Mindspace Business Parks Reit · NSE:MINDSPACE.RR
Mindspace Business Parks Reit — Q1 FY26 Earnings Presentation
61 slides from Mindspace Business Parks Reit's earnings presentation, Aug 4, 2025
Slide 1: Q1 FY26 Investor Presentation
Q1 FY26 Investor Presentation 4th August 2025
Slide 2: Disclaimer
Disclaimer By attending the meeting where this presentation (“Presentation”) is made, or by reading the Presentation materials, you agree to be bound by the following limitations: This Presentation (a) is for information purposes only without regards to specific objectives, financial situations or n
Slide 3: Table of Contents
Table of Contents Key Highlights 4 Key Highlights 4 01 Project Updates 10 Project Updates 10 02 Financial Update 12 Financial Update 12 03 Our Markets 17 Our Markets 17 04 Our Franchise Portfolio 25 Our Franchise & Portfolio 25 05 Re-energizing Parks 37 Re-energizing Parks 37 06 Value creation via E
Slide 4: Key Highlights
ant AU if nt = a wa = i i 01 Key Highlights
Slide 5: Strong Financial Performance fueled by Sustained Demand for Grade-A Assets
Strong Financial Performance fueled by Sustained Demand for Grade-A Assets 1.7 msf 93.7% msf (1) Gross Leasing Q1 FY26 Committed Occupancy Sequentially up 0.7% INR 6,164 Mn INR 3,527 Mn (Q1 FY25 - INR 4,964 mn) (Q1 FY25 - INR 2,989 mn) Q1FY26 NOI Q1FY26 Distribution Up 24.2% Y-o-Y Up 18.0% Y-o-Y Lik
Slide 6: Key Operating Indicators Q1 FY26
Delivered Strong Operational performance Key Operating Indicators Q1 FY26 Gross Leasing 1.7 msf Re-leased Area 1.2 msf New and Vacant Area Leased 0.5 msf Portfolio In-Place rent c. 73 psf/Month Re-leasing Spread(1) 29.5 % on 1.4 msf Average Rent for Area Leased INR 78 psf/Month mindspacereit.com 6 1
Slide 7: Modern and Sustainable workplaces attracting occupiers
Modern and Sustainable workplaces attracting occupiers Airoli West Committed Occupancy crosses 90% for the 1st time 100% 100% 100% 100% 100% 99.2% 97.3% Gera The Square The Square Commerzone Commerzone Mindspace Mindspace Commerzone Nagar Road BKC Porur Raidurg Malad Madhapur Kharadi Pune Q1 FY26 –
Slide 8: Mindspace Fusion launch will further energize Airoli East
Mindspace Fusion launch will further energize Airoli East Starbucks commenced operations mindspacereit.com 8
Slide 9: Q1FY26 – Healthy re-leasing spread of 29.5%
Q1FY26 – Healthy re-leasing spread of 29.5(1)(2)% ~78% re-leasing visibility (incl. area re-let in Q1) Overview of Lease Expiry and Re-leasing spread FY26 E Expiries Average 2.2 msf (3) Re-leasing Spread(2) 22.2% (Since listing) 1.5 msf Expect to 0.7msf Retain Exits Average Annual 3.0 msf Lease expi
Slide 10: Project Updates
is ad sushi 02 oject Updates Pr
Slide 11: Gearing for Demand Resurgence
Gearing for Demand Resurgence Hyderabad Hyderabad Hyderabad Mindspace Madhapur Mindspace Madhapur Mindspace Madhapur (Pearl Club) (B1, Re-development) (B8, Re-development) ▪ Leasable area: 0.13 msf ▪ Leasable area: 1.5 msf ▪ Leasable area: 1.6 msf ▪ Status: OC applied (Club ID, Façade & ▪ Status: 13
Slide 12: Financial Update
et ¥ a a ti ; : &® ve) © Financial Update
Slide 13: Key Financial Indicators Q1 FY26
Financial Performance Driven by Organic Cash Flows and Acquisition Key Financial Indicators Q1 FY26 (Y-o-Y) Figures in INR Mn Revenue from Operations(1) 7,523 21.4% Net Operating Income(1) 6,164 24.2% Distribution 3,527 18.0% DPU 5.79 p.u 14.9% Loan to Value (2) 25.0% %% Cost of Debt 7.84% p.a.p.m (
Slide 14: NDCF Build-up Q1 FY26
