Enka Insaat ve Sanayi A.S. · BIST:ENKAI

Enka Insaat ve Sanayi A.S — FY2014 Earnings Presentation

52 slides from Enka Insaat ve Sanayi A.S's earnings presentation, Apr 3, 2015

  1. Slide 1: TSO 18001 A

    Slide 1: TSO 18001 A

    U2 u ) s TSO 18001 A

  2. Slide 2: Introduction

    Slide 2: Introduction

    INTRODUCTION  57 Years of Construction Experience Worldwide  A Group of Companies Composed of More Than 50 Subsidiaries Operating in 6 Major Geographical Areas: CIS, Asia, Middle East, Europe, Africa & Turkey  476 Projects in 45 Countries have been Completed or Under Construction with Historical

  3. Slide 3: Capabilities & Operations

    Slide 3: Capabilities & Operations

    CAPABILITIES & OPERATIONS With a Solid Background of 57 Years ENKA Operates in 4 Main Segments  Engineering & Construction  Energy  Real Estate  Trade 3

  4. Slide 4: Milestones

    Slide 4: Milestones

    MILESTONES 1957 – Founded as a Limited Liability Partenership as Şarık Tara & Sadi Gülçelik ENKA Limited Şirketi 1962 – Focused on Design, Engineering and Construction Activities of Industrial Plants, Buildings and Infrastructure 1967 – The Partnership was Transformed into a Joint Stock Company as E

  5. Slide 5: Milestones (Cont'd)

    Slide 5: Milestones (Cont'd)

    MILESTONES (Cont'd) 1983 – ENKA Sports, Education and Culture Foundation and Sadi Gülçelik Sports Center Establishments 1984 – First Natural Gas Combined Cycle Power Plant in Turkey 600 MW Trakya CCCP 1986 – Multinational Joint Ventures 1986 – Outstanding Achievements with Fast-Track Projects in Lib

  6. Slide 6: Milestones (Cont'd)

    Slide 6: Milestones (Cont'd)

    MILESTONES (Cont'd) 2000 – Power Generation as Independent Power Producer (IPP) 2001 – Certified by BSI for ISO 9001 Quality Management System 2002 – Merged with Enka Holding under ENKA İnşaat ve Sanayi A.Ş. 2002 – Certified by BSI for ISO 14001 Environmental Management System and OHSAS 18001 Occupa

  7. Slide 7: Milestones (Cont'd)

    Slide 7: Milestones (Cont'd)

    MILESTONES (Cont'd) 2010–ENKA Set a New World Record For Power Plant Availability (with 99,8% which is 7% Over the Industry Average) over the 12-Month Period with GE 9 FA Gas Turbines 2011–First Contract Awarded in Continent America – New US Embassy Compound in Santa Domingo, Dominican Republic 2011

  8. Slide 8: Milestones (Cont'd)

    Slide 8: Milestones (Cont'd)

    MILESTONES (Cont'd) 2012–Al-Najybia 500 MW Gas Turbine Power Plant and Rumaila Crude Oil Pumping Station Projects have been Awarded. 2012–Steel Works Contract of Izmit Bay Crossing Suspension Bridge Project has been Awarded. 2013–Sulaymaniyah and Dohuk Combined Cycle Plant Conversion Projects have b

  9. Slide 9: Vision and Values

    Slide 9: Vision and Values

    VISION AND VALUES The Following Vision and Values Define What is Meant to be ENKA. - Excellence - Innovation - Speed - Safety - Being a Good Member of the Community - Its People 9

  10. Slide 10: Shareholder Structure

    Slide 10: Shareholder Structure

    SHAREHOLDER STRUCTURE 31,45% 50,08% TARA FAMILY 12,60% ENKA FOUNDATION 5,87% FREE FLOAT GÜLÇELİK FAMILY As of December 31, 2014 10

