Slide 1: Euroz Hartleys Gold Developers Day Presentation
For personal use only EUROZ HARTLEYS GOLD DEVELOPERS DAY PRESENTATION Stand-alone gold development opportunity with significant growth potential at 100% owned Minyari Dome and commanding Paterson Province gold-copper exploration portfolio March 2023 | ASX : AZY
Slide 2: Disclaimer
DISCLAIMER For personal use only Refer to Antipa Minerals ASX release 31 August 2022, for full Minyari Dome Project Scoping Study details. Antipa Minerals confirms that it is not aware of any new information or data that materially affects the information included in that release. All material assum
Slide 3: The Antipa Minerals Portfolio
THE ANTIPA MINERALS PORTFOLIO Advancement of our flagship Minyari Dome Project For personal use only 2.6 ATTRIBUTABLE MINERAL Moz GOLD ONLY SCOPING STUDY CONFIRMS STAND-ALONE PROJECT POTENTIAL Minyari Dome B RESOURCE A 100% Antipa 5,100km 2 COMPLEMENTARY MAJOR D OF HIGHLY PROSPECTIVE GROWTH PROJECTS
Slide 4: Corporate Snapshot
CORPORATE SNAPSHOT High quality register, strong strategic cornerstone investment For personal use only CAPITAL STRUCTURE | ASX : AZY SHARE REGISTER4 Share price1 A$ 0.018 9.9% Shares on issue1 3,593.0 M 4.1% 3.6% Market capitalisation1 A$ 64.7 M 9.6% Cash2 A$ 8.9 M 72.8% Debt Nil EV A$ 55.8 M Newcr
Slide 5: Board and Management
BOARD AND MANAGEMENT Proven value creators For personal use only Stephen Power Roger Mason Mark Rodda Peter Buck Gary Johnson Luke Watson Non-executive Chairman Managing Director Executive Director – Non-Executive Director Non-Executive Director CFO and Company Commercial and Legal Secretary Corpo
Slide 6: Minyari Dome
MINYARI DOME A PROJECT For personal use only 100% ANTIPA Scoping Study confirms sizeable Technically and commercially robust Stand-alone gold mining and processing operation stand-alone project potential with clear and substantial upside Strategically significant location 35km from the Telfer mi
Slide 7: Scoping Study Highlights
SCOPING STUDY HIGHLIGHTS Stand-alone gold mining and processing facility at Minyari Dome For personal use only MINE SCHEDULE MINING PHYSICALS STANDARD CIL PLANT 21.4 Mt at 1.6 g/t gold 3 Mtpa throughput 90% gold recovery Initial open pit and underground mine For 7+ years initial processing life Simp
Slide 8: Potential Upside Drivers
POTENTIAL UPSIDE DRIVERS Three key project value levers For personal use only 1 2 3 Cu Co MINERAL MINE ADDITIONAL RESOURCE SCHEDULING PROJECT EXPANSION REVISION OPTIMISATION Maiden resource Future exploration success to Potential copper and cobalt opportunities and exciting optimise processing by-pr
Slide 9: Aggressive Growth Drilling
AGGRESSIVE GROWTH DRILLING Significantly expanded CY2023 exploration programme For personal use only Potential to materially change the scope of the Minyari Dome development koz Expanded programme to consist of up to 12,000m total drilling including: 6,000m of reverse circulation 5,000 of ai
Slide 10: Aggressive Growth Drilling: Maiden Mineral Resource Opportunities
AGGRESSIVE GROWTH DRILLING Maiden Mineral Resource opportunities Minyari Down Plunge Fault Offset Target For personal use only Minyari mineralisation open down plunge interpreted fault offset to shallower depth untested +500m long target with co-incident IP chargeability anomaly koz Minyari Nort
Slide 11: Aggressive Growth Drilling: Maiden Mineral Resource Opportunities
AGGRESSIVE GROWTH DRILLING Maiden Mineral Resource opportunities For personal use only GEO-01 to Minyari North long section showing gold intercepts and plunging gold-copper mineralisation zones, the Minyari Fault and priority targets including the fault offset Minyari plunge target Thick Minyari
Slide 12: Tetris and Pacman Greenfield Opportunities
AGGRESSIVE GROWTH DRILLING Tetris and Pacman greenfield opportunities For personal use only Large scale combined ground area 733km2 Cover 350 to 450m Tetris is a Havieron doppelgänger: Similar scale coincident magnetic-gravity high target Pacman gravity ± partially co-incident magnetic hig
Slide 13: Development Timeline
