Vale S.a. · BMFBOVESPA:VALE3

Vale — Investor Day (2017)

71 slides from Vale's investor day presentation, 2017

  1. Slide 1: Vale Day New York 2017: The premium mining player

    Vale Day VALE New York 2017 The premium mining player a>) ae ao 0 © 90 ~G- o> CoD YY

  2. Slide 2: Disclaimer

    isclaime ““This presentation may include statements that presenting Vale's expectations about future events or results. All statements, when based upon expectations about the future, and not on historical facts, involve various risks and uncertainties. Vale cannot guarantee that such statements will

  3. Slide 3: Fabio Schvartsman, CEO

    Fabio Schvartsman CEO

  4. Slide 4: Vale will generate more value for shareholders than its global mining peers

    4 Vale will generate more value for shareholders than its global mining peers Strategic pillars Performance Clear Governance Sustainability Improvement Strategy Enhancement Benchmark

  5. Slide 5: Enhancing performance while improving capital allocation

    5 Enhancing performance while improving capital allocation • Capital allocation – Rigorous capital allocation process based on returns • Cost efficiency – Integration and meritocracy Performance Improvement – Automation and cost management • Price realization – Product portfolio to capture “flight t

  6. Slide 6: Vale is using spot nickel prices to approve capital projects

    6 Vale is using spot nickel prices to approve capital projects resulting in a capex reduction of US$ 1.6 billion in 2017-2018 Nickel capex Projects reviewed and capex deferrals US$ billion Updated production plan Previous production plan -40% -53% • VNC dry stacking 1.9 1.5 • Voisey’s Bay mine expan

  7. Slide 7: Focus on competitiveness to increase Ferrous Minerals EBITDA by 2020

    7 Focus on competitiveness is expected to increase EBITDA of Ferrous Minerals by US$ 1.2 - 2.0 billion by 2020 vs. 2017 EBITDA/t¹, US$/t, 2017E vs. 2020E 0.5 – 1.0 3.0 – 5.0 0.5 0.5 – 1.5 0.5 1.0 – 1.5 S11D Innovation and Structured cost Operational Supply chain Total automation management yield 2 o

  8. Slide 8: Strong balance sheet while leveraging assets and fostering EBITDA growth

    8 Focus on a strong balance sheet while leveraging the assets and fostering EBITDA growth • Iron ore: margins, premium products and flexibility • Base Metals – Preserve optionality in nickel (Electric Vehicles) Clear – Increase copper production (Salobo III, Victor and Hu’u) Strategy • Coal: leverag

  9. Slide 9: Adapted production plan to maximize cash flow and supply discipline

    9 Vale has adapted its production plan in order to maximize cash flow generation and reinforce supply discipline Iron ore production volumes¹ Nickel production volume Mtpy Northern System kt Updated production plan Nominal capacity Previous production plan 450 -45 -54 -33 -15 -15 ~390 ~400 ~400 ~400

  10. Slide 10: Vale will become cash flow positive in all nickel operations

    10 Despite lower volumes, Vale will become cash flow positive in all nickel operations Unit cash cost after by-product credits US$/t Operation1 2017E 2018E Sudbury 3,287 2,983 US$ 1,621 per ton in 2019E Thompson 10,488 8,094 Voisey’s Bay 3,206 4,680 VNC 10,153 9,717 PTVI 6,463 6,329 Onça Puma 8,622

  11. Slide 11: Better governance and Novo Mercado

    11 Better governance and Novo Mercado • December 22nd, 2017: important date for Vale • Transformation of Vale into a corporation Governance • Two independent board members Enhancement • Re-rating

  12. Slide 12: Sustainability

    12 Sustainability • Focus on systematic planning and execution Sustainability Benchmark • Beyond Vale’s operations

  13. Slide 13: Paving the way to create value

    13 Paving the way to create value

  14. Slide 14: Luiz Eduardo Osorio

    Luiz Eduardo Osorio Executive Officer, Sustainability and Institutional Relations

