Slide 1: Community Consultative Committee
Community Consultative Committee 28 March 2017
Slide 2: New CCC Guidelines, DPE, Nov 2016
New CCC Guidelines, DPE, Nov 2016 Operate CCC in accordance with new CCC Guidelines for State Significant Projects, November 2016, NSW Planning and Environment Agree and Sign Code of Conduct Agreement prior to commencement of Meeting • Independent Chairperson • Members Sign Declaration of Pecu
Slide 3: New CCC Guidelines, Nov 2016
New CCC Guidelines, Nov 2016 Appointment of Independent Chairperson by DPE • Currently advertising for nominees to create a pool of chairpersons • DPE will appoint the Chairpersons to the CCC’s from this pool • DPE accepted continued appointment of Councillor Godfrey Adamwaite and the continued re
Slide 4: New CCC Guidelines, Nov 2016
New CCC Guidelines, Nov 2016 Committee Membership • Up to 7 community representatives • A Council Representative • Up to 3 company representatives • Change to some procedures e.g. selection and replacement of members; • New members apply to Independent chair who makes recommendation for DPE to dec
Slide 5: New CCC Guidelines, Nov 2016
New CCC Guidelines, Nov 2016 ACOL Responsible for: • Provide CCC with copies of consent, licenses, Management Plans etc • Results of environmental monitoring • Annual Review Reports • Reports on community concerns or complaints and ACOL’s response • Consult with CCC before lodging any applications
Slide 6: New CCC Guidelines, Nov 2017
New CCC Guidelines, Nov 2017 Community Members responsible for: • Communicate & disseminate information about ACOL with broader community • If agreed by committee, release statements to Media (only Chairperson can speak publicly on behalf of committee) • Individuals can make comments to the media
Slide 7: Action List – Not updated yet
Action List – Not updated yet ITEM RESPONSIBILITY PROGRESS UPDATE Tree Screen at New England Hwy requires maintenance PB Nothing to report at this stage Poor housekeeping at two privately tenanted, Ashton owned PB Routine inspections completed in early residences, in Camberwell requires addressing N
Slide 8: Ashton Mine Production CY2017
Ashton Mine Production CY2017 2017 Budget 2017 Actual ytd ytd ROM (t) 264,303 539,616 Product Coal (t) 104,912 242,575 Total Coal Sales (t) 177,160 239,954 8 24 March 2017 8
Slide 9: Current Mining Area
Current Mining Area 9 24 March 2017 9
Slide 10: Environment Monitoring Data
b. Environment Monitoring Data • Meteorological Rainfall • Air Quality Depositional Dust Gauges – Total suspended dust PM10 – Tapered Element Oscillating Microbalance (TEOM) • Surface Water Glennies Ck, Bowmans Ck and Hunter River • Groundwater various aquifers • Noise 10 24 March 2017 10
Slide 11: Rainfall
Rainfall 2016 Total Rainfall: 754mm 11 24 March 2017 11
Slide 12: Air Quality & Noise Monitoring Locations
Air Quality & Noise Monitoring Locations Proposed new PM10 Monitoring Station, April 17, as required by EPL Note: • Sites 1, 2 & 3 HVAS - TSP decommissioned in Nov 16 in accordance with EPL. 12 24 March 2017 • Site 2 (PM10) TEOM will be removed once monitoring commences at the new site. 12
Slide 13: Depositional Dust
Depositional Dust On-site Dust Gauges 13 24 March 2017 13
Slide 14: Total Suspended Dust
Total Suspended Dust Note: Sites 1, 2 & 3 decommissioned in Nov 16 as per EPL 14 24 March 2017 14
Slide 15: Total Suspended Dust
Total Suspended Dust 15 24 March 2017 15
Slide 16: PM10 Dust – Site 1 (north Camberwell)
