Turquoise Hill Resources Ltd.

Turquoise Hill Resources — Technical Presentation (November 2016)

44 slides from Turquoise Hill Resources's technical presentation, Nov 8, 2016

  1. Slide 1: Annual Oyu Tolgoi Mine Visit

    Annual Oyu Tolgoi Mine Visit November 8-10, 2016

  2. Slide 2: Forward-looking statements

    Forward-looking statements This presentation includes certain “forward-looking information” within the meaning of applicable Canadian securities legislation and “forward-looking statements” within the meaning of the “safe harbour” provisions of the United States Private Securities Litigation Reform

  3. Slide 3: Oyu Tolgoi underground mine briefing

    Annual Oyu Tolgoi Mine Visit NOVEMBER 8-10, 2016 Oyu Tolgoi underground mine briefing

  4. Slide 4: Hugo North and South Progression

    Hugo North and South Progression

  5. Slide 5: Execution

    Execution Hugo North Lift 1 (NHL1) Underground Mine Physical infrastructure Operational capability • Underground mine able to • Underground operations team produce 95ktpd. (production + ongoing • Five shafts (personnel and construction + maintenance + equipment access and technical services). ventil

  6. Slide 6: Expansion Scope

    Expansion Scope Key aspects • Development of HNL1, by panel cave mining method • High grade ore body ~2km long and 280m wide, containing 499Mt ore at 1.66% copper, 0.34g/t gold • >200km of underground lateral development • Five vertical shafts and a decline incorporating conveyor to surface • Concen

  7. Slide 7: Key underground components

    Key underground components Shaft 1 Shaft 2 Shaft 5 Shaft 3 Shaft 4 (early development (production and (ventilation) (ventilation) (ventilation) and ventilation) ventilation) Total Depth 1,385 metres 1,284 metres 1,178 metres 1,148 metres 1,149 metres Diameter 6.7 metres 10 metres 6.7 metres 10 metre

  8. Slide 8: Ore Flow

    Ore Flow APEX LEVEL Lateral Development le UNDERCUT LEVEL a= @ —> ag, — Lateral Development Undercutting Undercut Mucking & Ground Support EXTRACTION LEVEL \s/ Lateral Development Drawpoint / Drawbell Production & Ground Support Construction ag HAULAGE LEVEL Ce CG ome ame DUMP AT DUMP AT Fill Trucks

  9. Slide 9: Geotechnical

    Geotechnical • Hugo North orebody is – Highly faulted – Fair rock mass strength – Relatively high insitu (horizontal) stresses and abutment stresses • This is good for promoting caving and minimising secondary breaking • The challenge and key focus for the Oyu Tolgoi design and operating plan is aro

  10. Slide 10: Cave support

    Cave support Ground Support Major faults and strain Fair to good rockmass, High stress Major faults and weak burst prone rockmass static conditions environment rock mass ground support regime Minimum 2.4m bolt and Add mesh; cables and Add cables and Add yieldable support shotcrete strapping @1m stra

  11. Slide 11: Cave monitoring

    Cave monitoring • Cave growth and flow monitoring systems will be in place before start up of the undercut: – Seismic system – TDR and open holes – Smart/network markers – Cave Tracker • Regular surface subsidence monitoring will be carried out 11

  12. Slide 12: Cave management

    Cave management Single data repository Real-time hazard recognition CaveCad Collecting, validating, processing, analyzing Pillar stability and reporting data Standardised cave automatically 3D analysis and reporting management systems Reports HOD Convergence High Medium Low Integrated system; reduce

  13. Slide 13: Undercut

    Undercut • Undercut blasted in advance of drawpoint and drawbell excavation • Undercut face length < 350m and retreats at > 80m per year • Undercut lead/lag is 10m • Undercut face orientation + drives favourable to stress and structure Undercut 13

  14. Slide 14: Undercut

    Undercut APEX To Drilling Blasting Drill 28m 28m 17m UNDERCUT 17m EXTRACTION 28m The ‘Wide W’ has significant benefits over traditional ‘Small W’ • Improved stability • Improved operability 14

  15. Slide 15: Extraction

    Extraction Drawbell Ore Steel Set Pass Drawpoint Extraction Drift Vent IDZ Raise 10 m 28m Mine Spacing Fragmentation Drawbell Andina 26m x 13m Very Fine blast New Afton 28m x 15m Fine 12 m Oyu 28m x 15m Fine (Expected) Tolgoi 15m DOZ 30m x 18m Mid Palabora 34m x 17m Coarse 15

  16. Slide 16: Ore Handling

    Ore Handling Shaft #2 • 10m dia service and production shaft 30kt/d • 2 x 60t skips • 1,630tphr (~19hr/d) 16