  15. Slide 15: Progress required to become a reference in sustainability

    15 Progress required to become a reference in sustainability Vale’s Pulse Reputation Index¹ Main progress in key areas >80 >70 >60 >40 <39 Excellent Strong Median Weak Poor 65 • Reduction in total injury time² from 11.2 in 2007 to 2.1 in 2017 60 • Creation of Renova Foundation in July 55 2016 50 • R

  16. Slide 16: Renova Foundation initiatives are on track

    16 Renova Foundation initiatives are on track • 8.2 thousand families with financial assistance • 1.5 thousand families from traditional communities and indigenous people are assisted under Renova Project scope: food, water and economic security • 101 tributaries were rehabilitated • 800 hectares we

  17. Slide 17: In 2018, Renova will focus on compensation and rebuilding villages

    17 In 2018, the Renova Foundation will focus on the compensation for the affected families and on rebuilding the villages Recovered tributary Rebuilding villages • Reconstruction of Bento Rodrigues, Paracatu de Baixo and Gesteira • Design of new urban plans based on public hearings • Initiation of c

  18. Slide 18: Coming next: new approach and goals for sustainability

    18 Coming next: new approach and goals for sustainability Dispersed initiatives Systematic planning and execution Redefinition of purpose, operational and Sustainability areas with very good initiatives and organizational models aligning the Sustainability, ideas but not interconnected, leading to V

  19. Slide 19: Alexandre Pereira

    Alexandre Pereira Executive Officer, Global Business Support

  20. Slide 20: Global Business Support as driver to integrate the organization

    20 Global Business Support is the main driver to connect and integrate the entire organization Procurement Operations Energy Capital Digital excellence projects technology Implement a Shape Secure a Implement strong Integrate global, integrated competitiveness sustainable portfolio technologies and

  21. Slide 21: Global Business Support will drive the digital revolution across Vale

    21 Global Business Support will drive the digital revolution across Vale to transform the performance of our core business Focus areas Productivity increase Examples of technologies Asset performance > 8-10% 1 • Autonomous trucks • Advanced and predictive analytics 2 Maintenance > 11-14% • Smart pla

  22. Slide 22: Global Business Support building the Vale of the future

    22 Global Business Support will play a key role in building the Vale of the future, increasing the competitiveness of all businesses Globally connected Examples of contributions • Develop effective use of data • Unlock new productivity levels • Integrate functions, expand best practices and leverage

  23. Slide 23: Peter Poppinga

    Peter Poppinga Executive Officer, Ferrous Minerals and Coal

  24. Slide 24: First wave of competitiveness generated gains of US$ 3.3 billion

    24 Initiatives from the first wave of competitiveness improvement, ending 2016, generated gains of US$ 3.3 billion vs 2014 US$ million US$ 3.3 bi 11,321 8,536 87 861 10,476 735 608 1,037 1,393 2,969 EBITDA Price Exchange Bunker Commercial Volume Freight COGS Others EBITDA 2014 rate oil initiatives 2

  25. Slide 25: Second wave of competitiveness based on further integration

    25 In 2017, Vale started its second wave of competitiveness based on further integration, capturing the structural "flight to quality” trend 1 S11D ramp-up 2 Innovation and automation development Performance Improvement 3 Structured cost management program implementation 1 Operational yield¹ improve

  26. Slide 26: All S11D truckless systems are operating

    26 All of S11D truckless systems are operating, with their start-ups ahead of schedule 1 2 3 System 3

  27. Slide 27: Truckless systems operating at over 80% capacity

    27 The four truckless systems are operating at over 80% capacity, enabling good performance of the S11D ramp-up 1 2 Truckless system productivity S11D production in 2017 3 Tons per hour, Jan-Nov 2017 Mt ~2.5 ~22.0 19.5 8,000 6,500 Nominal Capacity Realized Jan-Nov 2017 Dec 2017E 2017E Realized

  28. Slide 28: S11D ramp-up will further decrease Vale's costs

    28 S11D ramp-up will further decrease Vale’s costs 1 Production volumes C1 cash cost1 2 Mt US$/t 3 90 - 47% 70 - 80 - 31% 14.5 50 - 55 11.2 7.7 ~22 2017E 2018E 2019E 2020E Current Current Expected Vale² Carajás³ S11D 4 1 C1 cash cost at the port (mine, plant, railroad and port, excluding royalties)

