone) halves of the Main Mine Area • Will test other potential copper-zinc mineralized areas such as No. 4 Brook & K Zones. Areas that ha

  16. Slide 16: Phase 4 Exploration Program Ongoing

    Slide 16: Phase 4 Exploration Program Ongoing

    Phase 4 Exploration Program Ongoing The geological logs for the first nine drill holes report the following visible mineralized intervals. In addition, there are numerous shorter, similar mineralized intervals with stringer and shear-hosted mineralization. York Harbour Metals | TSXV: YORK | OTC: YOR

  17. Slide 17: Corporate Team

    Slide 17: Corporate Team

    Corporate Team MICHAEL WILLIAMS BRUCE DURHAM SEAN CHOI ANDREW LEE LEO POWER CHAIRMAN PRESIDENT & CEO CFO MANAGING DIRECTOR DIRECTOR Mr. Power has demonstrated Mr. Williams has over 25 years of leadership within the mining sector experience as a senior executive within Bruce, P.Geo, holds a BSc. Sean

  18. Slide 18: Technical Team

    Slide 18: Technical Team

    Technical Team ROGER BAER DOUG BLANCHFLOWER NEAL BLACKMORE WES KEATS JOSH BLUNDELL DIRECTOR QP & DIRECTOR CONSULTING CONSULTING DRILLING PROSPECTOR & PROSPECTOR CONTRACTOR ENGINEER Mr. Roger Baer, CPA, CMA has over 30 years Mr. Blanchflower has 51 years of mineral of progressive accounting and finan

  19. Slide 19: Share Structure

    Slide 19: Share Structure

    Share Structure as of November 15th, 2022 TSXV : YORK | OTC : YORKF SHARES OUTSTANDING 63,447,648 SHARE PRICE YEAR HIGH/YEAR LOW $0.70 $1.49/$0.39 MARKET CAPITALIZATION CASH NO DEBT $44.4M ~$6.5M OPTIONS WARRANTS 3,000,000 14,362,684 York Harbour Metals | TSXV: YORK | OTC: YORKF 19 Investor Presenta

  20. Slide 20: York Harbour Project – Highlights

    Slide 20: York Harbour Project – Highlights

    About the Project York Harbour Project – Highlights • Current Drilling Yielding High Grade Copper and Zinc Intersections • Mineralization Intersected in 75% of the Drill Holes • Permitted for an Additional 200 Drill Holes • #4 Adit Applied for Underground Drilling and Exploration • Induced Polarizat

  21. Slide 21: Contact

    Slide 21: Contact

    ADDRESS 1518 – 800 West Pender Street, Vancouver BC V6C 2V6 WEB yorkharbourmetals.com PHONE +1-778-302-2257 EMAIL info@yorkharbourmetals.com CONNECT Twitter @yorkharbour Instagram @yorkharbourmetalsinc LinkedIn linkedin.com/company/york-harbour-metals Facebook facebook.com/yorkharbourmetals

Source: Internet Archive copy of yorkharbourmetals.com

More decks from Naughty Ventures Corp.

All 10 Naughty Ventures decks