Firering Strategic Minerals Plc · LSE:FRG

Firering Strategic Minerals — Investor Presentation (April 2026)

14 slides from Firering Strategic Minerals's investor presentation, April 2026

  1. Slide 1: Scaling a Strategic Lime Platform in Southern Africa

    Scaling a Strategic Lime Platform in Southern Africa Q2 2026 AIM: FRG

  2. Slide 2: Disclaimer

    Disclaimer This presentation (“Presentation”) is being provided to you (the “Recipient”) by Firering Strategic Minerals PLC (the “Company”) for information purposes only and does not constitute or form part of, and should not be construed as, an offer or invitation to sell or any solicitation of any

  3. Slide 3: Snapshot

    SNAPSHOT Operating asset. Tier one resource. Visible scale up. AIM quoted resource company with a LONGEVITY LEVERAGE revenue generating lime production platform in Zambia (36.2% interest with 50+ year potential mine life from a Tier Installed plant with an 800 tpd design option to increase to 45%) 1

  4. Slide 4: Market Opportunity & Supply Demand Dynamics

    MARKET OPPORTUNITY & SUPPLY DEMAND DYNAMICS One deposit. Multiple products. Diversified markets. QUICKLIME HYDRATED LIME AGGREGATE & CaO + 90% Ca(OH)₂ HIGH-PURITY CALCIUM CARBONATE • Copper flotation and smelting • Water and wastewater treatment • Infrastructure and road building • Gold leaching • E

  5. Slide 5: Strategic Location

    STRATEGIC LOCATION Close to customers. Lower carbon footprint. • Located in the heart of Southern Africa, 22 km west of Lusaka • Direct access to the Central African Copperbelt, regional mining hubs and established trade corridors • Immediate proximity to major smelters and processing plants, suppor

  6. Slide 6: Tier One Resource Base

    TIER ONE RESOURCE BASE Scale. Longevity. Optionality. Representation of the pit shell; the lime plant can be seen in the upper right corner • 145.2Mt JORC compliant Mineral Resource: (Earthlab, November 2024) • 11.8Mt Measured • 55.4Mt Indicated • 78.0Mt Inferred • 50+ year production potential • Ne

  7. Slide 7: Infrastructure Platform

    INFRASTRUCTURE PLATFORM Over $100m historical investment Kiln Feed Crushing Circuit Lime Plant Laboratory Kiln 1 feedstock is drawn from a Two stage 300tph crushing circuit 8 vertical kilns for burning crushed On-site laboratory; CaO sample purity stockpile - mining of the limestone comprising a jaw

  8. Slide 8: Production Ramp Up Plan

    PRODUCTION RAMP UP PLAN Disciplined, phased expansion to reduce execution risk CURRENT OPERATIONS NEXT PHASE FULL PRODUCTION POTENTIAL • Kiln 1 operating at c.55 tpd • Commission Kilns 3 & 4 in Q3 & Q4, respectively • Up to 800 tpd across eight kilns • Kiln 2 operating at +70tpd with optimisation •

  9. Slide 9: Revenue Profile

    REVENUE PROFILE From restart to cash generative growth. Limeco operates with a largely fixed cost base, so bringing additional kilns online increases volumes at strong incremental margins, driving disproportionate profit growth as capacity ramps up. Product mix flexibility enables Limeco to respond

  10. Slide 10: Portfolio Optionality: Atex, Côte d'Ivoire

    PORTFOLIO OPTIONALITY: ATEX, CÔTE D’IVOIRE Long term critical minerals upside. • 90% interest in Atex within the highly prospective Baoulé-Moss domain of the West African Craton • A well-established mineral province hosting significant gold and lithium-bearing pegmatite systems • Positioned to benef

  11. Slide 11: Investment Case

    INVESTMENT CASE Clear operational milestones. Visible value inflection points. • Revenue-generating industrial minerals platform at the centre of Southern Africa’s copper corridor • Tier one limestone resource with 50+ year life, securing long-term scale and supply • 800 tonnes per day processing pl

  12. Slide 12: Board & Key Team

    BOARD & KEY TEAM Proven in-country experience in project development, finance & sustainability Youval Rasin Shai Kol Vassilios Carellas Rémy Welschinger Yuval Cohen Non-Executive Chairman & CFO Non-Executive Director Non-Executive Director MD OF LIMECO Interim CEO Over 15 years of experience in Co-f

  13. Slide 13: Key Data at April 2026

    KEY DATA AT 24 April 2026 Delivering growth. Unlocking value. SNAPSHOT KEY SHAREHOLDERS LIMECO TRANSACTION Market Cap £4m % of Issued Share • Current FRG interest: 36.2% Shareholder Capital • Option to increase to 45%, exercisable in Share Price 1p Premier Miton Group Plc 14.30% two additional tranc

  14. Slide 14: Contact

    Vassilios Carellas - vc@fireringplc.com www.fireringplc.com @FireRing_SM Financial PR, St Brides Partners Ltd: firering@stbridespartners.co.uk