  29. Slide 29: Innovation and automation will reduce costs by US$ 0.5/t

    29 Investments in innovation and automation will improve operational efficiency and reduce costs by US$ 0.5/t in 2020 1 2 3 US$ 0.3/t US$ 0.2/t MINE AND PLANT LOGISTICS • Autonomous trucks and drills • Train control optimization • Fully automatic stackers and • Semi-autonomous locomotives reclaimers

  30. Slide 30: Structured cost management pilot in pelletizing plants

    30 The structured cost management pilot project in the pelletizing plants will be rolled out to the entire iron ore business 1 2 Pilot project for pellets Expected pellets costs reduction 3 US$/t • Methodology - Mapping processes - Gap and goal definition - Action plan implementation 1.0 - 1.5 • Imp

  31. Slide 31: Highest operational yield among peers

    31 Highest operational yield¹ among peers as a result of increased share of dry processing and strip ratio optimization 1 2 Operational yield1, % Peer average Vale 3 +17bps +10bps 54 +4bps 50 51 46 41 40 41 41 37 37 2014 2015 2016 2017E 2020E 1 Operational yield measured by global recovery rate. Glo

  32. Slide 32: Production plan adapted to maximize margins

    32 Vale has adapted its production plan in order to maximize margins 1 Production volumes¹ Global blended volumes 2 Mtpy Northern System Mt 3 Nominal capacity 450 ~390 ~400 ~400 ~400 ~400 ~365 > 100 ~75 217 230 230 230 200 171 40 16 2017E 2018E 2019E 2020E 2021E 2022E 2015 2016 2017E 2018E The incre

  33. Slide 33: Product portfolio adjusted to market demand

    33 Vale has adjusted its product portfolio and quality according to market demand 1 Sales composition1, % 2 2 3 Carajás Blend Southern Southeastern Others 37% 40% 42% 40% 5% 14% 25% 25% 35% 22% 19% 23% 8% 19% 18% 16% 2015 2016 2017E 2018E 1 Does not include pellets and pellet feed for pelletizing 2

  34. Slide 34: Integrated Operations Center to support supply chain management

    34 The Integrated Operations Center (COI) will support supply chain management, maximizing iron ore business margins 1 2 Value creation opportunities 3 • Better sales price realization and product quality management • Improvements in the planning process for sales and operations from mine to port •

  35. Slide 35: Price realization will progressively improve

    35 Price realization will progressively improve based on constant supply chain optimization and the structural "flight to quality” trend 1 2 Vale’s average price premium¹, US$/t 3 3.5 – 4.5 ~3.5 1.7 2016 2017E 2018E The improvement in price realization is expected to add up to US$ 350 million in 201

  36. Slide 36: Continuous declines in iron ore grades on the supply side

    36 On the iron ore supply side, there are continuous declines in iron ore grades and in investments in new mines to maintain quality 1 2 China iron ore imports average Fe content FAI1 in ferrous mining industry in China 3 % RMB billion 62 200 61.7 Fe content imported ore into China Fe content ex-Car

  37. Slide 37: Structural flight to quality trend

    37 Changes in the Steel Industry and declines in iron ore grades are leading to a consistent and structural “flight to quality” trend 1 2 3 Contaminants discount Price spread 65% and 58% Fe iron ore US$/t US$/t, net of Fe % adjustment 1% SiO2 Discount (4.5-6.5%) 50 1% SiO2 Discount (6.5-9.0%) 8 1% A

  38. Slide 38: Increasing pellet production to respond to strong demand

    38 Vale is increasing its pellet production to respond to a strong market demand 1 Pellets production volumes Highlights 2 Mtpy 3 Nominal capacity1 • Restart of São Luis and Tubarão I/II pellet plants 65 scheduled for 1H18 ~60 ~60 - São Luis production capacity of 7.5 Mtpy ~55 - Tubarão plants I and

