Eversource Energy (d/b/a) · NYSE:ES

Eversource Energy (d/b/a) — Eversource Energy — Corporate Update (April 2024)

18 slides from Eversource Energy (d/b/a)'s corporate update, Apr 11, 2024

  1. Slide 1: Distributed Energy Resource (DER) Marion-Fairhaven Group Open House

    Welcome to the Distributed Energy Resource (DER) Marion-Fairhaven Group Open House April 11, 2024 | 5:00 to 7:00 PM Mattapoisett Fire Department 62 County Road Mattapoisett, MA Safety First and Always

  2. Slide 2: DER Marion-Fairhaven Group Virtual Webinar

    Welcome to the Distributed Energy Resource (DER) Marion-Fairhaven Group Virtual Webinar April 16, 2024 | 12:00 to 1:00 PM Safety First and Always

  3. Slide 3: DER Marion-Fairhaven Group Open House

    Welcome to the Distributed Energy Resource (DER) Marion-Fairhaven Group Open House April 18, 2024 | 5:00 to 6:30 PM American Legion Post 265 71 Hope Street Acushnet, MA Safety First and Always

  4. Slide 4: Clean Energy Strategy

    ▪ Connecting a growing number of new, clean sources of energy Prepare the Grid ▪ Adapting for changing power flows (DERs) for the Future ▪ Meeting increased demand from electrification ▪ Strengthening resiliency & reliability ▪ Solar Support ▪ Offshore wind Development ▪ Battery storage Clean Energy

  5. Slide 5: Who We Are

    Who We Are New Hampshire: 510,000 electric in 211 We're New England’s largest communities, 9,500 water in three energy delivery company with communities. 4 million customers across 525 communities in Connecticut, Massachusetts and New Massachusetts: 1.4 million Hampshire. electric in 140 communities

  6. Slide 6: The Electric Grid

    The Electric Grid ▪ Utility-scale generation is interconnected across New England and even across the country by way of high-voltage transmission lines. ▪ All of these lines networked together create a type of superhighway that moves electricity from the power plants to electric substations and loca

  7. Slide 7: What is Transmission?

    What is Transmission? ▪ High-voltage electric system that delivers power over long distances from where it’s generated to where it’s consumed ▪ Substations lower the voltage so that the electricity can be distributed safely to commercial and residential customers ▪ Eversource owns and operates 49% o

  8. Slide 8: Benefits of Transmission

    Benefits of Transmission ▪ Investments are addressing pockets of load growth and improving reliability ▪ Aging infrastructure replacements are improving storm resiliency ▪ Significant progress towards greater integration of clean energy resources ▪ Enables electrification of the transportation and h

  9. Slide 9: Enabling Increased Distributed Generation in the Greater Marion Area

    Enabling Increased Distributed Generation in the Greater Marion Area Over the past several years, there has been a dramatic increase in the number of distributed generation facilities (DGF), primarily solar and battery storage, seeking interconnections to the electric grid in Southeastern and Wester

  10. Slide 10: DER Marion-Fairhaven Project Details

    DER Marion-Fairhaven Project Details The integration of additional clean energy into the electrical grid requires the installation of new distribution and transmission lines within existing Rights of Way (ROW) and upgrades to existing substations*. • Crystal Spring Substation- 26R Crystal Spring Roa

  11. Slide 11: Crystal Spring Substation Map

    DER Marion-Fairhaven Group: Crystal Spring Substation Map Wing Lane Substation Safety First and Always

  12. Slide 12: Line 112 Extension Map

    DER Marion-Fairhaven Group: Line 112 Extension Map Mendall Rd. Tap Wing Lane Substation Safety First and Always

  13. Slide 13: Line 112 Extension Structures

    DER Marion-Fairhaven Group: Line 112 Extension Structures Existing ROW Simulated Structure in ROW Proposed ROW ▪ Install steel transmission structures to support line extension into Crystal Springs ▪ Clear vegetation for ~50% of the new transmission line on the northerly side of the ROW where the li

  14. Slide 14: Typical Overhead Construction

    DER Marion-Fairhaven Group Project Typical Overhead Construction 1. Selective Vegetation Removal 3. Foundation Drilling 2. Work Area Prep 4. Pole Installation 6. Restoration 5. Wire Stringing Safety First and Always

  15. Slide 15: Permits & Filing

    DER Marion-Fairhaven Group Permits & Filing State Siting: ▪ MA Department of Public Utilities (DPU) – Section 72/40A Petition ** Local Siting: ▪ Rochester Planning Board - Site Plan Review Environmental Filings ▪ Massachusetts Environmental Policy Act Filing** ▪ Federal Wetlands Permitting Sections

  16. Slide 16: Filing Process

    DER Marion-Fairhaven Group Filing Process Steps to the DPU Review Process: ▪ Gather municipal and community input regarding the Proposed Project, including hosting Open Houses in the Project communities ▪ File Petition with the DPU ▪ DPU-conducted public comment hearing in a local community, offerin

  17. Slide 17: Group Timeline

    DER Marion-Fairhaven Group Timeline ng Approv ndi pact Study Fu Im al rea Completed DER Marion- May Received MA DPU Out ch 2024 Open Houses: approval to fund the Mar Fairhaven Group 2022 Marion-Fairhaven Group April 11th | Mattapoisett 2022 interconnections Customer Impact Study. capital investment

  18. Slide 18: Contact Information

    DER Marion-Fairhaven Group Contact Information Eversource Project Hotline 1-833-836-0302 Sign Up for Project Email Updates! Project E-mail ProjectInfoMA@eversource.com Questions or need translations? Call 1-833-836-0302 or email ProjectInfoMA@eversource.com ¿Tiene preguntas? ¿Traducciones? Envíe un