Sterling Metals Corp. · TSXV:SAG
Sterling Metals — Investor Presentation (January 2026)
22 slides from Sterling Metals's investor presentation, January 2026
Slide 1: Unlocking Canada's Copper Potential
CORPORATE PRESENTATION – JANUARY 2026 TSXV: SAG | OTCQB: SAGGF UNLOCKING CANADA’S COPPER POTENTIAL TSXV: SAG | OTCQB: SAGGF | STERLINGMETALS.CA
Slide 2: Disclaimer
DISCLAIMER Cautionary Note Regarding Forward-looking Information Market and Industry Data (continued) This presentation is intended to be strictly informational. Sterling Metals Corp. (“Sterling Metals” or the References in this presentation to reports and publications should not be construed as dep
Slide 3: Canada's Copper Moment
CANADA’S COPPER MOMENT A DOMESTIC NEED FOR THE MOST CRITICAL METAL CANADA & ONTARIO PRESENT A UNIQUE WORLD RESERVES OF COPPER BY COUNTRY (2023) 2 OPPORTUNITY FOR FAST TRACKING CRITICAL METALS PROJECTS Canada’s critical mineral infrastructure counts toward NATO Unlocking a made in Ontario Critical Su
Slide 4: Proven Team
PROVEN TEAM PURSURING TIER-ONE COPPER DISCOVERIES IN CANADA BOARD OF DIRECTORS AND ADVISORS MANAGEMENT Mark Goodman Stephen Keith Mathew Wilson Dr. Neil O’Brien Chairman Director CEO and Director Chief Geologist Richard Patricio Mark Raguz Jeremy Niemi Dennis Logan Advisor Advisor SVP Exploration an
Slide 5: Soo Copper Project: Scale – Midcontinent Rift
SCALE SOO COPPER PROJECT MIDCONTINENT RIFT: +150 YEARS OF COPPER PRODUCTION Marathon (PGM-Cu) SOO COPPER PROJECT* - Isle Royale (Cu) Historical resources Nokomis (Ni-Cu-PGM) spanning 30km4 Duluth Complex (Cu-Ni-Co-PGM) -4,400Mt @ -0.6% Cu Historical production of 7.6Mt at 1.97%Cu5 Tamarack 34.9m – 5
Slide 6: Soo Copper Project: Fractured Ownership and Opportunity for Discovery
SCALE SOO COPPER PROJECT FRACTURED OWNERSHIP AND LIMITED SYSTEMATIC WORK BRINGS OPPORTUNITY FOR DISCOVERY Tribag Mine 6.5Mt @ 2.75% Cu** 262.5m @ 1.05% CuEq in 6th hole Copper Corp Mine by Sterling Metals* 1.1Mt @ 1.2% Cu** * See press release dated September 29, 2025 at www.sterlingmetals.ca **Inde
Slide 7: Soo Copper Project: Production, Drilling and Soils Suggest Scale
SCALE SOO COPPER PROJECT PRODUCTION, DRILLING AND SOILS SUGGESTS SCALE • Historic Porphyry discovered in 1960s within area of focus - no modern and systematic exploration to date despite shallow 20Mt 0.19% Cu and 0.05% Mo historic resource* • Four phases of copper across 30km copper system associate
Slide 8: Soo Copper Project: Discovery Hole Changes the Trajectory
GRADE SOO COPPER PROJECT DISCOVERY HOLE CHANGES THE TRAJECTORY OF THE SOO COPPER PROJECT 262.5m of 1.05% CuEq starting from 47.5m downhole, including a new 68.3m thick bornite zone grading 3.25% CuEq starting at 179.7m downhole, featuring semi- massive bornite and chalcopyrite grading up to 9.3m of
Slide 9: MEPS Discovery – Highest Copper and Gold Grades to Date
GRADE SOO COPPER PROJECT MEPS DISCOVERY – HIGHEST COPPER AND GOLD GRADES TO DATE Close association of the high tenor and high-grade copper mineralization with GFP porphyry, present as strongly potassic altered and multiply veined aplitic dykes that were discovered in phase one drilling in April. No
Slide 10: MEPS Discovery – Highest Copper and Gold Grades to Date
GRADE SOO COPPER PROJECT MEPS DISCOVERY – HIGHEST COPPER AND GOLD GRADES TO DATE Characterized by bornite and associated porphyry dykes, indicates a robust, large-scale Cu-Au-Ag-Mo system with the potential to transform the Project. Bornite, chalcopyrite and gold mineralization in Bornite-chalcopyri
Slide 11: Developing a Higher Grade Bornite Core Within Copper Zone
