Singapore Exchange Ltd. · SGX:S68
Singapore Exchange — Saizen REIT — Investor Presentation (March 2009)
7 slides from Singapore Exchange's investor presentation, Mar 16, 2009
Slide 1: Update on Rights cum Warrants Issue
www.saizenreit.com.sg Presentation - Update on Rights cum Warrants Issue 16 March 2009 Prepared by Japan Residential Assets Manager Limited (Manager of Saizen REIT)
Slide 2: Disclaimer
Disclaimer • This presentation has been prepared by Japan Residential Assets Manager Limited (the “Manager”) as manager of Saizen Real Estate Investment Trust ((“Saizen Saizen REIT”) REIT ) in connection with the proposed renouncement non non-underwritten underwritten rights issue of new units with
Slide 3: Summary of the Rights cum Warrants Issue
Summary y of the Rights g cum Warrants Issue Issue Renounceable non-underwritten rights issue with free 3-year warrants S Structure ¾ 11 rights i ht units it for f every 10 existing i ti units it ¾ 1 free warrant for every rights subscribed for ¾ Up to 497,185,362 rights units and up to 497,185,362
Slide 4: Reasons for the Rights cum Warrants Issue
Reasons for the Rights g cum Warrants Issue ¾ Increase the equity capital base of Saizen REIT to facilitate the refinancing of CMBS loans ¾ Rights issue is fairest means of equity fund raising ¾ Aim to protect value of Saizen REIT’s assets from CMBS loans refinancing risk ¾ Ensures survival even if
Slide 5: Current Development
Current Development p ¾ Credit markets have further deteriorated since beginning of year ¾ Financial adviser appointed to assist in syndicated loan financing for a major portfolio ¾ Securing short-term bridging facilities to repay smaller CMBS loans with the aim to unencumbering properties ¾ Seeking
Slide 6: Benefits of the Rights cum Warrants Issue
Benefits of the Rights cum Warrants Issue ¾ With (i) proceeds from Rights cum Warrants Issue; (ii) cash cash-on-hand; on hand; (iii) operational cash flow conserved; and (iv) short term bridging facilities (not more than S$10 million), Saizen REIT is expected to fully repay five out of six CMBS loan
Slide 7: Progress of Rights cum Warrants Issue
Progress of Rights cum Warrants Issue ¾ Regulatory approval in progress ¾ Circular expected p to be despatched p byy end March 2009 ¾ Unitholders’ meetingg expected p in mid April p 2009 ¾ Rights g cum Warrants Issue to commence in end April/ p earlyy Mayy 2009 7