VRX Silica Ltd. · ASX:VRX
VRX Silica — Shareholder Meeting (November 2026)
28 slides from VRX Silica's shareholder meeting presentation, Nov 20, 2026
Slide 1: Annual General Meeting Presentation
To be renamed Ortus Minerals Limited (ASX Reserved:ORT) rsonal use only Annual General Meeting Presentation The most advanced pure-play silica sand company on the ASX November 2026
Slide 2: Important Information
Important Information Important Information Disclaimer This document has been prepared by VRX Silica Limited. The information contained in this document is for information purposes only and has been prepared for use in conjunction with a verbal presentation and should be read in that context. The in
Slide 3: Introducing VRX Silica | Setting the Scene
Introducing VRX Silica | Setting the Scene Introducing VRX Silica | Setting the Scene • Silica sand is one of the most heavily used raw materials in the world after air and water. • VRX Silica Limited (VRX) has Australia’s largest silica sand Ore Reserve, rsonal use only with the advanced Arrowsmith
Slide 4: Corporate Overview – VRX Silica
Corporate Overview – VRX Silica (ASX:VRX) CAPITAL SUMMARY SHARE REGISTER 4 A supportive, commodities focused share register, with a strong understanding of rsonal use only ASX Ticker VRX the resources sectors and the Company’s long term growth strategy Share Price1 A$/sh $0.031 Shares Outstanding #m
Slide 5: VRX Board and Management | Continuing to Evolve
VRX Board and Management | Continuing to Evolve BOARD OF DIRECTORS CHIEF EXECUTIVE OFFICER rsonal use only Peter Pawlowitsch Tony Swiericzuk Interim Chairman and Non-Executive Director Chief Executive Officer Senior executive: over 10 years’ experience in the Experienced mining executive with deep e
Slide 6: Silica Sand | Investment in the Energy Transition
Silica Sand | Investment in the Energy Transition Silica Sand | Investment in the Energy Transition • The current global demand for industrial silica sand is ~400Mtpa, anticipated Solar Panel Roof Window Screen Container Paints & Building to grow ~4.5% CAGR1 with low volatility over the next decade.
Slide 7: Priority Project Overview
Priority Project Overview 1 1 Arrowsmith Project Geraldton rsonal use only PORT Road haulage to port • High-grade project with compelling financials 1 Arrowsmith • Strategically located close to port and Brand Highway • The suite of Arrowsmith products will target the foundry and glass WESTERN marke
Slide 8: Multi-Generational Operation with Consistent Economic Performance
Multi-Generational Operation with Consistent Economic Performance +100 years of annuity-style cashflows from Arrowsmith to support the development of the high-value Muchea Project and VRX’s broader Project suite rsonal use only RESOURCES PRODUCTION SALES • One of the largest silica sand • Arrowsmith
Slide 9: Strong Multi-Generational Future Cashflow
Strong Multi-Generational Future Cashflow Arrowsmith and Muchea can deliver strong cashflow over the first 25 years of modelled life of mine, underpinned by a resource that supports a potential +100 year mine life and sustainable returns for shareholders rsonal use only A$m ~$71.3 million p.a. avera
Slide 10: Silica Sand Market
Silica Sand Market rsonal use only 10
Slide 11: VRX Strategically Positioned to Meet Growing APAC Demand
VRX Strategically Positioned to Meet Growing APAC Demand The engine of the global silica sand demand, regional demand is led by China and India 9.4% >60% 5.6% p.a. rsonal use only S. Korea 38.6% China 8.2% of global silica sand forecast APAC market Japan consumption is in Asia-Pacific¹ growth, 2026-
Slide 12: Strong Demand Growth in Arrowsmith's Target Markets
Strong Demand Growth in Arrowsmith’s Target Markets The regional market is forecast to reach US$11.5bn by 2034, with glass and foundry making up over half the demand Asia-Pacific Silica Sand Market (US$m) Demand by end use, 2025 rsonal use only 2020-2025 historical, 2026-2034 forecast Share of Asia-
Slide 13: Premium Markets
Premium Markets Amid the rapid development of technology industries and the global energy shift, demand for ultra-high grade silica sand is growing rsonal use only • Silica sand is one of the most heavily used raw materials in the world after air and water. Only a small share of it is pure enough fo
