Slide 1: Aruma's Low Risk Gold Targets
ARUMA RESOURCES ARUMA’S LOW RISK GOLD TARGETS Peter Schwann Aruma Resources Limited – Amec Convention Managing Director 4-6 September 2012 www.arumaresources.com.au ASX: AAJ
Slide 2: Disclaimer / Competent Person's Statement
Disclaimer /Competent Person’s Statement The information in this presentation: was prepared with due care and attention and is current at the date of the presentation; is not an offer or recommendation to purchase or subscribe for securities in Aruma Resources Limited or to retain any securities
Slide 3: Company Rationale
Company Rationale • EXPLORING KNOWN GOLD AREAS IN W.A. • BUILDING A LOCAL HUB AROUND GLANDORE • USING NEW TECHNOLOGY IS ECONOMICAL TO – Test previously explored areas with known gold mineralisation – Test covered extensions of known gold mineralisation – Evaluate alteration and mineralisation remote
Slide 4: Company Snapshot
Company Snapshot Paul Boyatzis – Non Executive Chairman Experienced in capital and equity markets Peter Schwann – Managing Director Experienced geologist in exploration and mining Ki Keong Chong – Non Executive Director Established Lawyer in Asian Finance and Investment Banking Capital Structure Sha
Slide 5: Project Locations
Project Locations Glandore Project 40km east of Kalgoorlie-Boulder Glandore Hub (60km radius) Glandore, Bulong and Gindalbie projects totalling over 250km2 Jundee South Project 20km south of Jundee Mine Twin Hills Project Low Grade Mineralisation drilled Darlot East Project East
Slide 6: Glandore Gold Project
Glandore Gold Project Land area >57km2 Strong gold system 5 Fluid Flow Targets On major structures PoWs Approved Mining leases granted Heritage Clearance Drilling booked www.arumaresources.com.au ASX: AAJ
Slide 7: Glandore Thickness and Grade
Glandore Thickness and Grade Location Intersection From Axial Planar Fault** 10m at 10.27 g/t Au 58m 4m at 18.8 g/t Au 103m Supergene Zone** 8m at 10.4 g/t Au 18m (**Both these zones 9m at 8.37 g/t Au 17m at the northern end 9m at 3.43 g/t Au 15m Of Initial Leases) 2m at 43 g/t Au 38m 5m at 4.99 g/t
Slide 8: Glandore drilling targets from Fluid Flow
Glandore drilling targets from Fluid Flow Fluid Flow Study Completed Major Structures in Blue Yellow Ellipses are gold targets PoW approved for western targets Heritage Survey completed Drilling Booked for October www.arumaresources.com.au ASX: AAJ
Slide 9: Glandore drilling targets on Geology
Glandore drilling targets on Geology Good correlation with Geology Warm Colours = higher flows Black ellipses define Primary Targets Historic intersections in Gold solids Access negotiations underway www.arumaresources.com.au ASX: AAJ
Slide 10: Glandore Hub Leases
Glandore Hub Leases Leases in a 60km radius of Glandore www.arumaresources.com.au ASX: AAJ
Slide 11: Twin Hills Project
Twin Hills Project Project Holding 187km2 15km of defined gold anomalies Thick underexplored mineralisation Hole ID From Interval (m) g/t Au ppm Cu THR 301 25 22 1.04 NA THR 288 25 1 2.56 NA THR 331 50 20 0.54 NA WRC01 43 12 0.84 308 Including 53 1 1.79 2360 WRC03 32 28 0.86 182 WRC04 24 24 0.
Slide 12: Gindalbie Project
Gindalbie Project Project Holding 150km2 45km north of Glandore New Lease in Yellow Chip samples up to 25 g/t Lady Lauren line undrilled On major lineaments PoW approved Heritage Clearance done Drilling in November www.arumaresources.com.au ASX: AAJ
Slide 13: Laverton East Project
Laverton East Project New EL Granted Leases under shallow cover HyVista maps goethite over Gold anomaly 2m at 4.28 g/t in LEAC 31 Exploration focus in North Lease Targets for sampling www.arumaresources.com.au ASX: AAJ
Slide 14: Jundee South Project
Jundee South Project Drilling completed in August Drilling verifies soil anomalies Best gold assay of 1m at 18.6 g/t Second Phase drilling done 15 holes for 614m completed Holes to get strike of gold Quartz veins on contact Samples submitted www.arumaresources.com.au ASX: AAJ
Slide 15: Darlot East Project
Darlot East Project • 4km east of multi million ounce Darlot Mine • 7km Granite-Greenstone contact target • Gold hits in 1989 RC holes RW 1 - 1m @ 3.27g/t from 18m RW 2 - 4m @ 2.1g/t from 18m** RW 3 - 1m @ 0.75g/t from 25m RW 4 - 2m @ 0.33g/t from 25m RW 5 - 1m @ 10.2g/t from 21m ** above 4m stope w
Slide 16: Aruma's Next Steps
Aruma’s Next Steps GLANDORE • Fluid Flow Study defines targets on two major structures off the Majestic Structure • First Phase drilling on the western target areas cleared and ready to drill • Eastern areas of drilling to be done after first phase. TWIN HILLS • RC drilling on the northern lease
Slide 17: Aruma's Next Steps
Aruma’s Next Steps GLANDORE • Fluid Flow Study defines targets on two major structures off the Majestic Structure • Initial drilling on the extension of the western target areas booked • Heritage negotiations near completion on lake areas www.arumaresources.com.au ASX: AAJ
Slide 18: Company Summary
Company Summary Landholding rationalised Prospective landholding in the proven Eastern Goldfields Projects strategically located adjacent to established gold producers Treasury at 30 June 2012 ~$2.3M Current programs well funded Strategic focus on resources to develop Glandore as regiona