DEVELOPMENT TIMELINE Prioritising the advancement of our flagship Minyari Dome Project For personal use only CY2022 CY2023 MINYARI Q3 Q4 Q1 Q2 Q3 Q4 DOME Scoping Study ADVANCEMENT New target finalisation FOCUS 2022 Exploration Programme: Phases 1 & 2 2023 Exploration Programme MINERAL Targeted updat
Slide 14: Emerging Significant Gold & Copper Business
EMERGING SIGNIFICANT GOLD & COPPER BUSINESS For personal use only OUTSTANDING Paterson region has been historically underexplored Prospective frontier for the discovery of multi-cycle, tier-one gold-copper LOCATION deposits PROXIMAL TO THE TELFER MINE AND HAVIERON AND In the last 7 years >18Mo
Slide 15: Contact
CONTACT Managing Director For personal use only Mr Roger Mason E: roger.mason@antipaminerals.com.au Executive Director Mr Mark Rodda E: mark.rodda@antipaminerals.com.au Media Relations Mr Michael Vaughan Fivemark Partners E: michael.vaughan@fivemark.com.au T : +61 422 602 720 Corporate Office Level
Slide 16: Appendix
For personal use only APPENDIX Scoping Study, Mineral Resource detail and other additional information INVESTOR PRESENTATION | 16
Slide 17: Scoping Study Highlights: Detailed Study Outcomes
SCOPING STUDY HIGHLIGHTS Detailed study outcomes For personal use only KEY MINYARI DOME PARAMETERS (± 35%) Ore tonnage Mt 21.4 Grade gold g/t 1.6 Contained ounces gold koz 1,090 Plant throughput Mtpa 3.0 Processing life (excluding pre-production) Years 7+ Strip ratio open pit waste:ore 5:1 LOM1 Gold
Slide 18: Production Projection
PRODUCTION PROJECTION Scoping Study at throughput rate 3 Mtpa ore For personal use only Minyari Dome Project Scoping Study potential gold and silver recovered output schedule koz AVERAGE 168 koz pa 250 GOLD Peak production Overthefirstfiveyearsofmining 205 koz of gold in 200 Year 3 AVERAGE 44 koz pa
Slide 19: Project NPV Sensitivity Analysis
PROJECT NPV SENSITIVITY ANALYSIS Scoping Study tremendous upside to bull market gold pricing For personal use only IRR NPV7% 34% A$392M (pre-tax) (pre-tax) OPEX ± 10% 213 557 UNLEVERED PAYBACK 2.5 Gold price ± 10% 228 557 years (pre-tax) Recovery ± 2% (Abs) 356 429 NET CASH FLOW Discount rate ± 15%
Slide 20: Mining Methods
MINING METHODS Scoping Study contractor mining at three open pits and Minyari deposit underground For personal use only Minyari deposit accounts for 96% of total gold mining Minyari Dome Project conceptual configuration production Standard truck and shovel mining at three open pits Underground
Slide 21: Further Potential Upside: Mineral Resource Extension Opportunities
FURTHER POTENTIAL UPSIDE Mineral Resource Extension Opportunities For personal use only Minyari Down Plunge koz Mineralisation down plunge – Interpreted fault offset to shallower depth untested Minyari Keel Zone Minyari fold nose region - Only partially tested along a significant plunge extent
Slide 22: Further Potential Upside: Additional Project Optimisation
FURTHER POTENTIAL UPSIDE Additional Project Optimisation For personal use only POTENTIAL TO UNDERTAKE MORE Cu Co DETAILED EVALUATION OF POLYMETALLIC DEVELOPMENT OPPORTUNITIES PRE-FEASIBILITY STUDY METALLURGICAL TEST-WORK Minyari Dome May 2022 Mineral Resource Estimate also contains OBJECTIVE TO IM
Slide 23: Mining Schedule
MINING SCHEDULE Scoping Study ore tonnage by Mineral Resource category and mining source For personal use only 21.4 Mt of open pit and underground ore Minyari Dome Project Mined Ore Projection by mining method (kt) Average LOM grade of 1.6 g/t for 1.1 Moz gold 8,000 6,000 13.5 Mt ore from open
Slide 24: Process Flowsheet and Production Rate
PROCESS FLOWSHEET AND PRODUCTION RATE Scoping Study 3 Mtpa Carbon-In-Leach facility currently considered optimal For personal use only Gravity and Carbon-In-Leach facility (CIL) for a gold-silver Block flow diagram of CIL flowsheet case producing doré gold Processing facility was evaluated at th
Slide 25: Capital Cost Estimate Summary
CAPITAL COST ESTIMATE SUMMARY Scoping Study upfront capital requirement of A$275M For personal use only CAPITAL COST ESTIMATE (A$M ± 35%) MAXIMISES Processing Plant (3 Mtpa CIL) 77.1 GOLD OUNCES Contingency 7.7 duringthefirstfouryearsof production Infrastructure - Process 33.0 EPCM 13.5 PREFERENTIAL
