Altitude Minerals Ltd · ASX:ATT

Altitude Minerals — Copper Search — Investor Presentation (June 2025)

30 slides from Altitude Minerals's investor presentation, Jun 4, 2025

  1. Slide 1: Investor Update Presentation

    ASX : CUS Market Cap $2.5 M INVESTOR UPDATE Share Price $0.021 PRESENTATION 4 JUNE 2025 Cash on hand (last quarterly) $1.3 M KEY TAKEAWAYS 1. Technical Team Shares on issue** 2. Strategy 119 M 3. What are HMS 4. HMS Project SA 5. NSW Au, Cu Pipeline Top 20 Shareholders 57 % **Other securities: 22M O

  2. Slide 2: Watch the full presentation

    WATCH Managing Director Duncan Chessell and Commodity Expert Ian Warland deliver the full presentation to get deeper insights. (30min) https://coppersearch.com.au/investor-update/investor-presentation-heavy-mineral-sands-focus 2

  3. Slide 3: Disclaimer, JORC Information

    DISCLAIMER, JORC INFORMATION This presentation has been prepared by Copper Search Limited (Copper Search). This document contains current background information as of the presentation date. The presentation is in summary form and does not purport to be all-inclusive or complete. Recipients should co

  4. Slide 4: Our Strategy

    OUR STRATEGY Multi-Target / Pipeline Approach Build, test and refresh a pipeline of large-scale drill targets across multiple projects and commodities within geological domains containing established profitable mines 4

  5. Slide 5: A Strategy Designed to Maximise Newsflow & Liquidity

    A STRATEGY DESIGNED TO MAXIMISE NEWSFLOW & LIQUIDITY • A continuous pipeline of pre-discovery stage drill targets being tested will maximise news flow • This “excitement zone” news flow will improve liquidity in the company • This will increase the ability to attract capital and sophisticated invest

  6. Slide 6: Great Teams Make Great Discoveries

    GREAT TEAMS MAKE GREAT DISCOVERIES The key to executing Copper Search’s ambitious strategy is successfully identifying the best drill targets that can be made ready for drill testing with only a few months of low-cost fieldwork. To achieve that, you need a great team with the right experience across

  7. Slide 7: A Rigorous Selection Process

    A RIGOUROUS SELECTION PROCESS Copper Search has refined the selection process to leverage not only the full power of our incredible team and proprietary machine learning technology, but also to efficiently and quickly identify and verify potential targets. This means our team is able to review more

  8. Slide 8: Company History and the Peake Project Origin

    COMPANY HISTORY AND THE PEAKE PROJECT ORIGIN 2021-2024 IOCG Exploration at the Peake Project ($12m) • New frontier for potential IOCG deposits, > 5,000 km2 land package • Single project focus • Multiple technical IOCG successes - Paradise Dam, Douglas Creek • Independent IOCG and Uranium Reviews lat

  9. Slide 9: Introducing the Heavy Mineral Sands Opportunity

    INTRODUCING THE HEAVY MINERAL SANDS OPPORTUNITY Jacinth-Ambrosia Mine COPPER SEARCH’S COMMODITY EXPERT Ian Warland Area of Expertise: HMS | Heavy Mineral Sands Principal Consultant on HMS Eromanga Basin, South Australia Geologist with over 30 years of experience in the mining industry and an impress

  10. Slide 10: About Mineral Sands

    ABOUT MINERAL SANDS Mineral Composition Rutile TiO2 Anatase TiO2 Ilmenite FeTiO2 Pseudo Fe2Ti3O9 Rutile (Weathered Ilmenite) Leucoxene Altered TiO2 + Fe oxides Zircon ZrSiO4 ASX PAGE 11 Monazite (Ce, La, Nd, Th)PO4 ASX PAGE 11 Zr = Zirconium The weathering journey is important to enriching Ti and el

  11. Slide 11: About Mineral Sands

    ABOUT MINERAL SANDS Mineral Composition Rutile TiO2 Anatase TiO2 Ilmenite FeTiO2 Pseudo Fe2Ti3O9 Rutile (Weathered Ilmenite) Leucoxene Altered TiO2 + Fe oxides Zircon ZrSiO4 Monazite (Ce, La, Nd, Th)PO4 Zr = Zirconium From ASX Announcement PAGE 7 11

  12. Slide 12: ASX: CUS

    From ASX Announcement PAGE 1 From ASX Announcement PAGE 2 *Samples from visual sachet logging by Diamantina HMS Laboratory, Perth. Samples were located on the Company's EL6195 – grab sample was collected and pan-concentrated prior to laboratory ASX : CUS submission for visual sachet logging. This is

  13. Slide 13: From ASX Announcement

    From ASX Announcement PAGE 6 From ASX Announcement PAGE 10 13

  14. Slide 14: From ASX Announcement

    From ASX Announcement PAGE 5 From ASX Announcement PAGE 7 14

  15. Slide 15: From ASX Announcement

    From ASX Announcement PAGE 14 From ASX Announcement PAGE 11 15

  16. Slide 16: JORC Information

    JORC Information This report includes regional data from the South Australian & New South Wales State Government website sourced from public data, as well as the Company ASX Announcement listed below and/or cross- referenced in this announcement. References to neighbouring projects have been obtaine

