Atlatsa Resources — FY2013 Earnings Presentation
17 slides from Atlatsa Resources's earnings presentation, March 2014
Slide 1: Annual Results 2013
ANNUAL RESULTS 2013 31 MARCH 2013
Slide 2: Cautionary and forward-looking information
Cautionary and forward-looking information This presentation contains “forward-looking statements” that were based on Atlatsa’s expectations, estimates and projections as of the dates as of which those statements were made, including statements relating to the Restructure Plan and anticipated financ
Slide 3: 2013 highlights
2013 highlights Operational highlights Financial highlights Safety statistics (LTIFR) improved by 55% y-o-y Restructure plan completed – significant improvement in financial results arising from restructure plan PGM ounces produced increased by 66% y-o-y Mineral assets sold for a profit of $171 mill
Slide 4: Safety
Safety • LTIFR improved by 55% y-o-y to 0.42 (per 200,000 hours) • Three fatalities in Q3 2013 • Major safety improvement focus areas: • behavioural-based training LTIFR 1.20 • strict adherence to safety standards Frequency Rate (per 200,000 hrs) and protocols 1.00 • improved communication 0.80 0.60
Slide 5: Operational performance
Development Operational performance 30,000 25,000 20,000 Metres 15,000 10,000 5,000 0 2009 2010 2011 2012 2013 % Operating results 2013 2012* Re-development Re-dev Total development Total Development change Tonnes milled 1,525,945 863,675 76.7 4E oz produced 180,000 4.50 160,000 4.00 Recovered grade
Slide 6: Financial summary
Financial summary Cash generated /(utilised) by operations % 10 Expressed in $ (000) FY2013 FY2012* change 0 Revenue 195,621 117,557 66 2011 2012 2013 Cash operating costs 194,042 158,388 23 -10 $ (millions) Cash operating profit / (loss) ** 1,580 (40,831) 104 -20 EBITDA 199,570 35,545 461 -30 Profi
Slide 7: Restructure plan completed
Restructure plan completed • Mineral assets sold - $171 million profit Atlatsa Holdings (BEE) Public • Consolidated debt reduced by 75% from 62% 15.5% $587 million to $150 million 22.5% Atlatsa Resources Anglo Platinum • Cost of debt reduced from 12.7% to 4.4%* Debt $150m 100% 51% 49% • ATL Holdings
Slide 8: The way forward…
The way forward… Comparative Mineral Resources • 154Moz Resource base and Reserve 200 • Only significant Merensky producer on Eastern Limb 180 160 Grade Pt Pd 140 g/t % % 120 Merensky 4.64 61 29 100 UG2 6.20 42 48 80 60 • Grade and Pt content advantage on Eastern Limb 40 20 • Shallow depth - 72 Moz
Slide 9: Strategic mine plan
Strategic mine plan 3,500,000 Production profile 450,000 400,000 3,000,000 350,000 2014 – 2023 2,500,000 300,000 Tons milled • Current mill capacity 1.92 Mtpa 2,000,000 250,000 • old high cost Merensky shafts – 2 year phase out 1,500,000 200,000 150,000 • new Merensky and UG2 shaft complexes ramp up
Slide 10: Changing the cost and cash flow profile…
Changing the cost and cash flow profile… Unit cost profile Free cash flow profile 14,000 4,000.0 12,000 3,500.0 3,000.0 10,000 ZAR/PGM (4E) oz 2,500.0 ZAR (millions) 8,000 2,000.0 6,000 1,500.0 4,000 1,000.0 2,000 500.0 - - 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2
Slide 11: Key improvement initiatives
Key improvement initiatives • Efficiency improvements Trade off • focus on pot hole management • increase available face length for mining crews • improved incentive schemes • move from electric and pneumatic Mechanised Conventional drilling to hydropower drilling system development and development
Slide 12: Opportunities
Opportunities • Northern Limb (Platreef) exploration opportunities: • 37,000 hectares and 4 exploration blocks, one of the largest mineral rights owners • Kwanda North (JV Anglo American Platinum) • Kwanda South (JV Anglo American Platinum) • Central Block (100% Atlatsa) • Rietfontein (JV Ivanplats)
Slide 13: Investing in the Bokoni community
Investing in the Bokoni community • Improved direct communication with employees • Increased community involvement: • SMME development • CSR projects • Employee wellness programme Gamathabatha bakery Monametse Village housing project Mokgotho Creche construction project 12 Annual Results 2103 | 31 M
Slide 14: Why Atlatsa: becoming a mid-tier producer
Why Atlatsa: becoming a mid-tier producer • Large, high-quality orebody with Merensky focus • Building through a challenging macro-environment • Production growth over next 5 years • Comparatively low capital requirement to fund growth • Cost containment and efficiency improvement focus • Strong man
Slide 15: Appendix: Resource table
Appendix: Resource table 14 Annual Results 2103 | 31 March 2014
Slide 16: Bokoni Platinum Mines reserves
Bokoni Platinum Mines Total Attributable to Atlatsa Grade Containing Attributable Grade Reef type Mt 4E g/t 4E Moz % Mt 4E g/t Proved MR 31.5 4.12 4.2 51% 16.1 4.12 Notes: Probable MR 0.5 3.59 0.1 51% 0.2 3.59 (1) The QP responsible for the compilation of the mineral reserves is B. Reddy, B.Sc. Pri
Slide 17: Q&A
Atliatsa RESOURCES CORPORATION (WA meme tens 2270 ae Q&A www.atlatsaresources.co.za