  17. Slide 17: Ore Handling

    Ore Handling Conveyor to Surface • 3 x 2.2km legs • 1,600mm wide belt @ 6m/s • 6,500 tphr • 2 x 6 MW gearless drives each leg • Commission six months before 30kt/d 30kt/d 95kt/d 17

  18. Slide 18: Oyu Tolgoi open-pit operations

    Annual Oyu Tolgoi Mine Visit NOVEMBER 8-10, 2016 Oyu Tolgoi open-pit operations Steve Jones Acting CEO, Oyu Tolgoi

  19. Slide 19: Production achievements

    Production achievements All injury frequency rate Total material mined (per 200,000 hours worked) ('000 tonnes) 27% 2015 vs. 2013 72% 2016 YTD vs. 2013 91,771 0.47 0.43 76,919 72,032 71,322 0.33 0.12 2013 2014 2015 2016 YTD 2013 2014 2015 2016 YTD Industry-leading safety performance Strong haul tr

  20. Slide 20: Oyu Tolgoi's Q3'16 cost curve position

    Oyu Tolgoi’s Q3’16 cost curve position 2016 copper mine C1+royalties+sustaining normal cost curve C/lb, 2016$ 400 Q1 Q2 Q3 Q4 300 Oyu Tolgoi Other Mines 200 100 0 kt 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 Cumulative production (‘000 tonnes) -100 Source: Wood Mackenzie (Q3’16 Co

  21. Slide 21: Managing current ore grade challenges

    Managing current ore grade challenges  Open pit Phase 1 finished and Phases 2 and 3 nearly complete  Lower-grade Phase 6 and stockpile ore processed from mid-2016 to mid-2018  Waste movement from Phase 4 critical to uncover medium-grade ore in 2017, then higher-grade ore beginning in mid-2018 201

  22. Slide 22: Continued focus on reducing cash costs

    Continued focus on reducing cash costs • Business improvement programs have been in place since 2014 delivering value across productivity, operating costs, sustaining capex and working capital. • The program values one-off savings, sustaining capital reductions and net working capital (NWC) reductio

  23. Slide 23: Oyu Tolgoi underground development

    Annual Oyu Tolgoi Mine Visit NOVEMBER 8-10, 2016 Oyu Tolgoi underground development Marco Pires Chief Development Officer Oyu Tolgoi Underground

  24. Slide 24: Unlocking value through underground project

    Unlocking value through underground project  First drawbell production expected in mid-2020 with full ramp-up by 2027  Average of 560,000 tonnes of copper from open pit and underground 2025- 20301  First quartile, low-cost operation 1. 2016 Oyu Tolgoi Technical Report 24

  25. Slide 25: Oyu Tolgoi underground a Tier 1 asset

    Oyu Tolgoi underground a Tier 1 asset 2025 copper mine C1+royalties+sustaining normal cost curve C/lb, 2016$ 400 Q1 Q2 Q3 Q4 300 Oyu Tolgoi Other Mines 200 100 0 kt 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 Cumulative production (‘000 tonnes) -100 Source: Wood Mackenzie (Q3’16 Cos

  26. Slide 26: Panel block cave development

    Panel block cave development  Highly productive mass mining method with low operating costs. Substantial upfront investment and lower operating costs make block caving suitable for larger deposits.  Resource recovery is effective as the low operating costs support economic extraction of a lower sh

  27. Slide 27: Robust mine design

    Robust mine design  Footprint size 2,000m x 280m and 1,300m below surface  203km tunnel, 137,000m3 mass excavation  Five shafts (three air intake and two exhaust)  Advance undercut, wide “W” profile with anti-socket drive, 567,000m2  2,231 drawpoints (El Teniente layout), 28m x 15m spacing, cen

  28. Slide 28: Complete ramp-up expected by 2027

    Complete ramp-up expected by 2027 Sustainable underground production Complete convey to surface Project 1st draw Complete concentrator Complete re-start bell firing upgrade ramp-up 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Pre-start Excavation (lateral / mass / vertical) Excav

  29. Slide 29: Key underground components

    Key underground components Shaft 1 Shaft 2 Shaft 5 Shaft 3 Shaft 4 (early development (production and (ventilation) (ventilation) (ventilation) and ventilation) ventilation) Total Depth 1,385 metres 1,284 metres 1,178 metres 1,148 metres 1,149 metres Diameter 6.7 metres 10 metres 6.7 metres 10 metre

  30. Slide 30: Processing plant upgrade

    Processing plant upgrade Concentrate from Hugo North Lift 1 ore  Higher copper grade  Higher recovery  Chalcopyrite/bornite Plant upgrade  Addition of 5th ball mill  Additional flotation line  Additional concentrate filtering and bagging capacity  Plant capacity of 40 million tonnes per year