NDCF Build-up Q1 FY26 Particulars (INR Mn) Q1 FY26 Revenue from Operations(1) 7,523 Property Taxes & Insurance (228) Other Direct Operating Expenses (1,131) Net Operating Income (NOI) 6,164 Property Management Fees (173) Net Other Expenses (175) (1) EBITDA 5,817 Cash Taxes (Net of Refunds) (595) Wor
Slide 15: Delivered Healthy Distribution Growth
Delivered Healthy Distribution Growth Distribution Overview Q1 FY26 Q1 FY26 Distribution Repayment of Capital, INR 3,527 Mn ₹2.47, 42.7% DPU ₹5.79 p.u. Interest, ₹0.10, 1.7% INR 5.79 p.u. Dividend, ₹3.19, 55.1% Yield Other Income, ₹0.03, 0.5% (1) 5.8% Declaration Date Record Date Payment Date Key Da
Slide 16: Low Leverage Offers Balance Sheet Headroom for Future Growth
Low Leverage Offers Balance Sheet Headroom for Future Growth ₹ 91,666Mn 25.0% INR 2,859Mn 7.84% 4.4 x 3.3x Net Debt to Undrawn Committed Cost of Debt Interest Coverage Net Debt (1) Net Debt to EBITDA(5) Market Value (1) Facilities (p.a.p.m.) Ratio(6) Diversified debt Book with a mix of debentures We
Slide 17: Our Markets
A SRaBeEaes we) NN AVUVRULEE: ‘i rere Se ca | 04 Our Markets
Slide 18: Indian Office Sector: Riding the Winds of Favorable Trends
Indian Office Sector: Riding the Winds of Favorable Trends Emerging trends Rising GCC Return to in India’s Office Domestic landscape Office Market Occupiers c. 24 msf c. 35% c. 42% 75%-85% Net absorption in % contribution of % share in overall Net Physical Occupancy H1CY2025(1) GCCs in office absorp
Slide 19: GCCs: India a preferred destination
GCCs: India a preferred destination c. 50% 81.3 1.9 Mn c. 85% msf % share of India in Total space leased GCC employees in Lower average global GCC by GCCs since India(1) salary of engineers market(1) 2022-H1 CY2025(1) viz-a-viz developed countries(1) GCC Growth forecast 300 Factors driving GCC leasi
Slide 20: Hyderabad – Second largest Tech hub of India
Hyderabad – Second largest Tech hub of India Progressive government policies and Infrastructure growth are key market drivers Hyderabad’s GCC Landscape 9.5 ~3.8 msf 365+ 18% Lakh Tech workforce in Telangana Leasing activity in H1 CY2025 (1) GCCs in Hyderabad(1) Hyderabad’s share of all driven by Hyd
Slide 21: Madhapur as the preferred office market in Hyderabad
Madhapur as the preferred office market drives highest absorption in Hyderabad 90+ 2nd 79 msf 67% Rs psf (in Size) 56% share of City’s Share of net absorption since Highest rentals amongst all Largest micro market across office stock(1) CY 2019(1) micro markets India (1) 1. (1)i n m (1) Source: d s
Slide 22: Mumbai Region - Infrastructure projects driving office demand uptick
Mumbai Region - Infrastructure projects upgrades driving office demand uptick Navi Mumbai – A Preferred Location with Accessible Talent 137 msf top 3 2.7 msf Ranked amongst in terms of overall quality of living in India 3 Ranked rd , 2nd time in a row, in cleanliness index(1) in India Completed Stoc
Slide 23: Pune - Thriving Office Market with Excellent Social Infrastructure
Pune - Thriving Office Market with Excellent Social Infrastructure SBD East Micro Market(1) 89 msf ~3.8 msf 50 msf 59% Completed Stock as on Avg. annual net absorption Q2 CY2025( (1) since CY 2019 (1) 56% share of City’s Share of net absorption office stock(1) since CY 2019(1) 85-90 Pune Airport cap
Slide 24: Chennai - One of the key growth markets
Chennai - One of the key growth markets South-West Micro Market(1) 80 msf ~3.7 22 msf 32% msf Completed Stock as on Average annual net 27% share of City’s Share of net absorption Q2 CY2025(2) absorption since 2019(2) office stock(1) since 2019 (1) Highest ever net leasing in Chennai in CY2023 6.6 Ch