  11. Slide 11: Consolidated Financial Highlights

    Slide 11: Consolidated Financial Highlights

    CONSOLIDATED FINANCIAL HIGHLIGHTS ( Million USD ) 2014 2013 2012 TOTAL ASSETS 7.813 8.471 8.238 TOTAL EQUITY 5.157 5.597 5.099 CASH & MARKETABLE SECURITIES 2.990 2.752 2.707 REVENUE 5.821 6.547 5.746 EBITDA 827 1.032 704 EBITDA MARGIN % 14,2 15,8 11,0 NET PROFIT 659 656 628 NET MARGIN % 11,3 10,0 10

  12. Slide 12: Revenues by Business Lines

    Slide 12: Revenues by Business Lines

    REVENUES BY BUSINESS LINES 2014 2013 2012 ( Million USD ) USD % USD % USD % CONSTRUCTION 2.139 36,8 2.550 38,9 1.384 24,1 POWER GENERATION 3.159 54,3 3.284 50,2 3.653 63,6 REAL ESTATE 485 8,3 478 7,3 442 7,7 TRADE 302 5,1 447 6,8 395 6,9 ELIMINATION (264) (4,5) (212) (3,2) (128) (2,3) TOTAL 5.821 10

  13. Slide 13: EBITDA by Business Lines

    Slide 13: EBITDA by Business Lines

    EBITDA BY BUSINESS LINES 2014 2013 2012 ( Million USD ) USD % Margin USD % Margin USD % Margin CONSTRUCTION 196 24 9 357 35 15 119 17 9 POWER GENERATION 260 31 8 273 27 8 267 38 7 REAL ESTATE 337 41 70 346 34 73 287 41 65 TRADE 27 3 9 48 5 11 23 3 6 ELIMINATION 7 1 7 1 8 1 TOTAL 827 100 1.031 100 70

  14. Slide 14: Share Capital Increases and Dividends

    Slide 14: Share Capital Increases and Dividends

    Share Capital Increases and Dividends (Turkish Liras) Date Previous Share Capital Increase Increase (%) Increased Share Capital 25.05.2010 1.800.000.000 400.000.000 22,22% 2.200.000.000 02.06.2011 2.200.000.000 300.000.000 13,64% 2.500.000.000 25.05.2012 2.500.000.000 300.000.000 12,00% 2.800.000.00

  15. Slide 15: Top Management

    Slide 15: Top Management

    TOP MANAGEMENT BOARD OF DIRECTORS M.Sinan Tara Chairman of the Board Haluk Gerçek Vice Chairman of Board Erdoğan Turgut Member of Board (Non-executive Member) E. Melih Araz Member of Board (Non-executive, Independent Member) V. Ergin İmre Member of Board (Non-executive, Independent Member) EXECUTIVE

  16. Slide 16: Work Force

    Slide 16: Work Force

    WORK FORCE Technical Administrative As of December 2014 Workers TOTAL Staff Staff ENKA Istanbul Head Quarters 306 112 77 495 ENKA Subsidiaries in Turkey 913 463 1.873 3.249 ENKA Abroad 738 339 15.357 16.434 ENKA Subsidiaries Abroad 81 39 1.115 1.235 TOTAL 2.038 953 18.422 21.413 16

  17. Slide 17: Engineering & Construction

    Slide 17: Engineering & Construction

    ENGINEERING & CONSTRUCTION Specifically in O&G&PC Industry, ENKA Provides Engineering, Fabrication Construction, Commissioning and Start Up Services for Major Internatioal Clients Such as; Exxon Mobil, Shell, Chevron, Lukoil etc. ENKA has also Solid Relations with Leading OEMS & Extensive Experience

  18. Slide 18: Resources

    Slide 18: Resources

    RESOURCES ENKA Owns a Construction Machinery & Equipment Fleet Comprising of 3.740 Pieces Worth of USD 314 Million; and 800.000 Square Meters of Site Facilities (Work Shops, Camps, Warehouses, Offices and etc.) Mobilized in Different Countries where Fabrication and Construction Works are Being Perfo

