  1. Slide 1: A Leading Renewable Power Producer: The Path to 1,000 MW

    A LEADING RENEWABLE POWER PRODUCER THE PATH TO 1,000 MW TSX : AXY 1 MAR 2012 COMPANY PRESENTATION

  2. Slide 2: Forward-Looking Information

    Forward-Looking Information This Presentation contains certain “forward-looking information” within the meaning of Canadian securities laws, which may include, but is not limited to, statements with respect to future events or future performance, management’s expectations regarding Alterra’s product

  3. Slide 3: Alterra Power – Strategy and Assets

    Alterra Power – Strategy and Assets Clean energy: permanent, stable cash flow with zero fuel cost/exposure  Core infrastructure business – once built, permanent value Our mission: to be a leading global renewable energy company Our assets today: Geothermal Hydro Wind 570 MW of clean power operated

  4. Slide 4: Recent Growth and Performance

    Recent Growth and Performance Alterra’s recent growth.. Last Quarter’s Performance: (net interest) (net interest) CAPACITY (end of year) PRODUCTION 350 1,800  $36.1 million Revenue 300 1,600 250 1,400 1,200  $20.5 million EBITDA 200 GWh MW 1,000 150 800 600  441 GWh electricity 100 50 400 produce

  5. Slide 5: Balanced Portfolio - Global Exploration and Operations

    Balanced Portfolio - Global Exploration and Operations ICELAND:  2 geothermal power plants with 175 MW capacity (67% Alterra)  Additional 130 MW of defined expansion plans  80 MW of expansions underway WESTERN CANADA:  Toba-Montrose hydro plants with 235 MW capacity (40% Alterra)  Dokie wind fa

  6. Slide 6: Assets and Pipeline

    Assets and Pipeline Capacity Project Gross AXY Share Technology Operating (2011) Soda Lake 16 MW 16 MW Geothermal Svartsengi 75 MW 50 MW Geothermal Reykjanes 1 & 2 100 MW 67 MW Geothermal East Toba & 235 MW 94 MW Hydro Montrose Dokie 1 144 MW 73 MW Wind Total Capacity 570 MW 300 MW Annual Net Genera

  7. Slide 7: BC Opportunity

    BC Opportunity British Columbia’s demand for power is expected to grow significantly in the next 3-5 years • LNG plants in Kitimat • Mining growth • General population growth Clean renewable power sourced from IPPs is expected to be a critical source of new supply Dokie 1 ` Alterra is uniquely posit

  8. Slide 8: Outstanding Developer Track Record

    Outstanding Developer Track Record Successful developer track record across renewable technologies  Proven ability to develop and deliver large new assets at greenfield locations  Development teams from all these projects remain substantially intact Recent project successes Wind Dokie 144 MW 2011

  9. Slide 9: Leading Growth Profile

    Leading Growth Profile Alterra has one of Canada’s largest clean energy development pipelines 900 5,000 800 4,500 700 4,000 153 3,500 600 156 3,000 Net MW 500 GWh 153 2,500 400 153 2,000 300 73 156 73 73 1,500 94 94 460 200 94 94 94 1,000 100 191 212 147 167 187 500 133 0 0 2010 2011 2012 2013 2014

  10. Slide 10: Analyst Coverage and Capital Structure

    Analyst Coverage and Capital Structure C APITAL S TRUCTURE : PRO- FORMA NET INTEREST MARKET CAPITALIZATION (29 FEB 2012) C$ 293 MM CASH (30 SEP 2011) US$ 41 MM TOTAL ASSETS (30 SEP 2011) US$ 907 MM LONG TERM DEBT (30 SEP 2011) US$ 513 MM FIRM CONTACT EMAIL Canaccord Genuity Jared Alexander jalexande

  11. Slide 11: Recent news

    Recent news Succession of positive events:  Strong 1Q 2012 (Jul-Sep) results  Toba Montrose and Dokie final completions  Dokie term conversion  Permit for Reykjanes expansion  Icelandic Pension Fund sale and option exercise  New resource concessions in promising new markets – Italy and Peru 

  12. Slide 12: Looking ahead

    Looking ahead Looking ahead to 2012:  Prepare near-term projects for construction: Dokie 2: installation of new meteorology towers Upper Toba: design optimization Reykjanes: refresh capital / financing plans  Prepare for next-phase drilling with partner at Chile  Continue long-term project develo