Slide 25: Our Franchise & Portfolio
is ad sushi 05 Our Franchise & Portfolio
Slide 26: Sponsored by One Of India's Leading Real Estate Group
Sponsored by One Of India’s Leading Real Estate Group Over 6 Decades Pan India INR 514Bn (5) of experience Market Capitalization presence of 3 listed entities Office Hospitality Malls Residential Retail Developed residential Operates 280+ retail Leasable Area >55 msf (1) c.4,200+ (2) keys 7 malls (3
Slide 27: Mindspace REIT's Presence in Key Office Markets
Mindspace REIT’s Presence in 4 Key Office Markets Located strategically in established office micro-markets Mumbai Hyderabad Region 38.1 msf 14.5 msf Total Leasable Area(1) 16.9 msf INR 372.1 Bn (1,2) Gross Asset Value Presence in Presence in Malad-Goregaon Madhapur & and Financial District Navi Mum
Slide 28: Delivered Robust Performance
Delivered Robust Performance Cumulative distribution of INR 94.0 p.u. since listing c. 25.2 msf (1) 6.4% CAGR Gross Leasing In-place rent(5) INR 55.9 Bn 14.7 % Total distribution(2) Annualized returns(3) 3.7 msf Delivered New 3.1 msf (8) Developments Area Acquired 7.84 % p.a.p.m. 25.0 % Cost of Debt
Slide 29: High Quality Office portfolio in Prime Locations (1/5)
High Quality Office portfolio in Prime Locations (1/5) Mindspace Madhapur, Hyderabad 13.7 msf Leasable Area 10.0 msf Completed Area 97.3% Committed Occupancy Commerzone Raidurg, Hyderabad 1.8 msf Leasable Area 1.8 msf Completed Area 100.0% Committed Occupancy Data m i n das s pofa 30-Jun-25 cereit.c
Slide 30: High Quality Office portfolio in Prime Locations (2/5)
High Quality Office portfolio in Prime Locations (2/5) Commerzone Kharadi, Pune 3.0 msf Leasable Area 3.0 msf Completed Area 100.0% Committed Occupancy Commerzone Yerwada, Pune 1.7 msf Leasable Area 1.7 msf Completed Area 94.6% Committed Occupancy mData i n d as s pofa c 30-Jun-25 ereit.com 30 Note:
Slide 31: High Quality Office portfolio in Prime Locations (3/5)
High Quality Office portfolio in Prime Locations (3/5) The Square Nagar Road, Pune 0.8 msf Leasable Area 0.8 msf Completed Area 100.0% Committed Occupancy Commerzone Porur, Chennai 1.1 msf Leasable Area 1.1 msf Completed Area 100.0% Committed Occupancy Data m i n das s pofa 30-Jun-25 cereit.com 31
Slide 32: High Quality Office portfolio in Prime Locations (4/5)
High Quality Office portfolio in Prime Locations (4/5) Mindspace Airoli East, Navi Mumbai 7.2 msf Leasable Area 4.9msf Completed Area 78.1% Committed Occupancy Mindspace Airoli West, Navi Mumbai 6.4 msf Leasable Area 5.3 msf Completed Area 92.0% Committed Occupancy Data m i n das s pofa 30-Jun-25 ce
Slide 33: High Quality Office portfolio in Prime Locations (5/5)
High Quality Office portfolio in Prime Locations (5/5) Mindspace Malad, Mumbai 0.8 msf Leasable Area 0.8 msf Completed Area 99.2% Committed Occupancy The Square BKC, Mumbai 0.1 msf Leasable Area 0.1 msf Completed Area 100.0% Committed Occupancy mindspacereit.com 33 Data as of 30-Jun-25
Slide 34: Concluded 1st Third Party Acquisition: Q-City Hyderabad
Concluded 1st Third Party Acquisition(1): Q-City- Hyderabad (To be rebranded as ‘The Square 110 Financial District’) c. 6 acres c. 0.81msf c. 64.5% c. 3 Yrs INR C. 60.0 psf Plot Area Total Leasable Committed WALE In-Place Rent Area Occupancy(2) Numbers as of 30th June 2025, unless stated otherwise m
Slide 35: Diversified Portfolio of Marquee Tenants
