Victory Nickel Inc

Victory Nickel — Investor Presentation (November 2010)

28 slides from Victory Nickel's investor presentation, November 2010

  1. Slide 1: Victory Nickel Inc. Building Canada's Next Nickel Producer

    Victory Nickel Inc. Building Canada’s Next Nickel Producer November 2010

  2. Slide 2: Disclaimer

    Disclaimer Some of the statements contained in the following material may be "forward-looking statements." All statements, other than statements of historical fact, that address activities, events or developments that Victory Nickel believes, expects or anticipates will or may occur in the future ar

  3. Slide 3: Company Profile: Nickel Projects

    Company Profile Nickel Projects Four Advanced Sulphide Nickel Projects Over 900 million pounds of nickel in Measured and Indicated resources and 250 million pounds of Inferred resources, NI 43-101 compliant 3

  4. Slide 4: Company Profile: Other Assets - Equity Holdings

    Company Profile Other Assets - Equity Holdings ~5% ownership of Wallbridge Mining Company Limited Duluth Metals Limited Miocene Metals Limited Sudbury exploration ~9% ownership of Prophecy Resource Corp. Lynn Lake nickel mine Interests in copper, coal, vanadium, PGMs in Canada and Mongolia Market va

  5. Slide 5: Company Profile: Management and Ownership

    Company Profile Management and Ownership Experienced board and management with expertise in geology, mining, metallurgy, finance and environmental Jilin Jien Nickel Industry Co., Ltd.: 14% Prophecy Resource Corp: 9% Insiders and Nuinsco Resources Limited (TSX:NWI): 18% TSX Symbol Ni Shares Outstandi

  6. Slide 6: Minago Project Overview

    Minago Project Overview 100% owned, royalty-free Large resource Well-located Sulphide nickel: conventional processing Significant exploration Minago Property upside: At depth and in North Limb Open pit and underground mining potential 6

  7. Slide 7: Global Resource & Reserves

    Minago Project Global Resource & Reserves Minago Sulphide Nickel Project (Mirarco) – Total Nickel Resource Estimate (PEA) In-Situ Nickel Classification Tonnes Grade (millions of pounds) At 0.25% Nickel Cut-off Grade (millions) (% Ni) Measured Resource 10.3 0.593 134 Indicated Resource 38.8 0.496 424

  8. Slide 8: Well Located

    Minago Project Well Located Manitoba: mining friendly Adjacent to provincial highway #6 230 Kv powerline adjacent to highway Thompson, Port of Churchill on Hudson’s Bay to the north Rail head located 60Km north giving east-west rail access Several established communities nearby On strike with existi

  9. Slide 9: Exceptional Metallurgy

    Minago Project Exceptional Metallurgy 9

  10. Slide 10: Definitive Feasibility Study Completed

    Minago Project Definitive Feasibility Study Completed DFS results announced Dec. 2009 Initial DFS improvements announced Jun. 2010 Positive drill results announced May-July Additional optimization work continuing Average annual ore production: 3.6 million tonnes Average annual nickel production in c

  11. Slide 11: First DFS Optimization Results

    Minago Project First DFS Optimization Results Minago Sulphide Nickel Project: Economic Summary Comparison Base Case Jun. 21, 20101 Base Case Dec. 14, 20091 ($million except % and years) ($million except % and years) Undiscounted cash flow 1,053.7 917.7 NPV @ 8% 367.1 293.8 NPV @ 6% 487.6 402.6 NPV @

  12. Slide 12: Other Opportunities

    Minago Project Other Opportunities Increase resources and reserves – In pit, at depth and in North Limb 1 year additional mine life theoretically adds ~$83 million to NPV at 8% discount rate Evaluate Outotec’s HydroNic chloride hydrometallurgical process Potential to raise recovery, produce metal on

  13. Slide 13: C1 Cash Cost Comparison

    Minago Project C1 Cash Cost Comparison Source: Brook Hunt – A Wood Mackenzie Company, Victory Nickel DFS 13

  14. Slide 14: Cost Summary

    Minago Project Cost Summary C1 Cash cost per lb nickel, net of credits: US$1.89 ($2.08) Metal by-product credits: US$0.77 ($0.85)/lb nickel Frac sand by-product value: US$3.67 ($4.02)/lb nickel Cash cost per lb nickel before by-product credits: US$6.33 ($6.94) 14