  19. Slide 19: Awards

    Slide 19: Awards

    AWARDS  ENKA’s 411MWe CCPP Yajva State District Power Plant EPC Project has been Awarded “The Best Project in the Power/Industrial category” in 2013 Global Best Projects Competition of ENR (Engineering News- Record)  ENKA’s Kosovo Motorway EPC Project (Sections 1,2,3 & 4a) has been Awarded “The Be

  20. Slide 20: Certificates

    Slide 20: Certificates

    CERTIFICATES ISO 9001: 2008 ISO 14001: 2004 OHSAS 18001: 2007 QUALITY MANAGEMENT SYSTEM ENVIRONMENTAL MANAGEMENT SYSTEM HEALTH & SAFETY MANAGEMENT SYSTEM ASME S ASME A ASME U ASME U2 POWER BOILERS POWER BOILER ASSEMBLIES PRESSURE VESSELS ALTERNATIVE RULES FOR PRESSURE VESSELS 20

  21. Slide 21: Certificates (Cont'd)

    Slide 21: Certificates (Cont'd)

    CERTIFICATES (Cont’d) ASME Nuclear NPT STAMP ASME Nuclear NA STAMP ASME Nuclear NS STAMP EnBW KTA 1401 's Nuclear Certificates 21

  22. Slide 22: Engineering

    Slide 22: Engineering

    ENGINEERING CONT ae cS

  23. Slide 23: Backlog as of 31.12.2014

    Slide 23: Backlog as of 31.12.2014

    BACKLOG AS OF 31.12.2014 COUNTRY (Million USD) % IRAQ 1.302 43,8 US EMBASSY PROJECTS 455 15,3 KOSOVO 330 11,1 GEORGIA 291 9,8 OMAN 200 6,8 KAZAKHSTAN 116 3,9 TURKEY 64 2,2 UNITED STATES 45 1,5 GERMANY 31 1,0 RUSSIA 26 0,9 OTHERS 111 3,7 TOTAL 2.971 100 23

  24. Slide 24: Selected Projects Under Construction

    Slide 24: Selected Projects Under Construction

    SELECTED PROJECTS UNDER CONSTRUCTION Erbil Combined Cycle Power Plant Project – Erbil, Iraq Sulaymaniyah Combined Cycle Power Plant Project – Sulaymaniyah, Iraq Dohuk Combined Cycle Power Plant Project – Dohuk, Iraq Al Najybia 4x125 MW Gas Turbine Power Plant Project – Basra, Iraq Bazian Simple Cycl

  25. Slide 25: Selected Projects: Iraq Combined Cycle Conversions

    Slide 25: Selected Projects: Iraq Combined Cycle Conversions

    SELECTED PROJECTS UNDER CONSTRUCTION Combined Cycle Power Plant Projects – Erbil, Sulaymaniyah and Dohuk, Iraq Job Owner: MGH - Mass Group Holding Ltd. Scope: To Convert its Erbil Independent Power Project (IPP) from Simple-Cycle to Combined-Cycle Technology. The Project is on an EPC basis. Erbil Ga

  26. Slide 26: Al Najybia Gas Turbine Power Plant

    Slide 26: Al Najybia Gas Turbine Power Plant

    SELECTED PROJECTS UNDER CONSTRUCTION Al Najybia 4x125 MW Gas Turbine Power Plant Project – Basra, Iraq Located in Basra, Iraq Contract Price: USD 237 Million The Project is in the Scope of “Mega Deal Projects” by Ministry of Electricity of Iraq. Engineering, Procurement, Construction, Commissioning

