Peloton Minerals Corp. · CSE:PMC

Peloton Minerals — Investor Presentation (June 2026)

34 slides from Peloton Minerals's investor presentation, Jun 17, 2026

  1. Slide 1: District-Scale Lithium & Critical Minerals Exploration in Nevada, USA

    District-Scale Lithium & Critical Minerals Exploration in Nevada, USA North Elko Lithium Project (NELP) June 17, 2026 pelotonminerals.com pelotonminerals.com CSE: PMC OTCQB: PMCCF

  2. Slide 2: Forward-Looking Statement

    Forward-Looking Statement Cautionary Statement on Forward-Looking Information & Statements An additional Cautionary Note to Investors – In the event that we use The following presentation may include certain “forward-looking certain terms in this presentation, such as “resource”, “measured statement

  3. Slide 3: Project Snapshot

    NORTH ELKO LITHIUM PROJECT (NELP), NEVADA, USA Project Snapshot U.S. Critical Minerals Exposure Project Scale & Ownership Multiple strategic minerals confirmed in a single Nevada asset. Metallurgical test work underway on 20 sq. miles (53 sq. km) recovery pathways. Aligned with U.S. supply security

  4. Slide 4: Capitalization and Market Information

    OVERVIEW Capitalization and Market Information Recent Share Price 52 Week Low-High Shares Outstanding Market Capitalization C$0.10 C$0.0650 152 million C$14 million May 27, 2026 C$0.3050 Ownership Management & Management & Close Holders 30% Close Holders 30% Core Shareholders 30% Other Retail 40% +6

  5. Slide 5: North Elko Lithium Project (NELP)

    NEVADA, USA North Elko Lithium Project (NELP) Peloton’s NELP is located adjacent to the Surge Battery Metals v discovery of the highest grade, district scale lithium in claystone resource in North America. NELP Highlights Project Scale & Geology Ownership & Structure District-scale project (20 sq. m

  6. Slide 6: Quality U.S. Projects Key to Closing Supply Gap

    MARKET DYNAMICS AND SUPPLY FORECAST Quality U.S. Projects Key to Closing Supply Gap U.S. Demand Forecast Thacker Pass (Nevada) Rio Tinto bullish on Lithium +400,000 tonnes $3.9 Billion invested $6.7 Billion purchase China controls ~67% LCE in 2030 of global lithium GM and the U.S. DOE have of Arcadi

  7. Slide 7: Rubidium

    OVERVIEW Rubidium US currently obtains 100% of Rubidium needs from China or Russia US & Japan have labeled Rubidium as an “emerging critical metal” 37 Rubidium Rubidium Uses: Rb Market Size: • Advanced Electronics & Communication • The global rubidium market is forecast to reach approximately • Sola

  8. Slide 8: Nevada Lithium Clay Districts Drive U.S. Supply

    U.S. LITHIUM SUPPLY OPPORTUNITY Nevada Lithium Clay Districts Drive U.S. Supply Market Avg M&I OPEX Mine Partners / Company Stage Cap Grade Resources Est. Life Notes GM (US$1B), Mine Under 2,230 US$6,238 85 C$1.97B 44.5 Mt LCE DOE (US$2.6B) Construction ppm Li p/t LCE years Ford (US$700M), Mine Unde

  9. Slide 9: Surge & Peloton Ground Positions

    THE TWO LARGEST POSITIONS IN NORTH EASTERN NEVADA Surge & Peloton Ground Positions Property size: 17 sq. mi (44 sq. km) Property size: 20 sq. mi (53 sq. km) Lithium deposit is in shallow clay Mineralized Clay Bed: underlying bed layers striking toward Peloton with lithium, rubidium, cesium, and othe

  10. Slide 10: Peloton's Systematic Exploration Approach

    COMPLETED MILESTONES & TECHNICAL RESULTS Peloton’s Systematic Exploration Approach Completed Since 2024 Strategic Technical Results Hyperspectral Data reprocessing Surface Analysis Geologic Setting and geologic analysis Hyperspectral data confirms clay-bearing NELP sits within an alkaline paleolake

  11. Slide 11: Hyperspectral UV Data

    LITHIUM BEARING CLAY LAYER Hyperspectral UV Data Hyperspectral UV data across the Peloton property identifies pixels representing outcrops of a near-surface clay layer containing critical lithium-bearing minerals: smectite, hectorite, and illite. This suggests that a clay layer underlies the entire

