Yancoal Australia Ltd. · ASX:YAL

Yancoal Australia — Corporate Update (March 2017)

38 slides from Yancoal Australia's corporate update, Mar 28, 2017

  1. Slide 1: Community Consultative Committee

    Community Consultative Committee 28 March 2017

  2. Slide 2: New CCC Guidelines, DPE, Nov 2016

    New CCC Guidelines, DPE, Nov 2016  Operate CCC in accordance with new CCC Guidelines for State Significant Projects, November 2016, NSW Planning and Environment  Agree and Sign Code of Conduct Agreement prior to commencement of Meeting • Independent Chairperson • Members  Sign Declaration of Pecu

  3. Slide 3: New CCC Guidelines, Nov 2016

    New CCC Guidelines, Nov 2016  Appointment of Independent Chairperson by DPE • Currently advertising for nominees to create a pool of chairpersons • DPE will appoint the Chairpersons to the CCC’s from this pool • DPE accepted continued appointment of Councillor Godfrey Adamwaite and the continued re

  4. Slide 4: New CCC Guidelines, Nov 2016

    New CCC Guidelines, Nov 2016  Committee Membership • Up to 7 community representatives • A Council Representative • Up to 3 company representatives • Change to some procedures e.g. selection and replacement of members; • New members apply to Independent chair who makes recommendation for DPE to dec

  5. Slide 5: New CCC Guidelines, Nov 2016

    New CCC Guidelines, Nov 2016  ACOL Responsible for: • Provide CCC with copies of consent, licenses, Management Plans etc • Results of environmental monitoring • Annual Review Reports • Reports on community concerns or complaints and ACOL’s response • Consult with CCC before lodging any applications

  6. Slide 6: New CCC Guidelines, Nov 2017

    New CCC Guidelines, Nov 2017  Community Members responsible for: • Communicate & disseminate information about ACOL with broader community • If agreed by committee, release statements to Media (only Chairperson can speak publicly on behalf of committee) • Individuals can make comments to the media

  7. Slide 7: Action List – Not updated yet

    Action List – Not updated yet ITEM RESPONSIBILITY PROGRESS UPDATE Tree Screen at New England Hwy requires maintenance PB Nothing to report at this stage Poor housekeeping at two privately tenanted, Ashton owned PB Routine inspections completed in early residences, in Camberwell requires addressing N

  8. Slide 8: Ashton Mine Production CY2017

    Ashton Mine Production CY2017 2017 Budget 2017 Actual ytd ytd ROM (t) 264,303 539,616 Product Coal (t) 104,912 242,575 Total Coal Sales (t) 177,160 239,954 8 24 March 2017 8

  9. Slide 9: Current Mining Area

    Current Mining Area 9 24 March 2017 9

  10. Slide 10: Environment Monitoring Data

    b. Environment Monitoring Data • Meteorological  Rainfall • Air Quality  Depositional Dust Gauges – Total suspended dust  PM10 – Tapered Element Oscillating Microbalance (TEOM) • Surface Water  Glennies Ck, Bowmans Ck and Hunter River • Groundwater  various aquifers • Noise 10 24 March 2017 10

  11. Slide 11: Rainfall

    Rainfall 2016 Total Rainfall: 754mm 11 24 March 2017 11

  12. Slide 12: Air Quality & Noise Monitoring Locations

    Air Quality & Noise Monitoring Locations Proposed new PM10 Monitoring Station, April 17, as required by EPL Note: • Sites 1, 2 & 3 HVAS - TSP decommissioned in Nov 16 in accordance with EPL. 12 24 March 2017 • Site 2 (PM10) TEOM will be removed once monitoring commences at the new site. 12

  13. Slide 13: Depositional Dust

    Depositional Dust On-site Dust Gauges 13 24 March 2017 13

  14. Slide 14: Total Suspended Dust

    Total Suspended Dust Note: Sites 1, 2 & 3 decommissioned in Nov 16 as per EPL 14 24 March 2017 14

