Pure Gold Mining Inc

Pure Gold Mining — Investor Presentation (June 2016)

23 slides from Pure Gold Mining's investor presentation, June 2016

  1. Slide 1: June 2016 PGM:TSX-V

    June 2016 PGM:TSX-V

  2. Slide 2: Forward Looking Statement

    FORWARD LOOKING STATEMENT Cautionary Statement on Forward-Looking Information & Statements This presentation contains certain forward-looking information and statements which may not be based on historical fact, including without limitation, statements regarding the Company’s expectations in respect

  3. Slide 3: A Fresh Look at a Historic Producer

    A FRESH LOOK AT A HISTORIC PRODUCER HIGH GRADE GOLD One of the highest grade undeveloped deposits in the world (1) with currently defined resources of 928,000 ozs at 8.93 g/t Au in 3.24 Mt indicated and 297,000 ozs at 11.74 g/t Au in 0.79 Mt inferred (2) JURISDICTION Red Lake, Ontario, Canada – an e

  4. Slide 4: Direct Red Lake Experience

    DIRECT RED LAKE EXPERIENCE MANAGEMENT & TECHNICAL TEAM BOARD OF DIRECTORS Darin Labrenz, President, CEO & Director Graeme Currie, Chairman • Former VP Business Development, Terrane Metals Corp. • Former Director, Investment Banking, of Canaccord Genuity • Former Chief Geologist, Placer Dome’s Campbe

  5. Slide 5: Capital Structure

    CAPITAL STRUCTURE Capital Structure (as at June 8, 2016) Key Shareholders Shares Outstanding 137.6 million Management & Directors 4.1% Options Outstanding 9.0 million Strategic Shareholders 19.7% Weighted average exercise price $0.27 AngloGold Ashanti 11.0% Warrants Outstanding* Evanachan Ltd. (Robe

  6. Slide 6: Red Lake Mining District

    Red Lake Mining District HIGHEST GRADE GOLD BELT IN CANADA +28 million oz high-grade gold mined in Red Lake to date (1) • Established, mining-friendly jurisdiction with 85 year history • 1.3 mozs of gold produced in the district at a grade of 19.5 g/t from 2013 to 2015 (2) • District continues to de

  7. Slide 7: Gold Project

    Madsen Gold Project FOCUSED ON NEW GOLD DISCOVERIES 3rd largest 2.5 million oz HISTORIC PRODUCTION (1) 9.9 g/t LAND PACKAGE IN RED LAKE AVERAGE HISTORIC GRADE (1) • Permitted mill and tailings management facility • 45 km2 contiguous, patented ground • Second largest historic producer in Red Lake, wi

  8. Slide 8: Mine & Mill Infrastructure

    Madsen Mine & Mill Infrastructure +$200 MILLION OF INFRASTRUCTURE Interior of Madsen mill Madsen mine complex, Russet South in background 1,275 metre deep shaft & 27 levels of workings 7 Madsen mill Permitted tailings facility

  9. Slide 9: Current Mineral Resource

    Madsen Gold Project CURRENT MINERAL RESOURCE Grade Grade Contained Gold Resource Class Zone Host Type Tonnes g/t Au oz/t oz Au Indicated Austin UC 1,677,000 7.92 0.23 427,000 South Austin UC 850,000 9.32 0.27 254,000 McVeigh UC 374,000 9.59 0.28 115,000 8 Zone UM 335,000 12.21 0.36 132,000 Total Ind

  10. Slide 10: Modern Science Driving Exploration

    Madsen Gold Project MODERN SCIENCE DRIVING EXPLORATION • Multiple highly prospective targets currently being drill tested • 10 kms of unconformity with +2.5mozs of historic production and 20 kms of prospective ultramafic contacts 9

  11. Slide 11: Multiple Gold Zones Open for Expansion

    Madsen Target Settings MULTIPLE GOLD ZONES OPEN FOR EXPANSION Note: Mine workings and geologic contacts in this image are schematic. The mineral resource estimate reported herein for the Madsen Gold Project is set out in the NI 43-101 technical report “Technical 10 Report on the Preliminary Economic