  13. Slide 13: Value Proposition Summary / Next Milestones

    Value Proposition Summary / Next Milestones VALUE PROPOSITION Core Producing Assets - long term, stable cash flow Diversified Assets - by geography & generation type Larger Size - better liquidity, lower cost of capital Outstanding Project Pipeline - geothermal, hydro, wind assets could triple outpu

  14. Slide 14: Appendices

    APPENDICES TSX : AXY 14MAR 2012 www.alterrapower.ca

  15. Slide 15: Senior Management

    Senior Management Outstanding development, financial and operations expertise Ross Beaty: Executive Chairman Geologist and resource company entrepreneur with 40 years experience in the international minerals industry. In early 2008, Mr. Beaty founded Magma Energy Corp to focus on international geoth

  16. Slide 16: Board of Directors

    Board of Directors Ross Beaty  Mr. Beaty is a geologist and resource company entrepreneur with more than 40 years of experience in the international minerals industry, Founder and chair of Magma Energy Corp and Pan American Silver (TSX: PAA, NASDAQ: PAAS) and Executive Chairman several other resour

  17. Slide 17: Overview - Toba Montrose in B.C.

    Overview - Toba Montrose in B.C. Alterra owns a 40% economic interest in two recently completed run of river hydroelectric generation facilities in southwestern British Columbia Facilities  East Toba River and Montrose Creek Capacity &  236 MW generating 727 GWh / year Production  60% - GE EFS Ow

  18. Slide 18: Overview - Dokie Wind in B.C.

    Overview - Dokie Wind in B.C. Alterra owns a 51% economic interest in the recently completed Dokie Wind Farm, located in northern British Columbia Facilities  Dokie Wind Farm Capacity &  144 MW generating 330 GWh annually Production  51% - Alterra Ownership  49% - GE EFS Start of Operation  Mar

  19. Slide 19: Overview - Svartsengi and Reykjanes in Iceland

    Overview - Svartsengi and Reykjanes in Iceland Alterra’s 67% - owned subsidiary HS Orka owns two geothermal power plants in southwestern Iceland Facilities  Svartsengi and Reykjanes Capacity &  175 MW generating 1,315 GWh /year Production  Thermal (hot water) production 150 MW th  67% - Alterra

  20. Slide 20: Overview - Soda Lake in Nevada

    Overview - Soda Lake in Nevada Alterra owns a 23 MW geothermal power plant near Fallon in northern Nevada Facilities  Soda Lake 1 and Soda Lake 2 Capacity &  23 MW, currently operating at 16 MW gross and generating Production 84 GWh /year Ownership  100% - Alterra Start of Operation  1987 & 1991

  21. Slide 21: Overview - ABW Solar in Ontario

    Overview - ABW Solar in Ontario Alterra has an option to acquire a 10% interest in a portfolio of solar facilities from First Solar, to be built in southern Ontario Facility  3 solar facilities in southwestern Ontario  Amherstburg – 10 MW Capacity  Belmont – 20 MW  Walpole – 20 MW Proposed  90%

  22. Slide 22: Overview - Upper Toba Expansion Project in B.C.

    Overview - Upper Toba Expansion Project in B.C. A power purchase agreement and permitting are in place for additional run of river hydro plants near the Toba Montrose facilities in southwestern B.C.  Jimmie Creek and Upper Toba River Locations  In the close vicinity to existing Toba Montrose facil

  23. Slide 23: Overview - Reykjanes 3 & 4 Expansion Project in Iceland

    Overview - Reykjanes 3 & 4 Expansion Project in Iceland The Reykjanes geothermal power plant in southwestern Iceland has substantial existing well capacity and is permitted for an expansion of production Location  Existing Reykjanes facility and steam field Capacity &  80 MW generating 687 GWh ann

  24. Slide 24: Overview - Dokie 2 Expansion Project in B.C.

    Overview - Dokie 2 Expansion Project in B.C. The Dokie Wind Farm in northern B.C. is permitted for a 156 MW expansion Location  Undeveloped ridgelines within Dokie Wind Farm area Capacity &  156 MW generating 357 GWh annually Production  51% - Alterra Ownership  49% - GE EFS Permitting  Existin

  25. Slide 25: Overview - Mariposa Development Project in Chile

    Overview - Mariposa Development Project in Chile The Mariposa geothermal field in Chile has an inferred-level capacity of 320 MW  In the Andes Mountains in south-central Chile, approximately Location 300 km south of Santiago  320 MW inferred resource with promising characteristics Capacity & Produ

  26. Slide 26: www.alterrapower.ca

    TSX : AXY 26MAR 2012 www.alterrapower.ca