BPZ Resources — Debt Investor Presentation (September 2013)
24 slides from BPZ Resources's debt investor presentation, Sep 19, 2013

Slide 1: BPZ Energy

Slide 2: Forward Looking Statements
Forward Looking Statements ‘This Presentation contains forward lnalng statements within the meaning ofthe Private Sacurties Ligation Reform Ac af 1995,Secian.27A of the Secures Act of 1933 and Section 21E athe Securities Exchange Aa of 1834. These forward laakingstatements are based an aur current e

Slide 3: Convertible Notes Offering Terms
ISSUER RANK / SECURITY OFFERING TYPE EXPECTED PRICING MATURITY AMOUNT DENOMINATIONS ISSUE PRICE COUPON ‘CONVERSION PREMIUM. CONVERSION SETTLEMENT HARD CALL DIVIDEND PROTECTION ‘TAKEOVER PROTECTION INVESTOR PUT USE OF PROCEEDS UNDERWRITER vvvVVvVVYVYVYVYVYVYVYVY VY PZ Resources, Inc. Senior Unsecured

Slide 4: Leadership Team has Better Positioned Company to Grow
Xe 7 Leadership Team has Better Positioned Company to Grow i Four Blocks in Northwest Peru and one in Southwest Ecuador Enhanced Operational, Technical, and Financial Resources P|) F a ae Albacora Field |i Block Z-1 Partnership with Pacific ? ine Rubiales to Facilitate Development gle Net 2Q13 Produ

Slide 5: Explore, develop and produce oil & gas in Peru and the Americas
Explore, develop and produce oil & gas in Peru and the Americas We aim to: ™ deliver profitable growth. ™ become a preferred partner of government and industry. ™ honor our commitments to safety, ethics, the environment and the communities in which we operate. attract and retain top talent by valuin

Slide 6: To Grow Production, Reserves and Cash Flow in Peru
To Grow Production, Reserves and Cash Flow in Peru Completed Block Z-1 JV Transaction Completed Block Z-1 3D Seismic Survey Completed Corvina CX-15 Buoyant Tower Repaid $75M Loan Refinanced $40M Loan Secured by Equipment OIL & GAS ACTIONS Corvina Drilling Underway Preparing to Drill at Albacora Comp

Slide 7: Drilling Underway at CX-15 Platform

Slide 8: Top of Zorritos Formation Unconformity
Ic J a Top of Zorritos Formation Unconformity

Slide 9: New Albacora Data
New Albacora Data 7 PZ Energy Preliminary New 3D Seismic Interpretation explains dry hole at 17D caus

Slide 10: Block Z-1 Exploration Strategy
Block Z-1 Explora Strategy ‘TESTED OIL PROSPECT HB cre nM PROSPECT @ nustrom BLOCK Z-1 OFFSHORE NW PERU 3D SEISMIC ACQUISITION a OBPZenergy 10

Slide 11: Maturing Z-1 Leads into Prospects
SS a de inte Denenn-+.!!!””~ Ce Maturing Z-1 Lea ds into Prospects BPZ Energy Diagonal 3D Seismic Line 1828 [55 miles long] NE Lead A Lead H Delfin Corvina Trend Albacora Confirmed presence of undrilled structures (with multiple targets) Indications of new leads/prospects on trend of previously dril

Slide 12: BPZ Energy Barracuda seismic
) BPZ Energy Barracud + Confirmed presence of undrilled structures (with multiple targets) + Indications of new leads/ prospects on trend of previously drilled structures + Raya (Lead G) mapped is larger than original expectations

Slide 13: Raya Prospect
Raya Prospect Corvina Analog

Slide 14: Large Anticline with previously drilled wells
ergy Large Anticline with previously drilled wells indicating presence of shallow hydrocarbons

Slide 15: Oil Potential in Southern Area of Block XXIII
Oil Potential in Southern Area of Block XXIII Multiple structures with shallow oil potential in formations producing oil in Talara Basin New 2D Seismic Line BPZLOXXIII-16 (MP aw az30 2279 asn0 1290 s400 3810. amo: so90 1090 1780 1810-2870 3994 a490 2000 2130-2170 2250 2290 250 24IW 2470 2999 2986 ZE