Diversified Portfolio of Marquee Tenants Top 10 tenants contributing 34.8% (Jun-25) vs. 33.0% (Mar-25) Diversified tenant mix across sectors Top 10 tenants Gross Contracted Rentals contribution (34.8%) (1) (1) % split by Gross Contracted Rentals % of total Gross Contracted Rentals # of parks British
Slide 36: Marquee Tenant Base
Marquee Tenant Base Leading MNCs and Fortune 500 companies across sectors Technology Technology Financial Services Financial Services Diversified Diversified Accenture Wipro Barclays SMFG Smartworks Verizon Cognizant Atos India Fiserv Allstate Hitachi energy Qualcomm Highradius NCR Princeton B.A. Co
Slide 37: Re-energizing Parks
au °) © = a Bs! Parks energizing Re
Slide 38: Dynamic Environment, Vibrant Workspaces
Dynamic Environment, Vibrant Workspaces mindspacereit.com 38
Slide 39: Energized Landscape for Business Excellence
Energized Landscape for Business Excellence mindspacereit.com 39
Slide 40: Infusing modern design elements to elevate experience
Infusing modern design elements to elevate experience Tailoring common areas to meet the evolving preferences of tenants mindspacereit.com 40
Slide 41: Experience Center: An Inclusive Ecosystem for all Lifestyle & Business Needs
Experience Center: An Inclusive Ecosystem for all Lifestyle & Business Needs Enhancing the Mindspace offering with a modern club facility with top notch amenities c. 130 ksf Exclusive and premium space Perspective Offers enriching entertainment, sports, lifestyle, recreation and dining experiences m
Slide 42: Curated mix of amenities enhancing work place experience
Curated mix of amenities enhancing work place experience Badminton | Squash | Indoor-Outdoor Cafes Bar and Lounge Tennis Yoga | Meditation | Aerobic State of the art gym facility Half Olympic Size Lap Pool Rooms mindspacereit.com 42
Slide 43: SOCIALising at Vantage Café in the Park
SOCIALising at Vantage Café in the Park The first-ever SOCIAL in One of the largest SOCIAL Hyderabad OUTLETS in the country mindspacereit.com 43
Slide 44: Tenant Engagement Initiatives, Designed to Build Camaraderie
Tenant Engagement Initiatives, Designed to Build Camaraderie MPL – CRICKET EDITION MPL – CRICKET EDITION MPL – CRICKET EDITION Yoga Day Yoga Day MPL – CRICKET EDITION IPL SCREENINGS IPL SCREENINGS IPL SCREENINGS mindspacereit.com 44
Slide 45: Value creation via ESG
Sd a a o>) ion vid Value creat
Slide 46: ESG - Key Highlights
ESG - Key Highlights Scope 1+2 emission 40.2% 55,295 Renewable energy mix tCO2e for FY25(1) (32.2% reduction from FY20 baseline) 13,43,724 KL 56.02% of material Water Recycled sourced using sustainable sourcing INR 18.5 Bn (2) INR 6.5 Bn of Cumulative Green / Sustainability linked Bond Sustainabilit
Slide 47: Key Achievements and Awards
Key Achievements and Awards Mindspace REIT: Real Estate Excellence • Received the coveted title of ‘Global Listed Sector Leader-Office Development Benchmark’by GRESB, for the 2nd consecutive year • Received 5 star rating by GRESB for 3rd consecutive year, along with Green Star • Secured a prestigiou
Slide 48: Focus On High Corporate Governance Standards
Focus On High Corporate Governance Standards Strong governance framework complemented by partnership with leading institutional investors Mindspace REIT: Top-Notch Standards 10 Member Board / Independent Chairman • 60% independent directors on the Board • Manager can be removed with 60% approval of
Slide 49: Shareholding Pattern
is ad sushi 08 Shareholding Pattern
Slide 50: Unitholding Pattern as on 30 Jun 2025