Slide 26: Operating Cost Estimate Summary
OPERATING COST ESTIMATE SUMMARY Scoping Study contractor mining at 3 Mtpa throughput For personal use only Operating costs estimated for mining, processing OPERATING COST ESTIMATE (A$/T ORE ± 35%) and administration Mining – open pit (13.5 Mt of ore) 25.3 Consultants Snowden Optiro independently
Slide 27: Complementary Major Growth Projects
For personal use only COMPLEMENTARY MAJOR GROWTH PROJECTS B CITADEL JV (32%1 Antipa and 68%1 Rio Tinto) C WILKI FARM-IN (100% Antipa - Newcrest Mining Ltd farming in) D PATERSON FARM-IN (100% Antipa - IGO Ltd farming in) 1. Antipa elected to utilise the dilute-down provisions in the Citadel JV agree
Slide 28: JV and Farm-In Project Summary
JV AND FARM-IN PROJECT SUMMARY Citadel Joint Venture – Antipa 32% 1 : Rio Tinto 68% 1 (Rio earnt 65% by sole funding A$25M) ~1,200km2 Citadel JV Project just 4km from Rio Tinto’s Winu copper-gold-silver development project For personal use only Existing Mineral Resource 2.4Moz gold at 0.72 g/t,
Slide 29: Citadel JV Project (32%)
B CITADEL JV PROJECT (32%1) Significant gold-copper-silver resource For personal use only STRATEGIC 1,200km2 JOINT VENTURE OF PROJECT AREA WITH RIO 8,500M DRILL PROGRAMME TINTO2 FOR 20221 B 108 MT MINERAL RESOURCE WITHIN 45 OF km Au 2.4 Moz (800 koz attrib.) at 0.72 g/t Cu 162 kt (52.8 kt attrib.) a
Slide 30: Wilki Farm-In Project
C WILKI FARM-IN PROJECT A compelling greenfield opportunity For personal use only LARGE ATTRACTIVE FARM-IN AGREEMENT WITH A$60M 1,470km 2 NEWCREST SPEND FOR 75% JV LAND MINING1 INTEREST HOLDING C +A$6M WITHIN SPENT BY NEWCREST TO 3 km DATE OF THE 2.4 MT MINERAL RESOURCE TELFER GOLD-COPPER- SILVER MI
Slide 31: Paterson Farm-In Project
D PATERSON FARM-IN PROJECT Compelling new targets, massive potential For personal use only LARGE ATTRACTIVE FARM-IN AGREEMENT WITH A$30M 1,550km IGO 2 1 SPEND FOR 70% JV INTEREST LAND HOLDING ANTIPA FREE CARRIED TO COMPLETION OF FEASABILITY STUDY WITHIN +A$4M 22 km SPENT BY IGO TO DATE OF THE GOLD-C
Slide 32: Shallow Depth of Younger Cover
SHALLOW DEPTH OF YOUNGER COVER FIRST MOVER EXPLORATION AND DEVELOPMENT ADVANTAGE For personal use only ~50% OF ANTIPA TENEMENTS ARE UNDER LESS THAN 20 metres OF COVER ~80% OF ANTIPA TENEMENTS ARE UNDER LESS THAN 80 metres OF COVER INVESTOR PRESENTATION | 32
Slide 33: Citadel JV Project: Geology and Scale
CITADEL JV PROJECT (32%1 ANTIPA) Geology and scale suggests substantial growth and development potential For personal use only Calibre deposit (shown right) Inferred Mineral Resource 92Mt at 0.72 g/t gold, 0.11% copper and 0.46 g/t silver for 2.1Moz gold, 104kt copper and 1.3Moz silver 1.7km lon
Slide 34: Havieron Gold-Copper Deposit
HAVIERON GOLD - COPPER DEPOSIT Mineral Resource 5.5 Moz of Gold and 222,000 tonnes of Copper2 For personal use only 1. The Havieron deposit is the subject of a joint venture agreement between Greatland Gold Plc and Newcrest Mining Ltd. Newcrest holds a 70% interest in Havieron earnt via total expend
Slide 35: Telfer Gold-Copper-Silver Operation
TELFER GOLD – COPPER - SILVER OPERATION Newcrest Mining Ltd’s (NCM) INDICATIVE BASE CASE GOLD PRODUCTION PROFILE For personal use only group production profile - Focus just on the orange area (i.e. Telfer+Havieron)1 Note NCM’s diminishing production from the Telfer hub (35km from Minyari) from F
Slide 36: Mineral Resource: Minyari Dome
MINERAL RESOURCE Minyari Dome For personal use only Minyari Dome Project (100%)1 Deposit Au cut-off Category Tonnes (Mt) Au grade (g/t) Cu grade (%) Ag grade (g/t) Co (%) Au (oz) Cu (t) Ag (oz) Co (t) Minyari 0.5 Au Indicated 15.00 1.17 0.19 0.54 0.04 567,000 27,800 259,600 5,930 Minyari 0.5 Au Infe
Slide 37: Mineral Resource: Advanced Exploration Optionality
MINERAL RESOURCE Advanced exploration optionality Citadel Project (Antipa 32%1 and Rio Tinto 68%1 JV) For personal use only Deposit Au cut-off Category Tonnes (Mt) Au equiv. (g/t) Au grade (g/t) Cu grade (%) Ag grade (g/t) Au equiv. (Moz) Au (Moz) Cu (t) Ag (Moz) Calibre 0.5 Au Inferred 92 0.92 0.72