Slide 16: Onshore Block XXII in Lancones Basin
shore Block XXII in Lancones Basin { BPZ Energy ™ Structures on both sides of the depocenter ™ Thick section of Cretaceous Muerto formation source rock expected in depocenter BPZ10XXII-16 INE} tim POCITOS S030 aaa) STRUCTURE a “se? STRUCTURE 5.009" {45,900 16

Slide 17: Next Steps Onshore
i." Next Steps Onshore ™ Block XXIII: planning to begin drilling 3 shallow exploratory wells by year-end 2013. ™ Block XIX: working to obtain environmental permit for 3D seismic acquisition. ™ Block XXII: planning to shoot confirmation 2D seismic in late 2013 and working to obtain environmental perm

Slide 18: Oil and Gas Strategy Implementation
Oil and Gas Strategy Implementat >. Short Term > 2013-14 Offshore Block Z-1 ™ Corvina CX-15: Drilling underway ™ Albacora: End Sept. / Early Oct. 2013 spud Onshore Blocks ™ Block XXIII: Shallow exploration drilling expected to begin late 2013 Medium Term => 2014-15 Offshore Block Z-1 = Continue deve

Slide 19: Finance Action Plan
Finance Action Plan Improve G&A Cost Structure ™ |nitiatives for costs savings being implemented in both Lima and Houston Capital Discipline ™ Ensure robust economics ™ Spending within cash constraints Manage Cash ™ New production from Cx-15 platform ™ Lower overall cost structure Optimize Balance S

Slide 20: Capital & Exploratory Budget
3 Capital & Exploratory Budget $ Millions Onshore Shallow drilling at Block XXIII Contingent 2D seismic Blocks XXII * Other Total Offshore Block Z-1 (fully carried by Pacific Rubiales) ** Corvina CX-15 development drilling (3 wells) Albacora drilling (2 wells) Projects & engineering Other Subtotal E

Slide 21: Activity Planned...
“Ss Activity Planned... = Drill and produce from CX-15 and Albacora platforms Existing Offshore 3D Seismic-/— > | o, B Existing Onshore 3-D Seismic = Apply new seismic data aK Existing Onshore 2D Seismic = Define Z-1 exploration campaign = Drill and develop Block Z-1 prospects ECUADOR PACIEC OCEAN =

Slide 22: Contact
Manolo Ziujfiiga President & CEO Rick Menniti Chief Financial Officer For additional information: A. Pierre Dubois Corporate Investor Relations & Communications 580 Westlake Park Blvd., Suite 525 Houston, Texas 77079 (281) 556-6200; pierre_dubois@bpzenergy.com awww, bpzenergy.com 22

Slide 23: Summary Financial Data
Summary Financial Data (MM: $Millions) Six Months Ended June 30, 2013 Revenues §26.1MM Operating loss ($ 19.9 MM) C&E expenditures* ($1.5 MM} EBITDAX ($4.9MM) Net production 1,457 bopd Realized price $ 98.5 per bbl At June 30, 2013 Cash & short term investments § 104.8 MM Block Z-1 carry remaining $

Slide 24: Appendix — GAAP Reconciliation
Appendix — GAAP Reconciliatio Reconc n of non-GAAP measure The table below represents a reconciliation of EBITDAX ta the Company’s net loss, which is the most directly comparable financial measure calculatedin accordance with generally accepted accounting principlesin the United states of America Ea
Source: SEC EDGAR · 8-K filed Sep 19, 2013
More decks from BPZ Resources Inc
Corporate Update (March 2015)6 slides · Mar 27, 2015
Debt Investor Presentation (March 2015)32 slides · Mar 10, 2015
Debt Investor Presentation (March 2015)11 slides · Mar 10, 2015
Investor Presentation (October 2014)32 slides · Oct 2, 2014
Investor Presentation (August 2014)20 slides · Aug 19, 2014
Investor Presentation (June 2014)33 slides · Jun 23, 2014