GRADE SOO COPPER PROJECT DEVELOPING A HIGHER GRADE BORNITE CORE WITHIN A CONTINUOUSLY COPPER MINERALIZED ZONE OPEN IN ALL DIRECTIONS 1. As reported in Sterling Metals press release dated September 29, 2025 2. As reported in Sterling Metals press release dated January 15, 2026 TSXV: SAG | OTCQB: SAGG
Slide 12: MEPS Expansion – High-Grade Copper Intercepts
GRADE SOO COPPER PROJECT MEPS EXPANSION – HIGH-GRADE COPPER INTERCEPTS CONSISTENT WITH DISCOVERY HOLE Bornite and chalcopyrite mineralization in MEPS- Massive chalcopyrite mineralization in MEPS-25-11 25-12 at 348.2m grading 8.2% Cu, 4.86 gpt Au, 71.4 at 349.55m grading 13.1% Cu, 0.2 gpt Au, 22 gpt
Slide 13: Large Untested Area of Near-Surface Potential
SCALE AND GRADE SOO COPPER PROJECT LARGE UNTESTED AREA OF NEAR-SURFACE POTENTIAL OPENING UP TO THE SOUTH MEPS-25-01 expanded the footprint of copper mineralization by approximately 300m to the south, opening up a large untested area of near-surface potential while also intersecting a higher grade 10
Slide 14: New Potential Centers Across 2km Target Area Within 6km Corridor
SCALE AND GRADE SOO COPPER PROJECT NEW POTENTIAL CENTERS IDENTIFIED ACROSS A 2KM TARGET AREA WITHIN 6KM COPPER CORRIDOR • 1,323 new soil samples uncovered 122 new copper samples across 6km (Sample assays pending). • At the Gimlet Target Area, 93 copper-bearing samples including 38 containing bornite
Slide 15: Major Cost Advantages Due to Logging Road Access
INFRASTRUCTURE SOO COPPER PROJECT MAJOR COST ADVANTAGES DUE TO LOGGING ROAD ACCESS INFRASTRUCTURE AND ACCESS DIRECT ACCESS FROM TRANS-CANADA HIGHWAY TSXV: SAG | OTCQB: SAGGF | STERLINGMETALS.CA 15
Slide 16: Company Snapshot
TEAM COMPANY SNAPSHOT Share Price (Jan 14, 2026) C$1.84 $3.00 2,500,000 52-Week Low/High C$0.24 – C$3.06 Volume Price Close Basic Shares Outstanding1 45.9M $2.50 2,000,000 Options2 1.9M $2.00 Warrants3 8.8M 1,500,000 $1.50 RSUs 1.3M 1,000,000 FD Shares Outstanding 58.0M $1.00 Basic Market Capitaliza
Slide 17: Contact Us
TSXV: SAG CONTACT US 416-643-3889 info@sterlingmetals.ca @sterlingmetals www.sterlingmetals.ca TSXV: SAG | OTCQB: SAGGF | STERLINGMETALS.CA
Slide 18: Appendix
APPENDIX TSXV: SAG | OTCQB: SAGGF | STERLINGMETALS.CA 18
Slide 19: Appendix 1: Asset Parameters
APPENDIX 1: ASSET PARAMETERS THE KEY COMPENTS OF A TIER-ONE COPPER PROJECT SCALE Big geology and giant mineral systems GRADE Historical high grades in production and drill holes INFRASTRUCTURE Power, roads, rail, accessibility and workforce JURISDICTION Fast tracking critical metals and top 10 Frase
Slide 20: Appendix 2: Adeline Project, Labrador
APPENDIX 2: ADELINE PROJECT, LABRADOR NEW FRONTIER – ONE OF THE ONLY PROTEROZOIC BASINS IN THE WORLD THAT HASN’T BEEN SYSTEMATICALLY EXPLORED • CMB is a globally significant Cu-U province located at a triple junction between three geological terranes ADELINE PROJECT • 260km long belt endowed with hi
Slide 21: Appendix 3: Adeline Project, Labrador
APPENDIX 3: ADELINE PROJECT, LABRADOR NEWLY STAKED CLAIMS UNDERSCORES PROSPECTIVITY OF THE SEAL LAKE BASIN Staked by Viridian Metals (~$30 market cap) following its selection for the BHP Xplor program in January 20251 2,600 km² 70 copper showings Sterling Metals (~$11m market cap) 44km 297 km² 250 c
Slide 22: Appendix 4: Adeline Project, Labrador
APPENDIX 4: ADELINE PROJECT, LABRADOR DRILLING AND SAMPLING SHOWS DEMONSTRATED POTENTIAL FOR FUTURE DISCOVERIES 44 km • Adeline Formation and Salmon Lake DDH WHS-23-011 DDH K-3 2.1m @ 1.2% Cu, 16.43 g/t Ag Formation are targets for copper DDH SL-11-10 1m @ 1.32% Cu, 1 g/t Ag 7.9 m @ 1.76% Cu, 56.2 g
Sterling Metals — Investor Presentation (January 2026) on 6ix