  39. Slide 39: Competitiveness measured by normalized EBITDA/t to increase

    39 Vale’s competitiveness measured by normalized EBITDA/t1 is expected to increase by another US$ 3-5/t in 2020 US$/t 41% 41 - 43 38 37 34 27 2014 2015 2016 2017E 2020E In 2017, Vale already captured US$ 1.0/t in supply chain optimization 1 Adjusted EBITDA of Ferrous Minerals (excluding manganese an

  40. Slide 40: Peter Poppinga

    Peter Poppinga Executive Officer, Ferrous Minerals and Coal

  41. Slide 41: Coal business to generate solid results

    41 Coal business will generate solid results by concluding the ramp-up and exploring growth options 1 Project Finance signed on November 27th, 2017 2 Leverage mine and logistics Clear 3 Foster mineral exploration Strategy 1 Successfully conclude the ramp-ups of Moatize and Nacala 2 Consolidate margi

  42. Slide 42: US$ 2.7 billion Project Finance concludes restructuring

    42 US$ 2.7 billion Project Finance concludes the restructuring and optimization of the business portfolio 1 2 2017 Vale coal transactions Proforma production costs through NLC – 2017E 3 US$ million US$/t Net Nacala tariff US$ 15/t 2,730 3,500 30 15 93 78 770 1 Equity transaction Project Finance Tota

  43. Slide 43: Sound ramp-ups of Moatize and Nacala Logistic Corridor

    43 Sound ramp-ups of Moatize and Nacala Logistic Corridor increased production and sales volumes in 2017 1 2 Production volume1,2 Shipment volume1,2 Mt Thermal Mt Beira Metallurgical Nacala +113% +44% 11.7 12.4 4.5 1.3 8.6 11.1 5.5 7.2 2.2 4.9 5.0 2.0 6.4 1.8 1.6 3.7 3.7 3.1 3.4 3.5 2014 2015 2016 2

  44. Slide 44: Moatize more competitively positioned on the cost curve

    44 The conclusion of the ramp-up will enable Moatize to be more competitively positioned in the industry cost curve 1 2 Moatize production volume Proforma production cash cost at the port Mtpy US$/t Non-recurring 1 Net Nacala tariff Production cost 2 109 4 20 20 18 18 15 26 20 20 16 78 19 21 70 67 1

  45. Slide 45: Greater volumes and prices support EBITDA improvement

    45 Greater volumes and higher market prices support the improvement of the business EBITDA 1 2 EBITDA 2016 vs. 2017E EBITDA 2017E vs. 2018E – Stable price scenario 3 US$ million US$ million 4 212 56 3 353 71 481 127 60 353 320 395 1 2016 Sales Volumes Cost Others Australian 2017E 2017E Volumes Cost

  46. Slide 46: Jennifer Maki

    Jennifer Maki Executive officer, Base Metals

  47. Slide 47: Enhancing current performance while consolidating position for upside

    47 Enhancing current performance while consolidating Vale’s position for potential upside 1 Improve competitiveness of operations 2 Transition to a smaller footprint in nickel Performance Improvement 1 Align investments and production based on the market conditions 2 Preserve optionality in nickel (

  48. Slide 48: Changes to ensure all assets contribute to positive cash flow

    48 Changes to ensure all assets contribute to positive cash flow Asset reviews 1 • Detailed review across all operations, especially nickel 2 – Reviewed at mine level within Canadian integrated operations • Positive cash generation at low prices and reduction of non-value adding nickel units with li

  49. Slide 49: Initiatives across all operations to increase competitiveness

    49 Initiatives across all operations to increase competitiveness under current challenging market conditions 1 ‐ Develop ‘fit for purpose’ organization ‐ Reduce C1 cost reaching US$ 7,600/t in 2018 2 ‐ Implement structured cost management with plan to achieve US$ 7,000/t by 2019 program ‐ Solve stak

  50. Slide 50: Transitioning to a smaller footprint in nickel

    50 Transitioning to a smaller footprint in nickel by calibrating investments and production to reflect current market conditions 1 2 Reduction of nickel production forecast1 kt In 2017: -45kt • Successful transition to single furnace in Sudbury – Completed with no impact on production 310 • Ramp-up