Slide 14: Arrowsmith Silica Sand Project
Arrowsmith Silica Sand Project rsonal use only + 100 years of production 14
Slide 15: Arrowsmith Overview
Arrowsmith Overview Well positioned to supply the growing foundry and glass markets in the Asia-Pacific region • VRX has been granted the state environmental and mining permits for Arrowsmith with final rsonal use only amendments to the permits pending and expected to be granted Q4 CY26 1. • The pro
Slide 16: Arrowsmith – BFS Economics
Arrowsmith – BFS Economics1 Development of a world class silica sand project • The BFS contemplates processing a total of 52Mt over a 25-year life of mine, representing ~24% of Arrowsmith’s 221Mt Ore Reserve and only ~4% of VRX’s total Mineral Resource. The Ore Reserve alone supports +100 years of p
Slide 17: Arrowsmith - Tried and Tested Processing Flowsheet
Arrowsmith - Tried and Tested Processing Flowsheet Simple processing flowsheet with minimal complexities rsonal use only 3 Trommel screening 1 Open pit mining 4 Attritioning cells • A conventional washing and sizing circuit used in silica sand operations worldwide, with no unproven processing 5 Hydr
Slide 18: A Simple, Low-Impact Approach to Silica Mining
A Simple, Low-Impact Approach to Silica Mining From pit to rehabilitation • Unlike hard rock silica operations, Arrowsmith doesn’t require drilling, blasting or toxic reagents. The sand is dug, washed and trucked, keeping the operation simple, low-cost and low-risk. rsonal use only Clear Mine Screen
Slide 19: Silica Sand Offtakes
Silica Sand Offtakes Six conditional binding contracts with established foundry and glass supplier across four Asian markets VRX Silica has executed six binding offtake contracts for 960ktpa across four countries, for rsonal use only Path to bankable offtake ~50% of production at Arrowsmith. JAN 202
Slide 20: Arrowsmith – the Largest Ore Reserve Among its ASX Listed Australian Peers
Arrowsmith – the Largest Ore Reserve Among its ASX Listed Australian Peers 221 Mt at 99.5% SiO₂ - larger than any other ASX listed Australian silica sand development project • Arrowsmith is the largest Ore Reserve among its ASX listed silica sand Arrowsmith Ore Reserve (JORC 2012) rsonal use only Au
Slide 21: Arrowsmith is on track for First Shipments in early CY28
Arrowsmith is on track for First Shipments in early CY28 Indicative Project development timeline Arrowsmith Muchea rsonal use only Q4 CY26 Q1 CY27 Q1 CY28 Approval amendments Process plant First trial shipments to finalised construction starts offtake customers Q4 CY26 Q3 CY27 Site establishment & e
Slide 22: Muchea Silica Sand Project
Muchea Silica Sand Project rsonal use only 22
Slide 23: Muchea Overview
Muchea Overview Large scale, world class, very high-grade, low impurity silica sand project rsonal use only • Muchea is located ~50km north of Perth, within close proximity to key established infrastructure including transport, power and port. • Muchea is one of Australia’s largest high grade silica
Slide 24: Muchea - BFS Economics
Muchea - BFS Economics1 Higher value product, higher margin than Arrowsmith • The pre-production funding requirements for Muchea are expected to be funded from cashflow generated by Arrowsmith. rsonal use only JORC Indicated and Inferred Resource 208Mt @ 99.6% SiO2 supporting over 100 years of produ
Slide 25: Investment Thesis
Investment Thesis Investment Thesis Every semi-conductor chip begins with high purity silica sand, positioning premium silica assets at the foundation of the digital economy • The VRX suite of silica sand projects in Western Australia have the potential to be multi- generational projects with +100 y
Slide 26: Tony Swiericzuk, Chief Executive Officer
rsonal use only Tony Swiericzuk Chief Executive Officer Ground Floor, 52 Kings Park Road West Perth WA 6005 Phone: 08 9226 3780 Email: info@vrxsilica.com.au
Slide 27: Cashflow Assumptions Table
Cashflow Assumptions Table Assumption Units Arrowsmith North Muchea Combined Project Study basis 2026 BFS Update 2019 BFS AN 2026 + Muchea 2019 rsonal use only First production year year 2028 2031 2028 Mine life modelled years 25 25 - Production Plant feed at full rate Mtpa 2.20 2.24 4.44 Product yi
Slide 28: Silica Sand Resources and Reserves
Silica Sand Resources and Reserves (as at 30 September 2026) rsonal use only 28