  17. Slide 17: News Flow

    NEWS FLOW WHAT’S COMING UP Peake HMS Project • Boots on the ground, sampling and mapping on granted NSW NSW EL6195 • Continued Project Generation and review of the entire Byrock Project Theseus Project Eromanga Basin Cu-Au Porphyry & orogenic Au Epi-thermal Au & Au-Cu Porphyry potential potential •

  18. Slide 18: Company Name Change

    COMPANY NAME CHANGE To reflect the broader commodity exploration strategy, the company intends to seek shareholder approval to change the Company Name to Altitude Minerals Ltd Mid-2025 expected 18

  19. Slide 19: Pipeline of Targets

    PIPELINE OF TARGETS NSW Gold and Copper Projects 19

  20. Slide 20: Theseus Project Secured May 2025

    PROJECT SECURED MAY 2025 NEW THESEUS PROJECT SUMMARY THESEUS PROJECT • Strategic 944km2 position in the Macquarie Arc – Lachlan Fold Belt, NSW • The Theseus Project is prospective for epi-thermal gold and Cu-Au porphyry deposits, and is located 25km east of the operating Cowal Gold AN ESTABLISHED MI

  21. Slide 21: Byrock Project Secured Feb 2025

    PROJECT SECURED FEB 2025 BYROCK PROJECT CHECKLIST Check Criteria Comments BYROCK PROJECT BYROCK PROJECT Yes Profitable mines nearby Multiple – Lachlan Orogen Yes Large-scale potential >2mt Cu potential Yes Mineral System Porphyry, well understood Excellent Depth primary targets ~100m, shallow Yes Po

  22. Slide 22: Company Interpreted Macquarie Arc Extension (North)

    COMPANY INTERPRETED MACQUARIE ARC EXTENSION (NORTH) BYROCK PROJECT Depth of Cover Map New Theseus Project 22

  23. Slide 23: Geophysics Update - May 2025

    GEOPHYSICS UPDATE - 7 MAY 2025 (ASX) BYROCK PROJECT Latest Update 26 May 2025 • Teams in the field now • Ground truthing Pipe Targets • Gravity surveys, soils and rock chipping are underway • Low-cost drill target validation • Further results in June Prospect Location Map with new magnetic data as b

  24. Slide 24: Geophysics Update - Byrock CS03 Prospect

    GEOPHYSICS UPDATE - 7 MAY 2025 (ASX) BYROCK PROJECT - CS03 PROSPECT Potential drill target, confirming with soils survey IP Cross Section through Prospect CS03 with 20msec chargeability anomaly (blue polygon) open along strike to the southwest and northeast. Prospect Location Map CS03, CS13 24

  25. Slide 25: Appendix

    APPENDIX Deal terms on NSW Projects 25

  26. Slide 26: Deal Terms - Option, Earn-in and JV Agreement

    DEAL TERMS - OPTION, EARN-IN AND JV AGREEMENT BYROCK PROJECT Minimum Spend Consideration Shares Consideration Cash Stage Duration % CUS CUS to NIM to NIM Option Period 1 year $350k 3.23m shares $25k (paid) Nil Stage One Earn-in 2 years $2m $200k shares* nil 51% Stage Two Earn-in 2 years $3m $300k sh

  27. Slide 27: Deal Terms - Option to Purchase Outright

    DEAL TERMS - OPTION TO PURCHASE OUTRIGHT THESEUS AU-CU PROJECT, NSW Event Consideration Shares to RIM Consideration Cash to RIM Total Consideration 6-month Option Period Nil $50,000 $50,000 Outright Purchase $100,000 shares* $100,000 $200,000 First JORC MRE (Deposit) Milestone $100,000 shares* $100,

  28. Slide 28: Detail - The Team

    DETAIL - THE TEAM BOARD EXPLORATION TEAM Chris Sutherland, Non-Executive Chairman Duncan Chessell, Managing Director, CEO and Exploration Manager Chris is a civil engineer with over 20 years of business experience. He was Managing Director Technical Advisor Committee Member of Programmed, a major su

  29. Slide 29: Detail - The Team

    DETAIL – THE TEAM THE TECHNICAL REVIEW COMMITTEE COMMODITY EXPERTS | CONSULTING GROUP The committee oversees the exploration programs and reviews new Dr Paul Kitto projects the exploration team proposes before funds are committed. Area of Expertise: Gold | Base Metals | Rare Earth Elements Dr Kitto

  30. Slide 30: Contact

    CONTACT Duncan Chessell Managing Director +61 414804055 duncan@coppersearch.com.au www.coppersearch.com.au Adelaide Office 21 Sydenham Road Norwood SA 5067 Authorised for release by Duncan Chessell, Managing Director 30

Copper Search — Investor Presentation (June 2025) on 6ix