  15. Slide 15: Frac Sand

    Minago Project Frac Sand 11.2 million tonnes marketable frac sand resource in pit footprint Mining occurs over three years; sales over 10 years Selling price per tonne, net of freight = $63.02 Projected annual net revenue = $70 million Processing cost per tonne of frac sand = $6.50 Frac sand by-prod

  16. Slide 16: Environment and Permitting

    Minago Project Environment and Permitting Permitting process well advanced Environment Act Proposal (EAP) submitted to Manitoba Conservation on April 30, 2010 EAP is supported by a comprehensive Environmental Impact Statement (EIS) produced by Victory Nickel and Golder Associates, Roche, URS, Wardro

  17. Slide 17: First Nations Relations

    Minago Project First Nations Relations Ongoing consultation has led to good relations with Aborignal groups Access road (4.3 km) completed March 30, 2010 - construction contract awarded to a First Nations Contractor Access road constructed by three First Nations contractors and one non First Nations

  18. Slide 18: Summary Project Schedule

    Minago Project Summary Project Schedule Activity Start Quarter 2010 2011 2012 2013 2014 Road Construction Q1 EIS Submission Q2 Permitting Q3 Early Works Q4 Q1 Substation Installation Q1 Pit Dewatering Wells Q4 Q1 Dredging Overburden Q2 Mine Development Q1 Q1 Frac Sand Plant Construction and Commissi

  19. Slide 19: Exploration Upside: Nose Deposit

    Minago Project Exploration Upside: Nose Deposit Deepest hole ends in mineralization at 800+m depth Gap in underground resource due only to lack of drill coverage, North Limb but is known to be nickeliferous Upside at depth: Underground Mining Potential Only a small portion of global resource incorpo

  20. Slide 20: Winter Drill Program

    Minago Project Winter Drill Program Convert inferred to indicated within pit shell Obtain mineralized intercepts within “wedges” Extend higher grade mineralization which may raise overall grade Accurate modelling of granites may reduce low grade in pit shell 20

  21. Slide 21: Exploration Upside: North Limb

    Minago Project Exploration Upside: North Limb North Limb >1.5km long, located north of Nose Deposit Mineralization identical to that of Nose Deposit Limited drilling – approx 17 holes only 4 by North Limb Victory Nickel Potential to expand resource Other nickel mineralization occurs ~1km north of No

  22. Slide 22: Exploration Upside: Magnetic Inversion Study

    Minago Project Exploration Upside: Magnetic Inversion Study

  23. Slide 23: Financing Program

    Minago Project Financing Program Off-take Agreements Equity Issues Ni concentrate: $80 million pre- $100 million payment agreements ($80 per Rights offering tonne of contained Ni for five Private placement years Fully-marketed prospectus issue Frac sand: $100 million pre- payment agreements ($20 per

  24. Slide 24: Mel Project Overview

    Mel Project Overview 100% owned subject to Vale Inco 51% back-in (C$6 million) 25 km north of Thompson Near-surface, ramp/pit-accessible resource Direct ship potential Milling agreement at cash cost +5%* Ongoing economic evaluation Metallurgical testing Classification Tonnes Grade In-Situ Nickel (mi

  25. Slide 25: Mel Project: Geology and Claims

    Mel Project Geology and Claims Mel Thompson VALE OIC Leases Key Mel Claims Proterozoic Archean Gneiss 0 2 Mel Deposit km Mel Lease 25

  26. Slide 26: Mel Project: Long Section

    Mel Project Long Section Current long section incorporating 2007 drilling Mineralization comes to bedrock surface beneath overburden Drilling to relatively shallow depth (~250m) Deposit open to depth 26

  27. Slide 27: Lac Rocher Project Overview

    Lac Rocher Project Overview Near-surface deposit with high-grade component and direct-ship potential PEA indicates break-even slightly above C$10 Ni/lb and C$3.84/lb Cu EIS submitted, access road complete On-site upgrading: DMS, optical sorting Critical review of PEA in current price environment Cla

  28. Slide 28: Lac Rocher Project

    Lac Rocher Project Initial discovery of nickel bearing gabbro in outcrop, drill discovery followed in 1998-1999 High-grade nickel mineralization occurs at base of gabbroic intrusion overlain by low grade disseminated mineralization Large volume of untested mafic-ultramafic rock regionally 28