  27. Slide 27: Bazian Simple Cycle Power Plant

    Slide 27: Bazian Simple Cycle Power Plant

    SELECTED PROJECTS UNDER CONSTRUCTION Bazian Simple Cycle Power Plant Project Contract Price : USD 240 Million Job Owner : Qaiwan Group Location : Bazian, Sulaymaniyah – Iraq ENKA is awarded to Build the First Phase of Bazian Combined Cycle Power Plant, the Simple Cycle Portion. The Green Field Proje

  28. Slide 28: Bismayah Combined Cycle Power Plant

    Slide 28: Bismayah Combined Cycle Power Plant

    SELECTED PROJECTS UNDER CONSTRUCTION Bismayah Combined Cycle Power Plant Project – Bismayah, Iraq Contract Price : USD 555 Million Job Owner : Mass Energy Group Holding Ltd. Location : Bismayah, Baghdad – Iraq ENKA is awarded to Build the First Phase of Bismayah Combined Cycle Power Plant. The Green

  29. Slide 29: US Embassy Projects

    Slide 29: US Embassy Projects

    SELECTED PROJECTS UNDER CONSTRUCTION US Embassy Projects – Afghanistan, Dominican Republic, Papua New Guinea, Russia, Equatorial Guinea The Netherlands and Mauritania The Collaboration between ENKA and CADDELL Construction Co. of USA Started in Early 2000’s. Companies Agreed to Jointly Carry Out the

  30. Slide 30: Hani i Elezit Motorway Project, Kosovo

    Slide 30: Hani i Elezit Motorway Project, Kosovo

    SELECTED PROJECTS UNDER CONSTRUCTION Route 6 Hani i Elezit Motorway Project - Kosovo BECHTEL – ENKA General Partnership (50% - 50%) Contract Price: EUR 600 Million 60-Kilometer Motorway Linking the Capital, Pristina to Neighboring Macedonia. The New Motorway, Route 6, will Connect Kosovo with the Su

  31. Slide 31: South Caucasus Pipeline Expansion Project

    Slide 31: South Caucasus Pipeline Expansion Project

    SELECTED PROJECTS UNDER CONSTRUCTION South Caucasus Pipeline Expansion (SCPX) Project - Georgia Contract Price: USD 542 Million Contract for the Construction and Commissioning Support of the SCPX Project Facilities in Georgia has been Awarded to the BECHTEL-ENKA Joint Venture The Scope of Work Under

  32. Slide 32: Muscat International Airport Development

    Slide 32: Muscat International Airport Development

    SELECTED PROJECTS UNDER CONSTRUCTION Development of Muscat International Airport Project (MC3)– Muscat, Sultanate of Oman Consortium of BECHTEL – ENKA Joint Venture with Bahwan Engineering Company The Contract Price : USD 1,8 Billion ( ENKA’s Share = USD 702 Million ) Job Owner : The Ministry of Tra

  33. Slide 33: Berezovskaya Coal Fired Power Plant

    Slide 33: Berezovskaya Coal Fired Power Plant

    SELECTED PROJECTS UNDER CONSTRUCTION Berezovskaya Coal Fired Power Plant, Mechanical Erection Works Krasnoyarsk, Russia End Customer: OJSC “E.ON Russia” EPC Contractor: Energoproekt ENKA is the Mechanical Erection Works Contractor for the Construction of the 800 MW Berezovskaya Coal Fired Power Plan

  34. Slide 34: Crude Shipment Capacity New Tank Farm Project

    Slide 34: Crude Shipment Capacity New Tank Farm Project

    SELECTED PROJECTS UNDER CONSTRUCTION Crude Shipment Capacity New Tank Farm Project Tengiz, Kazakhstan Job Owner: Tengizchevroil Contractor: Senimdi Kurylys (Bechtel – ENKA Joint Venture with equal shares) An EPC Contract of New Crude Oil Storage Tanks, Switching Manifolds and Export pumps along with