  12. Slide 12: Soil Geochemistry (Li)

    ELEVATED LITHIUM ANOMALY Soil Geochemistry (Li) Lithium (Li) Soil geochemistry surveys across the Peloton property have identified an elevated lithium anomaly extending over approximately 9.65 sq. miles (25 sq. km), as well as elevated rubidium (next slide). 2026 soil geochemistry survey pending acr

  13. Slide 13: Soil Geochemistry (Rb)

    ELEVATED RUBIDIUM ACROSS SURVEY AREA Soil Geochemistry (Rb) Rubidium (Rb) Elevated Rubidium values up across the entire northern half of the property. 2026 soil geochemistry survey pending across southern claim blocks (staked post-northern survey completion). pelotonminerals.com Peloton Minerals Cor

  14. Slide 14: Two categories of lithium & critical minerals enrichment

    X-RAY DIFFRACTION ANALYSIS Two categories of lithium & critical minerals enrichment* Lithium Bearing Alteration Minerals Primary Lithium Magma Minerals (hectorite, illite, others) (alkaline rhyolites & melts) Highly alkaline (high pH) hot water circulates within the Primary lithium-bearing magma ext

  15. Slide 15: Airborne Magnetics

    NW ORIENTED STRUCTURES IDENTIFIED Airborne Magnetics Airborne magnetic survey data combined with hyperspectral imaging, Surge drill holes, and Peloton drill pads reveals prominent northwest- oriented structures. pelotonminerals.com Peloton Minerals Corporation June 2026 pelotonminerals.com 15

  16. Slide 16: tTEM Was Used Successfully by Surge and LAC to Map Clay Layers

    tTEM GEOPHYSICAL SURVEY tTEM Was Used Successfully by Surge and LAC to Map Clay Layers Buried by Upper Stratigraphy The tTEM unit is towed behind Blue lines represent roads an ATV or truck and reads surveyed using tTEM straight down to a depth of geophysics across a 20 about 300 feet. sq. miles (53

  17. Slide 17: Near-Surface Clay Layer Identified Over 4.4 Miles Strike Length

    tTEM GEOPHYSICAL SURVEY Near-Surface Clay Layer Identified Over 4.4 Miles (7km) Strike Length Through the Heart of the Property Cross Section of the Surveyed Road Location of the Surveyed Road Highlighted in Green pelotonminerals.com Peloton Minerals Corporation June 2026 pelotonminerals.com 17

  18. Slide 18: 2025 Maiden Drill Program Success

    FOUR STRATEGIC, WIDELY SPACED DRILL HOLES ACROSS 50 SQ KM OF MINERALIZED CLAY 2025 Maiden Drill Program Success Scale Confirmation Mineralized clay bed confirmed to 500ft depth across an area 4 miles x 2 miles (7km x 3.5km) Lithium and Rubidium Potential Establishes that NELP is fertile for lithium

  19. Slide 19: Surge Lithium Zone is Oriented NW – SE and Open to the SE

    SURGE DRILLING IS STEPPING TOWARD PELOTON HOLE 3 Surge Lithium Zone is Oriented NW – SE and Open to the SE Surge drilling is stepping toward Peloton Hole 3 • Hole 3 intersected up to 1155 ppm Li on strike from the Surge Li deposit • Hole 3 was stopped at 500 feet, still in clay mineralization peloto

  20. Slide 20: NELP Claim Outline Superimposed on LAC Resource

    NELP CLAIM SIZE VS. THACKER PASS NELP Claim Outline Superimposed on LAC Resource* Peloton's NELP claims cover a significant land position of 20 sq. miles (53 sq. km), providing substantial exploration upside. Thacker Pass (LAC) is shown for scale reference as North America's largest known lithium de

  21. Slide 21: Corporate Inquiries

    Corporate Inquiries Edward (Ted) Ellwood Bayline Capital Partners Auditor: President & CEO Aaron Unger RSM, Chartered Accountants T: (416) 480-0160 T: 519-697-2313 Partner Tedellwood@gmail.com T: 416-818-0050 aunger@baylinecapitalpartners.com Investment Banker / Advisors: Legal: Paul Teodorovici IBK

