Aura Energy Ltd · ASX:AEE

Aura Energy — Investor Presentation (May 2011)

27 slides from Aura Energy's investor presentation, May 2011

  1. Slide 1: Investor Presentation

    Investor Presentation Presented by Dr Bob Beeson sweden west africa australia May 2011

  2. Slide 2: Disclaimer & Competent Persons Statement

    Disclaimer & Competent Persons Statement o This presentation has been prepared to provide information on Aura Energy Limited’s projects. It is not intended as an offer, invitation solicitation or recommendation with respect to the purchase or sale of any securities. o This presentation should not be

  3. Slide 3: The Ever-Growing Need for Energy

    The Ever-Growing Need for Energy 3

  4. Slide 4: The Reducing Contribution of Oil

    The Reducing Contribution of Oil 4

  5. Slide 5: Demand Predictions may be Conservative

    Demand Predictions may be Conservative 5

  6. Slide 6: Corporate

    Corporate ASX Code: AEE Share Price: 29c (6 May 2011) Market capitalisation: A$38 M Cash position: $4.6 M (Mar 2011) Shares: 132.1 M Main shareholders: Board & Management 4.3% Drake Resources 4.6% Technical Investing Pty Ltd 6.8% Kinetic Investment Partners 6.9% 6

  7. Slide 7: Share Price History

    Share Price History 0.6 0.5 0.4 0.3 0.2 0.1 0

  8. Slide 8: Experienced Management Team

    Experienced Management Team Dr. Bob Beeson – Managing Director James Merrillees – Exploration Manager A professional geologist with more than 35 years A professional geologist with more than 15 years experience in mineral exploration & development. applied minerals exploration experience. Held senio

  9. Slide 9: Advanced Projects on Two Continents

    Advanced Projects on Two Continents Häggån & Kallsedet Projects, Sweden Mauritania, West Africa Niger, West Africa Wondinong, Australia 9

  10. Slide 10: What's Achieved & What's Planned

    What’s Achieved & What’s Planned 2010 o major initial resource defined at Häggån, Sweden o high uranium recoveries from initial tests at Häggån o drilling confirms uranium in greenfield Reguibat province Mauritania 2011 Jan – June o second phase of metallurgical leach tests for Häggån o resource ext

  11. Slide 11: Sweden Main Projects

    Sweden Main Projects 11 Häggån Project, Sweden

  12. Slide 12: Sweden: Mining Friendly

    Sweden: Mining Friendly o historic culture of mining o low corporate tax rate & royalties o Europe’s largest copper mine & biggest iron ore producer o legislation & regulations very supportive of mining o excellent infrastructure o nuclear power – 50% of electricity needs 12

  13. Slide 13: LARGE Resource, GIANT Uranium Field

    LARGE Resource, GIANT Uranium Field o 100% project ownership o every drill hole in 18 km2 Häggån permit intersected mineralisation o selected intercepts include: o 178m @ 175 ppm U₃O₈ o 180m @ 160 ppm U₃O₈ o 192m @ 171 ppm U₃O₈ o 226m @ 160 ppm U₃O₈ o 115m @ 188 ppm U₃O₈ 13

  14. Slide 14: Potential Co-production – Enhanced Value

    Potential Co-production – Enhanced Value o 291 million pounds U₃O₈* in Aura’s initial inferred resource with 0.81Bn tonnes @ grade – 162 ppm U₃O₈ o Plus co-products - molybdenum (361 Mlbs) - nickel (353 Mlbs) - zinc (496 Mlbs) - vanadium (2940 Mlbs) o equivalent uranium grade approx 250 - 300 ppm *

  15. Slide 15: Largest Undeveloped Uranium Resources

    Largest Undeveloped Uranium Resources Rank Project Company Mlbs Grade (%) Location 1 Viken Continental 1047 0.02 Sweden 2 Elkon ARMZ 705 0.12 Russia Rossing 3 Extract 367 0.05 Namibia South 4 Cigar Lake Cameco/Areva 352 18.2 Canada 5 Imouraren Areva 350 0.11 Niger 6 Jabiluka ERA 343 0.46 NT 7 Itatir

