Tellurian Inc

Tellurian — Investor Presentation (September 2017)

21 slides from Tellurian's investor presentation, Sep 27, 2017

  1. Slide 1: Corporate presentation September 2017

    Corporate presentation September 2017 1

  2. Slide 2: Cautionary statements

    Cautionary statements Forward looking statements The information in this presentation includes “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. All statements other than state

  3. Slide 3: Building a low-cost global natural gas business

    Building a low-cost global natural gas business 2016 February Charif Souki and Martin Houston establish Tellurian $60 million April Management, friends and family invest $60 million August Meg Gentle joins to lead the company as President & CEO $25 million December GE invests $25 million in Telluria

  4. Slide 4: The global LNG market is in transition

    The global LNG market is in transition Steady demand growth from non-traditional markets Increasingly flexible commercial structures Revocation of destination restrictions Emerging LNG price indices Growing gas-on-gas competition Artist rendition 4 Global LNG

  5. Slide 5: Daily supply readily available across the globe

    Daily supply readily available across the globe 18 cargoes loaded every day in 2020 to satisfy 50 Bcf/d of demand # of Atlantic Basin cargoes /day 7 3 2016 2020 # of Pacific Basin cargoes /day 7 5 2016 2020 # of Middle East cargoes /day Source: Wood Mackenzie Note: Average cargo size c. 2.9 Bcf, ass

  6. Slide 6: Global LNG on the water

    Global LNG on the water # of ships Gas storage on LNG vessels Storage (Bcf) 700 1,000 600 800 500 400 600 300 400 200 100 200 - - 2016 2020 # ships Total storage on water LNG Storage—2017 Japan + Korea terminals: 633 Bcf LNG vessels: 686 Bcf Legend LNG carrier – laden LNG carrier – unladen Sources:

  7. Slide 7: New liquefaction capacity required

    New liquefaction capacity required Accelerated demand growth driven by low LNG prices LNG demand growth (1) 2017 effective capacity(4) utilization >98% LNG capacity utilization (2) Price convergence Emerging indices provide forward transparency Netback prices to the Gulf Coast (3) Netback to Europe

  8. Slide 8: Building a low-cost global gas business

    Building a low-cost globalgas business Upstream PipelineLiquefactionMarketing Purchase low-cost gas at liquidity points or as reserves Diversify gas supply Develop pipeline solutions for constrained production basins Maximize access to supply liquidity Develop low-cost liquefaction Less than $600 pe

  9. Slide 9: New business model

    New business model Tellurian will offer equity interest in Driftwood Holdings Driftwood Holdings will consist of Tellurian Production, Driftwood pipeline and Driftwood LNG terminal (~27.6 mtpa) Equity will cost ~$1,500 per tonne Investors will receive equity LNG at tailgate of Driftwood LNG terminal

  10. Slide 10: Potential margin capture from new business model

    Potential margin capture from new business model $/mmBtu $2.25/mmBtu Full cycle cost of gas delivered to market $0.75/mmBtu Cost through the LNG plant $3/mmBtu Cost of LNG FOB U.S. GC before equity return $4.50 – 18/ mmBtu Range of GC netbacks Oct GCM 22nd Sept 2017: $6.60/mmBtu $1.50 – 15/ mmBtu Ra

  11. Slide 11: Financials: Key Assumptions

    Financials Key Assumptions Liquefaction capacity ~27.6 mtpa Tellurian retained capacity ~7—11 mtpa Realized price (FOB – Platts Gulf Coast $6.60/mmBtu Marker) Delivered gas cost(Gulf Coast) $3.00/mmBtu Margin $3.60/mmBtu 2027 Tellurian equity cash flow ($ millions) Tellurian Equity LNG Netback price

  12. Slide 12: Tellurian Production objectives

    Tellurian Production objectives Experienced upstream team joined in May 2017 Acquire and develop long life, low-cost natural gas resources Low geological risk Scalable position Production of 1.5 Bcf/d starting in 2022 Total resources of ~15 Tcf Operatorship Low operating costs Flexible development t

  13. Slide 13: Haynesville acquisition

    Haynesville acquisition Tellurian signed a PSA with a private seller to purchase 9,200 net acres in the Haynesville shale for $85.1 million Haynesville acreage provides low development risk, favorable economics and close proximity to significant demand growth Target is to deliver gas for $2.25/mmBtu

  14. Slide 14: Haynesville type curve comparison

    Haynesville type curve comparison Comparative type curve statistics Tellurian Peer A Peer BPeer CPeer D Type curve detail NLANLA core / De Soto / North blended Area De SotoDe Soto Red River Louisiana development core program Completion (lbs. / ft.) - 4,0003,8002,7003,000 Single well stats Lateral le

  15. Slide 15: Driftwood LNG terminal and pipeline

    Driftwood LNG terminal and pipeline Driftwood LNG terminal Land Capacity Trains Storage Marine Capex Driftwood pipeline Size Capacity Capex Artist rendition ~1,000 acres near Lake Charles, LA ~27.6 mtpa(1) Up to 20 trains of ~1.38 mtpa each Chart heat exchangers GE LM6000 PF+ compressors 3 storage t

  16. Slide 16: Low-cost liquefaction

    Low-cost liquefaction The cost of Gulf Coast greenfield LNG projects are amongst the lowest quartile projects globally New project Expansion(2) Legacy regas Capacity Cost $/tonne(1) $2,500 $2,000 $1,500 $1,000 $500 $- ~27.6 mtpa capacity Capacity mtpa 30 25 20 15 10 5 Sources: Wood Mackenzie (Q4 201

  17. Slide 17: LNG Marketing

    LNG Marketing Plan to enter LNG Marketing business in 2017 Expect initial participation in LNG trade through short-term charter arrangements Continue build out of risk management and operational capabilities 17 LNG Marketing

  18. Slide 18: Conclusions

    Conclusions Tellurian’s integrated model to deliver low cost LNG globally LNG demand is growing at 12% per annum The U.S. is best positioned to meet these supply needs with access to abundant low-cost gas and a track record of building low-cost liquefaction Netback LNG prices to the U.S. Gulf Coast

  19. Slide 19: Artist's rendition of Driftwood LNG

    Artist’s rendition of Driftwood LNG 19 Artist’s rendition

  20. Slide 20: Contact us

    Contact us Amit Marwaha Director, Investor Relations & Finance +1 832 485 2004 amit.marwaha@tellurianinc.com Joi Lecznar SVP, Public Affairs & Communication +1 832 962 4044 joi.lecznar@tellurianinc.com @TellurianLNG 20 Contacts

  21. Slide 21: Thank you

    Thank you

Tellurian — Investor Presentation (September 2017) on 6ix