Unitholding Pattern as on 30 Jun 2025 Unitholding Summary INR 24,370 Cr 35.6% Market Cap(1) % Free- float 609 Mn units Unitholding Pattern (Market Cap : INR 244 Bn) (1) AIF MF NIIs 0.4% 5.1% 9.5% Insurance 3.7% DIIs Sponsors & Sponsor Public 2.9% Group (3) (Others) Total 64.4% 35.6% FIIs 14.0% Unith
Slide 51: Annexure
09 Annexure
Slide 52: Strong NOI Growth Driven by Rental Growth and Contribution from Acquisitions
Strong NOI Growth Driven by Rental Growth and Contribution from Acquisitions Revenue from Operations (INR Mn)(1) NOI (INR Mn)(1) % of NOI Assets Q1 FY26 Q1 FY25 Q1 FY26 Q1 FY25 Q1 FY26 Mindspace Airoli (E) 1,013 1,026 692 785 11% Mindspace Airoli (W) 1,235 928 940 683 15% Mindspace Malad 269 259 233
Slide 53: Structure of Mindspace REIT
Structure of Mindspace REIT Unitholders Investment In Distribution Mindspace REIT Investment Manager Trust Trustee K Raheja Corp Investment Managers Mindspace Business Parks REIT Axis Trustee Services Limited Private Limited(1) SPV: K Raheja SPV: Avocado SPV: SPV: KRC SPV: Gigaplex SPV: Sustain IT P
Slide 54: Portfolio Summary
Portfolio Summary 30.2 msf of Completed area with WALE of 7.6 years and MTM potential of 10.4%(1) Total Committed WALE on Leasable Completed UC/Future Occupancy In-place Rent Asset Occupancy area Area Area (msf) Area (msf) (%) (INR psf) (%) (years) (msf) Mindspace Airoli East 7.2 4.9 2.3 73.4% 78.1%
Slide 55: Breakup of Lease Expiry Profile
Breakup of Lease Expiry Profile Q2-Q4 FY26 FY27 FY28 % of Asset Gross Rent at Area % of Gross Rent at Area % of Gross Rent at Area Expiring Contrac Expiry Expiring Contracted Expiry Expiring Contracted Expiry (msf) ted (INR psf) (msf) Rentals (INR psf) (msf) Rentals (INR psf) Rentals Mindspace Airol
Slide 56: Key Financial Metrics
Key Financial Metrics Delivered consistent growth on key financial metrics Revenue (INR bn) (1) NOI (INR bn) (1) 7.5 6.5 6.2 6.8 6.0 6.4 5.4 6.2 6.2 5.5 5.2 5.9 6.0 5.9 5.0 5.0 5.6 5.0 4.8 4.7 4.8 4.5 4.5 4.0 3.5 3.0 Q1 FY24 Q2 FY24 Q3 FY24 Q4 FY24 Q1 FY25 Q2 FY25 Q3 FY25 Q4 FY25 Q1 FY26 Q1 FY24 Q2
Slide 57: Debt Maturity Schedule as on 30-Jun-25
Debt Maturity Schedule as on 30-Jun-25 Interest Wt. Avg. Principal Repayment Description Fixed/ Total Undrawn Principal Rate Maturity (INR Mn) Floating Facility Facility O/S FY31 & (p.a.p.m) (Years) FY26 FY27 FY28 FY29 FY30 Total Beyond At REIT Level NCD4 Fixed 5,000 - 5,000 7.9% 2.1 - - 5,000 - - -
Slide 58: De-risked Portfolio with ~91.8% Completed Assets
De-risked Portfolio with ~91.8% Completed Assets Project wise Market Value breakup (1) Completed Assets form 91.8% of the Market Completed U/C & Future Dev. Total Value % of Total Asset Value(1) (INR Mn) (INR Mn) (INR Mn) (%) Mindspace Airoli East 46,240 3,749 49,989 13.6% Mindspace Airoli West 51,7
Slide 59: Research Houses Covering Mindspace REIT
15 Research Houses Covering Mindspace REIT Research House Analyst Email Id Ambit Capital Karan Khanna karan.khanna@ambit.co Avendus Spark Girish Choudhary girish.c@avendusspark.com Axis Capital Pritesh Sheth pritesh.sheth@axiscap.in Bank of America Kunal Tayal kunal.tayal@bofa.com CITI Research Raji
Slide 60: Key Definitions
Key Definitions Asset SPVs Collectively, Avacado, Gigaplex, Horizonview, Intime, KRIT, KRC Infra, MBPPL, Sustain and Sundew Occupied Area + Committed Area Committed Occupancy (%) Completed Area Committed Area Completed Area which is unoccupied but for which letter of intent/ agreement to lease have
Slide 61: Thank You
Thank You
Mindspace Business Parks REIT — Q1 FY26 Earnings Presentation on 6ix