  16. Slide 16: Low Mining Cost

    Low Mining Cost o thick, flat-lying, continuous bodies with >200 ppm U3O8 o near-surface, low cost open-pit mining o Continental Precious Minerals scoping studies estimate: o waste to ore ratio of 0.5:1 o mining costs of approx US$2.50 -3.00/t ore 16

  17. Slide 17: High Recoveries

    High Recoveries Conventional acid leach o conventional tests give high 93% recoveries of uranium o second phase of work addressing reagent management Bio-heap leaching o Parker Centre/CSIRO initial bio-heap leach increases extraction of uranium, molybdenum, nickel & zinc o next stage testwork Leachp

  18. Slide 18: Existing Talvivaara Project in Finland Analogue

    Existing Talvivaara Project in Finland Analogue o Talvivaara, Finland uses bioleach to recover: 0.8 Mlbs pa from 17ppm U3O8 ore o recent Cameco funding and offtake agreement for U3O8 o Talvivaara, Finland modern mine based on shales Talvivaara Project, Finland o mining 24Mtpa ore (US$2.60/t) o moder

  19. Slide 19: Next Steps: Häggån

    Next Steps: Häggån o second phase of drilling on western part of project complete o assays & evaluation on the way o ongoing metallurgical testwork o scoping study 19

  20. Slide 20: West Africa Main Projects

    West Africa Main Projects Mauritania - SNIM Iron Ore Operation 20

  21. Slide 21: Strong Position in Mauritania

    Strong Position in Mauritania o long-term existing mining operations o supportive government o Aura in Mauritania o successful project identification & acquisition o greenfield discovery of significant new uranium field o 100% properties plus 2 joint venture permits o major player in field 9500 km2

  22. Slide 22: 2010 Drilling Demonstrated Potential

    2010 Drilling Demonstrated Potential o 400 holes covering 16 km² o mineralisation showed average grade of 320 ppm U3O8 o mineralisation 1-4m thick o geophysical anomalies supported exploration target of 40-60 Mlbs U3O8 at an average grade of 300 to 450 ppm U3O8* * This target is conceptual in nature

  23. Slide 23: 2011 Resource Drilling Completed

    2011 Resource Drilling Completed o 2,022 holes totalling over 9,100 metres o extensive mineralisation 1-8 m thick starting at surface o high grade results o selected intercepts o 10m @ 2000 ppm U3O8 o 4.5m @ 1863 ppm U3O8 o 2.5m @ 1859 ppm U3O8 o 2.5m @ 1787 ppm U3O8 o 3m @ 1417 ppm U3O8 o 3m @ 1312

  24. Slide 24: High Quality Resource Potential

    High Quality Resource Potential o Reguibat exploration target* very competitive on size & grade o potential grade separates Reguibat from many calcrete projects o on track to release JORC compliant resource statement in June 2011 * This target is conceptual in nature (the potential quantity and grad

  25. Slide 25: Why Invest in Aura?

    Why Invest in Aura?  on track & fully delivering on company strategy  focus on 2 key projects: Sweden & West Africa o Sweden, Häggån: expanded JORC resource – one of the world’s largest uranium resources plus multi-metal upside o Mauritania, Reguibat: excellent first assay results - JORC resource

  26. Slide 26: dUfad

    dUfad energy

  27. Slide 27: Inferred Resource Statement

    Inferred Resource Statement Häggån Cutoff Size U3O8 MoO3 V2O5 Ni Zn U3O8 ppm (BT) ppm ppm ppm ppm ppm 100 0.81 162 325 2616 318 448 Size in billions of tonnes and grades of the initial resources for the Häggån Project at 100ppm cut-off grade Aura recognises the requirement to demonstrate that the ur

Aura Energy — Investor Presentation (May 2011) on 6ix