  51. Slide 51: Benefits from a single furnace operation in Sudbury

    51 Benefits from a single furnace operation in Sudbury 1 2 Surface plant unit cost AER/SFU³ project capex US$, total finished nickel CCNR¹ + FMW² to Clydach US$, million 3,161 182 2,584 153 2,498 2,405 141 93 19 2016 2017E 2018E 2020 Target 2016 2017E 2018E 2019E 2020E Following the 2017 flowsheet t

  52. Slide 52: Improving stability of VNC operations and bringing a partner

    52 Focus continues to be on improving stability of VNC operations and bringing a partner to close funding gap in the next few years 1 2 Vale New Caledonia Value generation opportunities 3 • Operational improvements to address bottlenecks¹ to increase production • Reduction of over US$ 150 million in

  53. Slide 53: Electric vehicles bring upside to the market longer-term

    53 Electric vehicles bring upside to the market longer-term Market share of electric passenger vehicles Nickel demand for the battery market 1 Battery electric and plug-in hybrids only Battery electric and plug-in hybrids only 2 Internal Combustion Engines (ICE) Nickel in non-EV batteries 3 Nickel i

  54. Slide 54: Targeted investments and options for growth in nickel

    54 Targeted investments and options for growth under the right nickel market conditions 1 2 3 Copper Cliff Mine Project – Phase 1 Sudbury exploration Indonesian growth options • Replacement ore with full • Well positioned on prospective • World class laterite ore deposits production by 2021 land in

  55. Slide 55: Increase copper production

    55 Increase copper production 1 Salobo III Victor Hu’u 2 3 • Second expansion to 36 Mtpy • High grade polymetallic project • Project located in Indonesia and • Production of 50 ktpy¹ of copper in Sudbury basin 80% owned by Vale concentrate by processing lower • Potential for over 500 kt of • FEL I t

  56. Slide 56: Consolidate around smaller nickel business and quality copper assets

    56 Vale plans to consolidate around a smaller nickel business and leverage the quality of the copper assets Nickel Copper1 kt kt Sudbury Sudbury Thompson Thompson Voisey's Bay Voisey's Bay Sorowako Salobo Onça Puma VNC Sossego 438 422 424 433 438 287 263 262 268 266 2017E 2018E 2019E 2020E 2021E 201

  57. Slide 57: EBITDA will respond to positive price movements from EV demand

    57 EBITDA will directly respond to positive price movements from increased demand by electric vehicles EBITDA 2020, US$ billion Copper price (US$/t) 5,500 6,000 6,500 7,000 7,500 With a transformed 10,000 1.8 2.0 2.2 2.4 2.7 business, Vale’s nickel operations 12,000 2.3 2.6 2.8 3.0 3.2 Nickel price

  58. Slide 58: Luciano Siani Pires, CFO

    Luciano Siani Pires CFO

  59. Slide 59: A glimpse of Vale in 2020

    59 A glimpse of “Vale in 2020” US$ billion EBITDA less sustaining scenarios Return on Assets Total assets¹ (prices in US$) Pre-tax I II III I II III 55/t 60/t 65/t Iron ore 37.2 9.3 11.1 13.0 25% 30% 35% 400 Mt 10,000/t 12,000/t 14,000/t Nickel operations 19.8 0.6 1.2 1.8 3% 6% 10% Ni 268 kt, Cu 140

  60. Slide 60: Total shareholder return will improve based on several levers

    60 Total shareholder return will improve significantly based on several levers Multiple re-rating 1 Better governance 2 Predictable performance and capital allocation Governance Improved Cash Flows 1 Streamlined and optimized asset portfolio 2 Optimized capital expenditures Clear Strategy 3 Reduced

  61. Slide 61: Novo Mercado listing on December 22nd should bear fruit

    61 Novo Mercado listing on December 22nd should bear fruit in the near future 1 2 2018E EV/EBITDA¹ Highlights 6.3x • Migrating to Novo Mercado ahead of schedule on December 22nd, 2017 6.1x • Benchmark transaction in the Brazilian Market, with Median of Peers: 5.9x a participation of 80% of retail in