  15. Slide 15: Total Suspended Dust

    Total Suspended Dust 15 24 March 2017 15

  16. Slide 16: PM10 Dust – Site 1 (north Camberwell)

    PM10 Dust – Site 1 (north Camberwell) 16 24 March 2017 16

  17. Slide 17: PM10 Dust – Site 2 (south Camberwell)

    PM10 Dust – Site 2 (south Camberwell) 17 24 March 2017 17

  18. Slide 18: PM10 Dust – Site 3 (far east of Camberwell)

    PM10 Dust – Site 3 (far east of Camberwell) 18 24 March 2017 18

  19. Slide 19: PM10 Dust – Site 8 (east of Camberwell)

    PM10 Dust – Site 8 (east of Camberwell) 19 24 March 2017 19

  20. Slide 20: Surface Water Sampling Locations

    Surface Water Sampling Locations 20 24 March 2017 20

  21. Slide 21: Surface Water Quality – pH

    Surface Water Quality – pH 21 24 March 2017 21

  22. Slide 22: Surface Water Quality – EC

    Surface Water Quality – EC 22 24 March 2017 22

  23. Slide 23: Surface Water Quality – pH

    Surface Water Quality – pH 23 24 March 2017 23

  24. Slide 24: Surface Water Quality – EC

    Surface Water Quality – EC 24 24 March 2017 24

  25. Slide 25: Surface Water Quality – pH

    Surface Water Quality – pH 25 24 March 2017 25

  26. Slide 26: Surface Water Quality – EC

    Surface Water Quality – EC 26 24 March 2017 26

  27. Slide 27: Groundwater Sampling Locations

    ACP Groundwater Groundwater Sampling Locations Monitoring Network 27 24 March 2017 27

  28. Slide 28: Groundwater – Standing Depth

    Groundwater – Standing Depth To be updated 28 24 March 2017 28

  29. Slide 29: Groundwater – EC

    Groundwater – EC To be updated 29 24 March 2017 29

  30. Slide 30: Noise Monitoring

    Noise Monitoring Attended noise monitoring is conducted Monthly. There were no exceedances during the reporting period 30 24 March 2017 30

  31. Slide 31: Independent Compliance Audit

    Independent Compliance Audit  Report finalised 19 December 2016  Copy forwarded to Community Consultative Committee members  Audit covered period 10 Oct 2013 – 19 June 2016  Reviewed 47 approvals and associated environmental documents  Identified 27 non‐compliances (16 were administrative) • No

  32. Slide 32: Complaints

    Complaints One Complaint reported to DPE on 28/01/17 at 8:09am regarding ‘operational and mine noise’. • A review of ACOL operations indicated there was minimal site operations occurring at the time. • Investigations indicated ACOL contribution to noise levels at the time were minimal. • Report prov

  33. Slide 33: Environmental Update

    Environmental Update  2016 Annual Review to be submitted by 31st March 2017 • Copy to be provided to CCC members  Review Environmental Management Plans by 30 June 2017 • Within 3 months of Independent Environmental Audit and completion of Annual Review • Copy of updated plans to be made available

  34. Slide 34: New Website

    New Website  New website  Easy to use format  Up‐to‐date environmental monitoring data  Approvals  Management Plans 34 24 March 2017 34

  35. Slide 35: Ashton Coal website screenshot

    Mining - Ashton Coal x (SS [enh w <= X | © wwwashtoncoal.com.au arx|a #4 AshtonCoal ABOUT SUSTAINABILITY PUBLICATIONS -—LICENCES & APPROVALS «CAREERS «CONTACT US $0.36 YAL (aBouT us} { SUSTAINABILITY } WHO WE ARE ENVIRONMENT COMMUNITY + + + (COMPLIANCE } (PEOPLE GETIN TOUCH} LICENCES AND. CAREERS CO

  36. Slide 36: South East Open Cut Project (SEOC)

    f. South East Open Cut Project (SEOC)  Amendment was lodged with DPE as advised last meeting.  Was placed on public exhibition by DPE.  Application made to modify Consent conditions ‐ 28 private submission, 7 group submissions and 5 Agency submissions.  Reply to submissions currently being prepa

  37. Slide 37: Camberwell update

    Camberwell update  Camberwell property • 33 homes tenanted, 1 vacant to be tenanted • 4 homes vacant ‐ care and maintenance 37 24 March 2017 37

  38. Slide 38: Any Questions?

    Any Questions? 38 24 March 2017 38