PM10 Dust – Site 1 (north Camberwell) 16 24 March 2017 16
Slide 17: PM10 Dust – Site 2 (south Camberwell)
PM10 Dust – Site 2 (south Camberwell) 17 24 March 2017 17
Slide 18: PM10 Dust – Site 3 (far east of Camberwell)
PM10 Dust – Site 3 (far east of Camberwell) 18 24 March 2017 18
Slide 19: PM10 Dust – Site 8 (east of Camberwell)
PM10 Dust – Site 8 (east of Camberwell) 19 24 March 2017 19
Slide 20: Surface Water Sampling Locations
Surface Water Sampling Locations 20 24 March 2017 20
Slide 21: Surface Water Quality – pH
Surface Water Quality – pH 21 24 March 2017 21
Slide 22: Surface Water Quality – EC
Surface Water Quality – EC 22 24 March 2017 22
Slide 23: Surface Water Quality – pH
Surface Water Quality – pH 23 24 March 2017 23
Slide 24: Surface Water Quality – EC
Surface Water Quality – EC 24 24 March 2017 24
Slide 25: Surface Water Quality – pH
Surface Water Quality – pH 25 24 March 2017 25
Slide 26: Surface Water Quality – EC
Surface Water Quality – EC 26 24 March 2017 26
Slide 27: Groundwater Sampling Locations
ACP Groundwater Groundwater Sampling Locations Monitoring Network 27 24 March 2017 27
Slide 28: Groundwater – Standing Depth
Groundwater – Standing Depth To be updated 28 24 March 2017 28
Slide 29: Groundwater – EC
Groundwater – EC To be updated 29 24 March 2017 29
Slide 30: Noise Monitoring
Noise Monitoring Attended noise monitoring is conducted Monthly. There were no exceedances during the reporting period 30 24 March 2017 30
Slide 31: Independent Compliance Audit
Independent Compliance Audit Report finalised 19 December 2016 Copy forwarded to Community Consultative Committee members Audit covered period 10 Oct 2013 – 19 June 2016 Reviewed 47 approvals and associated environmental documents Identified 27 non‐compliances (16 were administrative) • No
Slide 32: Complaints
Complaints One Complaint reported to DPE on 28/01/17 at 8:09am regarding ‘operational and mine noise’. • A review of ACOL operations indicated there was minimal site operations occurring at the time. • Investigations indicated ACOL contribution to noise levels at the time were minimal. • Report prov
Slide 33: Environmental Update
Environmental Update 2016 Annual Review to be submitted by 31st March 2017 • Copy to be provided to CCC members Review Environmental Management Plans by 30 June 2017 • Within 3 months of Independent Environmental Audit and completion of Annual Review • Copy of updated plans to be made available
Slide 34: New Website
New Website New website Easy to use format Up‐to‐date environmental monitoring data Approvals Management Plans 34 24 March 2017 34
Slide 35: Ashton Coal website screenshot
Mining - Ashton Coal x (SS [enh w <= X | © wwwashtoncoal.com.au arx|a #4 AshtonCoal ABOUT SUSTAINABILITY PUBLICATIONS -—LICENCES & APPROVALS «CAREERS «CONTACT US $0.36 YAL (aBouT us} { SUSTAINABILITY } WHO WE ARE ENVIRONMENT COMMUNITY + + + (COMPLIANCE } (PEOPLE GETIN TOUCH} LICENCES AND. CAREERS CO
Slide 36: South East Open Cut Project (SEOC)
f. South East Open Cut Project (SEOC) Amendment was lodged with DPE as advised last meeting. Was placed on public exhibition by DPE. Application made to modify Consent conditions ‐ 28 private submission, 7 group submissions and 5 Agency submissions. Reply to submissions currently being prepa
Slide 37: Camberwell update
Camberwell update Camberwell property • 33 homes tenanted, 1 vacant to be tenanted • 4 homes vacant ‐ care and maintenance 37 24 March 2017 37
Slide 38: Any Questions?
Any Questions? 38 24 March 2017 38