  22. Slide 22: Appendix

    Appendix Detailed Technical Information available at www.pelotonminerals.com

  23. Slide 23: Board of Directors and Management

    EXPERIENCED TEAM Board of Directors and Management John F. O’Donnell Chairman of the Board LLB, BA (Economics) Edward (Ted) L. Ellwood President & CEO, Director MBA 200 years of combined experience Eric Plexman CFO & Corporate Secretary, Director playing respective roles in resource exploration, dis

  24. Slide 24: Drilling November – December 2025

    DRILLING NOVEMBER – DECEMBER 2025 pelotonminerals.com Peloton Minerals Corporation June 2026 pelotonminerals.com 24

  25. Slide 25: Drilling November – December 2025

    DRILLING NOVEMBER – DECEMBER 2025 pelotonminerals.com Peloton Minerals Corporation June 2026 pelotonminerals.com 25

  26. Slide 26: NELP Basin Magnetics Shows NW Trends With Surge Drilling

    NELP Basin Magnetics Shows NW Trends With Surge Drilling And Peloton Hole 3 – 1150 ppm Li Also on a NW Trend pelotonminerals.com Peloton Minerals Corporation June 2026 pelotonminerals.com 26

  27. Slide 27: Geologic Mapping Shows Prospective Area Bounded by Slip Faults

    GEOLOGIC MAPPING Geologic Mapping Shows* Prospective Area Bounded by Slip Faults on the East and West * Compilation: ▪ Elko County Digital Geology Map ▪ Nevada Bureau of Mines and Geology ▪ Peloton Geologic Mapping pelotonminerals.com Peloton Minerals Corporation June 2026 pelotonminerals.com 27

  28. Slide 28: The Yellowstone Hotspot and Regional Geology

    REGIONAL GEOLOGY The Yellowstone Hotspot is believed to be responsible for volcanic activity in Northern Nevada (16– Yellowstone Today 12.5 million years ago), resulting in calderas, grabens, and lithium clay deposition. 16-12.5 Million Years Ago pelotonminerals.com Peloton Minerals Corporation June

  29. Slide 29: 16 Holes to Achieve Maiden Resource, 37 Holes to Date

    SURGE DRILL HOLE LOCATIONS The Yellowstone 16 Holes to Achieve Maiden Resource Hotspot is believed to be responsible for 37 Holes vto Date volcanic activity in Northern Nevada (16– 11.24 MT LCE12.5 millionat Inferred years 3,010ago), Li resulting in calderas, grabens, and lithium Discovery costs cla

  30. Slide 30: NNLP Lithium Project PEA Overview

    NNLP Lithium Project PEA Overview Surge’s NNLP Lithium Project Inferred Resource After Tax NPV (8% Discount) PEA Highlights* June 2025 ($ US Dollars) 11.24 Mt LCE $9.214 B Mining & Process at 3,010 ppm Li After Tax IRR — 22.8% Mine Life 42 years Mining & Process Open Pit, Acid Leach Average Annual P

  31. Slide 31: Thacker Pass Overview

    Thacker Pass Overview Thacker Pass Updated Feasibility Highlights* Proven Measured & After Tax NPV (8% Discount) & Probable Indicated December 2024 ($ US Dollars) 14.5 Mt LCE 44.3 Mt LCE $5.9 B at 2,230 ppm Li at 2,540 ppm Li Mining & Process After Tax IRR — 19.6% Mine Life 85 years Mining & Process

  32. Slide 32: Thacker Pass Process Flow Chart

    Thacker Pass Process Flow Chart Source: LithiumAmericas Corporate Presentation 2023 pelotonminerals.com Peloton Minerals Corporation June 2026 pelotonminerals.com 32

  33. Slide 33: Life cycle of a Junior Explorer

    THE LASSONDE CURVE Life cycle of a Junior Explorer Source: Brent Cook / Kitco pelotonminerals.com Peloton Minerals Corporation June 2026 pelotonminerals.com 33

  34. Slide 34: For more information, visit pelotonminerals.com

    For more information, visit pelotonminerals.com CSE: PMC OTCQB: PMCCF Email: Registered Head Office pelotonminerals45@gmail.com 380 Wellington Street Tower B, 6th Floor Tel: (519) 964-2836 London, Ontario Fax: (519) 964-2701 N6A 5B5

Peloton Minerals — Investor Presentation (June 2026) on 6ix