  12. Slide 12: Austin – McVeigh Fold Repetition

    Madsen Mine Geology AUSTIN – MCVEIGH FOLD REPETITION McVeigh • Limited near-surface production with a maximum historic mining depth of 230 m – open for expansion • Open to depth – focus of expanded 2016 drill program Austin • Hanging wall horizon extensively mined from surface to a depth of 1,200 m

  13. Slide 13: Targeting High Grade Gold Shoots at McVeigh

    Madsen Drill Program TARGETING HIGH GRADE GOLD SHOOTS AT MCVEIGH -300m -600m 12 Note: See Pure Gold news releases dated March 1, 2016, April 4, 2016, May 17, 2016 and June 14, 2016 for further details and disclosure

  14. Slide 14: Multiple Exploration Targets Identified

    Madsen Satellite Zones MULTIPLE EXPLORATION TARGETS IDENTIFIED 13

  15. Slide 15: Russet South

    Madsen Satellite Zones RUSSET SOUTH • High grade gold located ~1.5 km west of the McVeigh horizon and existing infrastructure • Folded repeat of the same stratigraphy that hosts the Madsen 8 Zone resource • Large mineralized system with multiple near surface, high grade gold zones discovered to date

  16. Slide 16: Preliminary Economic Assessment

    Madsen Gold Project PRELIMINARY ECONOMIC ASSESSMENT • Total gold production of ~260,000 ounces over 2016 PEA (1) a 6.5 year mine life at an average diluted head grade of 8.3 g/t gold (1) Pre-Tax / After-Tax IRR 74% / 62% • Positive preliminary economic assessment announced April 2016 Pre-Tax / After

  17. Slide 17: 2016 PEA – Opportunities for Enhancement

    Madsen Gold Project 2016 PEA – OPPORTUNITIES FOR ENHANCEMENT (1) PEA Provides a Base Case for Production Growth Expansion Potential within McVeigh • Mineral system open with current exploration targeting mineralization below current mining Greater Permitted Processing Capacity • Existing Environment

  18. Slide 18: Benchmarking vs. Peers – Resource Grade

    Pure Gold Mining BENCHMARKING VS. PEERS – RESOURCE GRADE M&I Resource Grade 12.0 11.61 10.0 M&I Resource Grade (g/t Au) 9.04 8.93 8.42 8.0 5.87 6.0 4.09 3.85 4.0 3.50 1.63 2.0 0.82 0.63 0.0 Dalradian Integra Pure Gold Oban (1) Sabina Gold Eastmain ATAC Condor Gold Midas Gold Ascot Gold Standard Infe

  19. Slide 19: Benchmarking vs. Peers – Market Cap & P/NAV

    Pure Gold Mining BENCHMARKING VS. PEERS – MARKET CAP & P/NAV Price / NAV 1.20x 0.96x 1.00x 0.91x 0.87x 0.80x 0.71x 0.64x Price / NAV 0.59x 0.60x 0.54x 0.49x 0.38x 0.40x 0.20x 0.00x Gold Standard Sabina Gold Midas Gold Integra Oban ATAC Dalradian Pure Gold Eastmain Market Capitalization $500 $455 $40

  20. Slide 20: Pure Opportunity

    PURE OPPORTUNITY Well understood deposit geology with a long mining history Large mineral system open for expansion New science has doubled the potential mineralized horizon +$200 million of infrastructure in-place at Madsen Attractive base case PEA with several opportunities for enhancement Acceler

  21. Slide 21: Appendix

    APPENDIX pureggld , 20

  22. Slide 22: 2016 PEA – Additional Details

    Madsen Gold Project 2016 PEA – ADDITIONAL DETAILS • Underground mining via mechanized cut and fill, PEA SUMMARY PARAMETERS (1) shrinkage, and long-hole mining methods Gold Price US$1,175/oz • $20.1 million in pre-production capital costs over a Exchange Rate (US$ to C$) 0.80 12-month period Total Re

  23. Slide 23: Corporate Inquiries

    Corporate Inquiries: Darin Labrenz President & CEO t: 604.646.8000 info@puregoldmining.ca PGM:TSX-V 1900 – 1055 West Hastings Street Vancouver, BC V6E 2E9 www.puregoldmining.ca

Pure Gold Mining — Investor Presentation (June 2016) on 6ix