Bannerman Energy Ltd · ASX:BMN

Bannerman Energy — Bannerman Resources — Shareholder Meeting (November 2011)

21 slides from Bannerman Energy's shareholder meeting presentation, Nov 17, 2011

  1. Slide 1: Annual General Meeting

    For personal use only Annual General Meeting 17 November 2011 Perth, Western Australia

  2. Slide 2: Technical Disclosures and Forward-Looking Disclaimers

    Technical Disclosures and Forward-Looking Disclaimers For personal use only Certain disclosures in this presentation, including management's assessment of Bannerman Resources Ltd’s plans and projects, constitute forward-looking statements that are subject to numerous risks, uncertainties and other f

  3. Slide 3: Nuclear Power Tigers

    Nuclear Power Tigers For personal use only • 2.5 billion people in China and India – 36 % of global population. • Both countries enjoying 8%+ GDP growth. • 1 billion people will live in China’s cities by 2030*. • China will become the world’s largest economy before 2020. • Total net electricity gene

  4. Slide 4: New Reactor Build Outlook

    New Reactor Build Outlook: Key nuclear growth nations remain firmly committed…but do not For personal use only have the required uranium # reactors 200 180 Proposed 443 reactors operating 160 Planned 178 under construction 140 Under Construction 325 planned and proposed Operating Reactors 120 100 By

  5. Slide 5: Bannerman Share Price Leverage

    Bannerman Share Price Leverage For personal use only 5

  6. Slide 6: Uranium price – a positive long term trend

    Uranium price – a positive long term trend For personal use only Price source: Ux Consulting. 6

  7. Slide 7: Etango – Top Global Uranium Project

    Etango – Top 15 Global Uranium Project For personal use only Contained Resources (Mlbs U3O8) Developing of Pure Uranium Projects Producing 1,000 856 800 619 Namibia 600 502 488 446 407 400 343 261 256 212* 173 200 101 80 0 Cameco / Kazatomprom Ranger/Jabiluka McArthur River Imouraren Inkai Lethlakan

  8. Slide 8: Etango – Top Global Uranium Project

    Etango – Top 15 Global Uranium Project For personal use only 8

  9. Slide 9: DFS Timetable

    DFS Timetable Dec-10 Mar-11 Jun-11 Sep-11 Dec-11 Mar-12 Jun-12 For personal use only Qtr Qtr Qtr Qtr Qtr Qtr Qtr PFS Update (Completed) PFS Review (Completed) Incorporate Met. testwork Engineering Financial opportunities & site layout (Completed) & Costing Modelling (Completed) On-site pilot plant I

  10. Slide 10: Etango – A Unique Deposit

    Etango – A Unique Deposit Granitic – “sand & gravel” For personal use only like, with no clay 1. Consistent mineralisation in Close-up image of the base of a 7 broad zones. metre column test 2. Shallow deposit enables fast ramp-up as 70% of the mineralisation is in the top 200 metres. 3. Uniform and

  11. Slide 11: Prioritised material movement…

    Prioritised material movement… For personal use only 0 1km 2km Updated Etango Site Layout 11

  12. Slide 12: Simplified Process Flowsheet…

    Simplified Process Flowsheet… For personal use only 12

  13. Slide 13: First uranium from Etango

    First uranium from Etango For personal use only  Processing testwork relocated to Swakopmund, Namibia.  Confirms flowsheet for SX and precipitation circuits. Country Manager – Werner Ewald holding uranium in the form of ammonium diuranate (ADU). 13

  14. Slide 14: Significant Mine Life Upside

    Significant Mine Life Upside For personal use only Hyena Deposit (Inferred resource) Ondjamba Deposit (Inferred resource) Open at depth Resource zones outside pit design Etango Deposit (88% in Measured & Indicated resource categories) 1km 14

  15. Slide 15: Exploration Upside

    Exploration Upside For personal use only 1. Onkelo West – mineralised alaskite rocks at surface indicating potential for parallel structures. 3 2. Hyena/Ondjamba – previous drilling indicates good potential to connect the two inferred resource areas. 3. Rössingberg/Ombuga/Gohare – previous RadonXTM

  16. Slide 16: Sustainability – making a real difference

    Sustainability – making a real difference For personal use only Learner assistance school programs Radiation safety initiatives, including the first Radiation Management Plan Metallurgical testwork transferred to Swakopmund Pioneered cooperation with tourism Environmental rehabilitation bodies inclu

  17. Slide 17: Consistent improvement in health and safety performance

    Consistent improvement in health and safety performance For personal use only Injury Frequency Rate Trends Zero LTI’s in past 2 years Zero injuries in last 12 months 17

  18. Slide 18: By end-March 2012…

    By end-March 2012… For personal use only Bannerman Resources will: 1. Have a DFS confirming the technical viability of a +15 year mine life at 6-8 Mlbs U3O8 per annum. 2. Have lodged its supplementary information in support of the existing mining license application. 3. Be extremely well positioned

  19. Slide 19: Positioned for re-rating…

    Positioned for re-rating… A$6.00 For personal use only A$5.48 Enterprise values (A$) per U3O8 resource pound A$5.00 A$4.00 A$3.22 A$3.00 A$2.00 A$1.06 A$1.06 A$1.00 A$0.85 BMN A$0.39/lb - Exploration Pre-feasibility Feasibility Developer Producer Source: Various broker research, November 2011 19

  20. Slide 20: Scale, Simplicity, Substance

    www.bannermanresources.com For personal use only Scale, Simplicity, Substance

  21. Slide 21: Mineral Resource Statement

    APPENDIX Mineral Resource Statement As at November 2011 For personal use only Etango Project* Mineral Resource Estimate at a cut-off grade of 100ppm U3O8 Category Tonnes Grade Contained U3O8 (Mt) (ppm U3O8) (Mlbs) Measured 62.7 205 28.3 Indicated 273.5 200 120.4 Measured & Indicated 336.2 201 148.7

Bannerman Resources — Shareholder Meeting (November 2011) on 6ix