British Land Company PLC · LSE:BLND
British Land — Corporate Update (September 2022)
23 slides from British Land's corporate update, Sep 22, 2022
Slide 1: Canada Water Masterplan: Project Update
Canada Water Masterplan: Project Update Surrey Docks Ward Meeting 22nd September 2022
Slide 2: Our presenters
Our presenters KEIR FREESTONE MILES PRICE Project Executive, Planning Director, British Land British Land SAUL COLLYNS Community Engagement Lead, British Land
Slide 3: Agenda
Agenda 1. Overview of the Masterplan 2. Planning update 3. Job opportunities & local news
Slide 4: Overview of the Masterplan
Overview of the Masterplan
Slide 5: Canada Water
ee Canada Water Qe =
Slide 6: Canada Water Today
Slide 7: Illustrative aerial view of the Masterplan
Canada Plot F1 Water Future residential tower Illustrative aerial view of the Masterplan
Slide 8: Canada Water Illustrative Scheme
Slide 9: About the development
About the development • Joint venture with Southwark Council, British Land & Australian Super • c.10 year scheme • 53 acre Masterplan • Around 3,000 homes (25% social rent, 10% intermediate homes) • 2.5m sq ft workspace for 20,000 workers (including affordable workspace) • 1.0m sq ft retail, leisure
Slide 10: Low Carbon Energy
All-electric energy approach with low temperature (ambient) heat networks. BRE Applied Innovation Credit for industry first - re-use of office waste heat to heat residential homes. Now implemented across the masterplan. First use of cement-free, Earth Friendly Low Concrete (EFCTM), in permanent pili
Slide 11: Planning update
Planning update
Slide 12: Masterplan progress – currently under construction
Masterplan progress – currently under construction Plot K1 Plot A1 Detailed Permission Outline Permission Plot A2 Dock Offices Canada Dock marketing suite
Slide 13: Next phase of development
Next phase of development Zone H (Printworks) Zone L and Printworks Street Detailed Permission RMA Submitted Outline Permission Zone F Zone G
Slide 14: The Park and Pavilion – Location within the existing site
The Park and Pavilion – Location within the existing site Canada Water Station Canada Dock The Park Surrey And Quays pavillion Shopping Centre Southwark Surrey Quays Park Leisure Park Greenland Dock Surrey Quays Station
Slide 15: The Park and Pavilion Design
The Park and Pavilion Design Within the Outline Planning Permission, the plans are to deliver: • Play spaces for a range of different age groups; • Gardens, that are engaging & encourage biodiversity and pollinators, to provide a long and varied flowering period; • A Pavilion, that could include a c
Slide 16: Approved and Submitted Reserved Matters Applications
Approved and Submitted Reserved Matters Applications Approved – Plots A1, A2, K1, L, F, H Homes – 912 (197 social rent, 64 intermediate, 651 Market) • Office space – 1.2m sq ft GEA • Retail space – 76,000 sq ft GEA • Leisure / Community – 66,000 sq ft GEA Submitted – Plot G (Pending decision) • Home
Slide 17: View of Canada Dock, new boardwalk and wetland habitat
View of Canada Dock, showing the new 170m pedestrian boardwalk and new wetland habitat (Buildings A2, and A1 in the background)
Slide 18: Job opportunities & local news
Job opportunities & local news
Slide 19: Ongoing and recent local programmes
Ongoing and recent local programmes Thrive Southwark Paper Garden Construction Skills Centre Wallball Love Summer Canada Water Market
Slide 20: Love Summer at Canada Water
Love Summer at Canada Water Terrarium workshops | 126 attendees 4 Adult Art Classes | 54 attendees 12 Kids Art Classes | 153 attendees 40 Live Music Performances and 8 DJ Sessions
Slide 21: Live job and training opportunities
Live job and training opportunities • View our website for live job & apprenticeship opportunities, or register for updates whenever new opportunities become available (team@canadawater.co.uk / 0800 470 4593 (Freephone) • Current opportunities for Southwark residents, open for applications until Nov
Slide 22: Other updates
Other updates Trees: British Land has funded 116 trees which have been planted across Surrey Docks and Rotherhithe Wards Surrey Quays Station: The car park is being reconfigured to enable TFL to start works on the new station in 2023
Slide 23: Thank you
Thank you