  31. Slide 31: Approved underground CAPEX

    Approved underground CAPEX $1.3 $1.2 $1.2 $1.0 $0.8 $0.5 $0.5 $0.3 $0.4 $0.4 $0.4 $0.3  Underground expansion capital, VAT and escalation of $5.3 billion  Underground sustaining capital, VAT and escalation of $2.8 billion to full ramp-up expected in 2027 31

  32. Slide 32: Underground contracts awarded to date

    Underground contracts awarded to date Key Contracts Awarded Supplier Key contracts split Description Group Contractor EPCM Onshore National Jacobs EPCM Offshore International Jacobs Boxcut and Decline National Theiss Khishig (C2S) Arvin JV Explosives Supply and National Maxam National Services Explo

  33. Slide 33: Strong project momentum

    Strong project momentum Currently  Workforce ~1,600  Major contracts fully mobilized  Lateral development occurring as planned  Boxcut well advanced  Steady progress of sinking Shafts 2 and 5 Expected by 2017  Workforce of ~2,400  Dual decline commenced Decline box cut Left: belt conveyor ram

  34. Slide 34: Oyu Tolgoi's long-term potential

    Annual Oyu Tolgoi Mine Visit NOVEMBER 8-10, 2016 Oyu Tolgoi’s long-term potential Jeff Tygesen, Chief Executive Officer Steeve Thibeault, Chief Financial Officer Brendan Lane, Vice President Operations and Development

  35. Slide 35: Achievements 2015-2016

    Achievements 2015-2016 1 May 2015 – Underground Development Plan approved 2 August 2015 – Underground pre-start activities begin 3 December 2015 – Project finance facility signed 4 May 2016 – Notice to proceed and 2016 Feasibility Study approved 5 June 2016 – Drawdown of project finance facility 6 A

  36. Slide 36: Long-term copper fundamentals strong

    Long-term copper fundamentals strong Copper mine supply/demand outlook (Mt)  Copper market likely to be in balance in 2017. Base Highly Probable Primary Demand 30  Ongoing attrition at existing Forecast mines driven by declining 25 grade 20  Continued demand growth requires new capacity in the 15

  37. Slide 37: 2016 Reserves Case

    2016 Reserves Case  Concentrator capacity 40mtpa, 10% above nameplate capacity 2016 Reserves Case Mining Areas  Open pit utilized to top-up concentrator  Underground ramp-up to full production (~33mtpa) expected 2020-2027  Highest grade ore mined first – initial underground copper grades expecte

  38. Slide 38: Alternative Production Cases

    Alternative Production Cases Plant 38

  39. Slide 39: 2016 Resources Case

    2016 Resources Case 2016 Resources Case Processing Production  Assumes concentrator capacity of 40mtpa for life  Base Case NPV8% $8.37 billion1  Expansion capital costs $9.73 billion2 Plant 1. Base case NPV8% assumes $3.00/lb copper and $1,300/oz gold 2. Expansion capital costs inclusive of 2016

  40. Slide 40: Resources 50 Case

    Resources 50 Case Resources 50 Case Processing Production  Concentrator creep from 40mtpa to 50mtpa with little capital  Assumes 5% improvement in concentrator capacity per year for five years  Base case NPV8% $9.32 billion1  Expansion capital costs $9.73 billion2 Plant 1. Base case NPV8% assume

  41. Slide 41: Resources 100 Case

    Resources 100 Case Resources 100 Case Processing Production  Assumes ~Year 20, concentrator expanded to 100mtpa  Base Case NPV8% $8.88 billion1  Expansion capital costs $13.47 billion2 Plant 1. Base case NPV8% assumes $3.00/lb copper and $1,300/oz gold 2. Expansion capital costs inclusive of 2016

  42. Slide 42: Resources 120 Case

    Resources 120 Case Resources 120 Case Processing Production  Assumes ~Year 20, concentrator expanded to 120mtpa  Base Case NPV8% $8.80 billion1  Expansion capital costs $14.86 billion2 Plant 1. Base case NPV8% assumes $3.00/lb copper and $1,300/oz gold 2. Expansion capital costs inclusive of 2016

  43. Slide 43: Cost sensitivity options

    Cost sensitivity options 1 Underground construction capital reduced by 30% 2 Operating costs reduced by 15% 3 G&A costs assumed to reach long-term average cost of $50 million from Year 7 4 Rail freight available to project after 2020 and concentrate freight cost is reduced to $25 per tonne 43

  44. Slide 44: Oyu Tolgoi– a long-term growth opportunity

    Oyu Tolgoi– a long-term growth opportunity  Open pit performing as expected in low gold areas  Demonstrated productivity and cost improvements  Underground development progressing  Long-term development optionality and plant expansion opportunities  Oyu Tolgoi best copper asset in development t

Turquoise Hill Resources — Technical Presentation (November 2016) on 6ix