  62. Slide 62: Consistent track record enhancing investor confidence

    62 Consistent track record enhancing investor confidence and enabling a higher multiple 1 Iron ore and pellets EBITDA breakeven landed-in-China Nickel operations cash costs after by-products 2 US$/t US$/t 9,681 60.7 55.8 54.3 6,715 7,145 7,243 34.6 5,726 28.9 2012 2013 2014 2015 2016 2017 2018 2019

  63. Slide 63: Vale's asset portfolio will be further simplified

    63 Vale’s asset portfolio will be further simplified 1 Non-core 2 3 Adjacent 4 Cubatão Eagle MRS VLI Downs Iron ore Pellets CSI MRN Core Cash Flow Drags Coal Copper Manga Mosaic nese Samarco Pre-Op Nickel Expenses CSP Biopalma Aliança REFIS Financial Expenses

  64. Slide 64: Core assets have low-cost options to increase production

    64 Vale’s core assets have low-cost options to increase production and returns 1 Project Volume IRR Size of investments 2 3 4 Moatize Expansion Coal 5 Mtpy¹ TBD TBD (2020’s) Copper Salobo III ~50 Ktpy² 15% - 17% ~US$ 400 million³ Onça Puma 2nd furnace 15 Ktpy² over 15% ~US$ 250 million Nickel Indone

  65. Slide 65: Assets adjacent to the core present potential opportunities

    65 Assets adjacent to the core present potential opportunities 1 Normalized EBITDA 2020 2 Vale’s share (Vale’s share) Potential strategy 3 4 11.0% US$ 240 million1 After lock in, decide to increase Mosaic exposure or divest VLI 37.6% US$ 425 million Expansion – huge pent-up demand for logistics in B

  66. Slide 66: Non-core assets have an exit plan

    66 Non-core assets have an exit plan Reference: US$ 1 billion 1 2 Divestiture Potential proceeds Potential strategy 3 4 Biopalma 2018-2019 Sale after asset turnaround Eagle Downs 2018 Ongoing sales process Deal signed in Nov-17 Cubatão 2H18 Expected closing in 2H18 Search for strategic opportunities

  67. Slide 67: Capital expenditures will remain low

    67 Capital expenditures will remain low even incorporating new growth projects 1 2 US$ billion 3 Growth 4 Sustaining Replacement Growth non-approved 4.1 3.8 4.2 4.0 0.1 0.5 3.7 0.3 0.9 3.2 0.5 0.9 2.4 0.6 0.7 0.6 0.3 2.6 2.6 2.6 2.2 2.2 1.7 0.9 0.4 2017E 2018E 2019E 2020E 2021E 2022E

  68. Slide 68: Cash Flow Drags are expected to decline

    68 Cash Flow Drags are expected to decline 1 2 US$ million 2017E 2018E 2019E 2020E Reduction 3 4 Samarco¹ 470 393 215 144 ~69% Potential decision in REFIS 490 490 Brazilian Supreme Court Pre-operating 250 110 35 25 ~90% expenses Financial 1,600 - 1,700 1,000 - 1,100 600 - 700 550 - 650 ~ 60 - 65% Ex

  69. Slide 69: Vale will generate substantial cash flow over the next 3 years

    69 As a result, Vale will generate substantial cash flow over the next 3 years 1 Free Cash Flow accumulated¹ 2018-2020, US$ billion 2 3 Nickel price (US$/t) 4 10,000 12,000 14,000 Iron ore price (US$/t) 55 ~13 ~14 15 - 16 60 17 - 18 ~19 20 - 21 65 22 - 23 ~24 ~25 ¹ Assumes US$ 1.5 billion in divestm

  70. Slide 70: Resulting in significant shareholder return

    70 Resulting in significant shareholder return Value vision 2020, US$ billion EBITDA1 1 2 Enterprise Value 13 16 19 3 6.0x 78 96 114 Normalized 4 multiples 6.5x 84 104 124 7.0x 91 112 133 Net debt 10 Market cap 68 - 81 86 - 102 104 - 123 Accumulated dividends 8 14 20 Total Shareholder Return2 (%) 9

  71. Slide 71: Slide 71