  35. Slide 35: Real Estate

    Slide 35: Real Estate

    } site MI MU ENKA 57th YEAR

  36. Slide 36: Real Estate

    Slide 36: Real Estate

    REAL ESTATE Type Location Size (NLA) Occupancy Rate Class A Office Area Moscow 337.000 m2 93% USD 850/m2/Year Retail Area Moscow** 297.000 m2 90% USD 675/m2/Year 5 Star Hotel Moscow 235 Rooms * * * Occupancy and Rate of rooms of the Hotel may vary daily. * * 1 out of 11 Shopping Centers is located i

  37. Slide 37: Investments in Russia

    Slide 37: Investments in Russia

    INVESTMENTS IN RUSSIA 10 11 1 3 9 15 2 12 13-14 4 5 6 7 8 1: Leningradsky 2: Kuntsevo Plaza 3: Maryina Roscha 4: Kashirskoe 5: Sevastopolsky 6: Vernadskogo 7: Belyaevo 8: Podolsk 9: Orekhovo-Zuevo 1 0: Sergiev Posad 11: Pionerski (@ St. Petersburg) 12: Nab Tower 13: Paveletskaya 14: MKH 15: MOSENKA

  38. Slide 38: Real Estate

    Slide 38: Real Estate

    REAL ESTATE Year Rental Revenue Change Change (%) 2014 USD 485 Million USD 7 Million 1,5% 2013 USD 478 Million USD 36 Million 8,1% 2012 USD 442 Million USD 35 Million 8,6% 2011 USD 407 Million USD 35 Million 9,4% Year EBITDA EBITDA Margin Change Change (%) 2014 USD 337 Million 69,5% USD 9 Million 2,

  39. Slide 39: Real Estate (Some Tenants)

    Slide 39: Real Estate (Some Tenants)

    REAL ESTATE ( Some Tenants) ACCENTURE LINDE GAS BASF LINKLATERS CHANNEL MEDTRONIC CITIBANK MITSUI & CO. CLEARY GOTTLIEB NATIONAL OILWELL VARCO STEEN & HAMILTON NESTLE E.ON NINTENDO ELI LILLY ORACLE FORTUM PFIZER GENERAL ELECTRIC QUALCOMM HSBC RENAISSANCE CAPITAL IATA RICHEMONT IBM SAIPEM KPMG SBERBA

  40. Slide 40: Real Estate: Kuntsevo Multifunctional Complex

    Slide 40: Real Estate: Kuntsevo Multifunctional Complex

    REAL ESTATE Kuntsevo Multifunctional Complex Job Owner : ENKA TC (Fully Owned By ENKA) Total Investment : USD 465 Million The Existing Shopping Center which was Opened In 1997 with a Total Area of 19.400 m2 is demolished in 2012 The Complex Includes:  Shopping Center with a Net Leasable Area of 63.

  41. Slide 41: Real Estate: Sergiev Posad Shopping Center

    Slide 41: Real Estate: Sergiev Posad Shopping Center

    REAL ESTATE Sergiev Posad Shopping Center Job Owner: ENKA TC (Fully Owned By ENKA) Total Investment: USD 59 Million The Complex Includes:  Shopping Center with a Net Leasable Area of 25.000 m2  A Car Park of 723 spaces  With a Building Area of Approximately 37.000 m2 in Total Started Operation in

  42. Slide 42: Real Estate (New & Further Investment Projects)

    Slide 42: Real Estate (New & Further Investment Projects)

    REAL ESTATE (NEW & FURTHER INVESTMENT PROJECTS) Investment Projects of ENKA TC (Fully Owned By ENKA) Kashirskaya Shopping Center  Existing Shopping Center will be Demolished in 2Q, 2015  Total Investment: USD 260 Million  Total Area: 173.000 m2, Net Leasable Area: 75.000 m2 Marino Rosha Shopping

  43. Slide 43: Energy

    Slide 43: Energy

    BNJEIRGY

  44. Slide 44: Financial Overview

    Slide 44: Financial Overview

    FINANCIAL OVERVIEW Operator Ownership: 100% ENKA Debt-to-Equity Ratio: 75/25 Export Credit Agency (ECA) and OPIC Facilities Fully Covered Political and Commercial Risk is Approximately 94% Exhaustive Due Diligence Over 2 Years by ECA and OPIC No Local Currency Risk: Payments Calculated in USD and Pa

  45. Slide 45: Project Overview

    Slide 45: Project Overview

    PROJECT OVERVIEW 3 Gas-Fired Combined Cycle Power Plants (Total 3,854 MW) – Gebze 1,554 MW – Adapazarı 777 MW – Izmir 1,523 MW Annual Generation is 32 Billion kWh Net and the Annual Natural Gas Consumption is around 6.5 Billion cbm, Capability of Meeting 12% of Turkey’s Total Demand, since Turkey’s

  46. Slide 46: Project Overview (Cont'd)

    Slide 46: Project Overview (Cont'd)

    PROJECT OVERVIEW (Cont’d) BOTAŞ Turkish Pipeline Corporation, a Turkish State Entity, Supplies Natural Gas Under 16-Year-Term Contract (Will expire at the end of 2018) Turkish Undersecreteriat of Treasury Guarantees Back Obligations of TETAŞ and BOTAŞ, Very Competitive Tariffs - 4.2 Cent/kWh Average

  47. Slide 47: Project Rationale

    Slide 47: Project Rationale

    PROJECT RATIONALE Strong and Growing Projected Demand for Electricity (8% p.a. at that Time) Existing and Forecasted Energy Shortage at that Time, Improving Economic Situation in Turkey. Proximity to Main Electricity Load Centres – Will Reduce Transmission Losses from Plants in East (Near Domestic C

  48. Slide 48: Debt Funding

    Slide 48: Debt Funding

    DEBT FUNDING TOTAL COMMITTED AMOUNTS (Million USD) TOTAL DEBT (75%) 1.530 TOTAL EQUITY (25%) 510 TOTAL PROJECT COST 2.040 48

  49. Slide 49: Debt Funding

    Slide 49: Debt Funding

    DEBT FUNDING PROJECT FINANCE TOTAL US EXIM, USA 860 HERMES, GERMANY 185 OND, BELGIUM 125 OPIC, USA 300 OTHER BANKS 60 TOTAL 1.530 All Outstanding Project Finance Loans have been Fully Paid Back in 2013 49

  50. Slide 50: Overview of Project Agreements

    Slide 50: Overview of Project Agreements

    OVERVIEW OF PROJECT AGREEMENTS NATURAL GAS EPC SALES CONTRACT BECHTEL AGREEMENT BOTAŞ ENKA JV PARTS & TREASURY PROJECT SERVICES TREASURY GUARANTIES COMPANY GE AGREEMENT ENKA TETAŞ OPERATIONS SANTRAL ELECTRICITY & BAKIM SALES MAINTENANCE AGREEMENT AGREEMENT 50

  51. Slide 51: Turkey's Energy Consumption in 2014

    Slide 51: Turkey's Energy Consumption in 2014

    TURKEY’S ENERGY CONSUMPTION IN 2014 SOURCES MILLION KWH % NATURAL GAS + LNG 120.438 47,1 HYDRO 40.396 15,8 COAL 73.086 28.6 WIND, GEO & OTHERS 16.516 6.5 TOTAL PRODUCTION 250,436 98,0 IMPORT 7.805 3,1 EXPORT (2.696) (1.1) TOTAL CONSUMPTION 255,545 100,0 Source: TEIAS 51

  52. Slide 52: Turkey's Energy Demand

    Slide 52: Turkey's Energy Demand

    TURKEY’S ENERGY DEMAND 14% 250 12% 10% 200 8% 6% 150 4% 2% 100 0% -2% 95 106 114 119 128 127 133 141 150 161 175 190 198 194 210 230 242 246 255 50 -4% 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 Billion KWh Change % 52