Renascor Resources Ltd · ASX:RNU

Renascor Resources — Shareholder Meeting (November 2014)

29 slides from Renascor Resources's shareholder meeting presentation, Nov 27, 2014

  1. Slide 1: Managing Director's Annual General Meeting 2014 Presentation to Shareholders

    ASX Announcement 27 November 2014 For personal use only Managing Director’s Annual General Meeting 2014 Presentation to Shareholders Attached please find a copy of the Managing Director’s presentation to be delivered today at the company’s AGM in Adelaide. BACKGROUND INFORMATION Renascor Resources i

  2. Slide 2: Annual General Meeting Presentation

    Annual General Meeting Presentation For personal use only 27 November 2014 Renascor Resources 1

  3. Slide 3: 2014 highlights

    2014 highlights For personal use only Copper discovery at 1050 East prospect • High-grade mineralised system adjacent to untested fault zone • First target drilled in Eastern Eyre project • 13m at 1.45% Cu, 66 ppm Ag and 0.17% Co (from 215m), including massive sulphide zone of 8m @ 2.2% Cu, 92 ppm A

  4. Slide 4: Corporate profile

    Corporate profile For personal use only • ASX code RNU • Shares on issue 136.9m Board of Directors • Options 6.2m(1) Chairman of corporate advisory and funds • Cash (30 Sep 14) ~$1.1m Stephen Bizzell management group; previously Executive • Share price (26 Nov 14) $0.036 (Chairman) Director Arrow En

  5. Slide 5: Olympic Dam Belt: Major copper province

    Olympic Dam Belt Major copper province For personal use only Prominent Hill 210 Mt @ 1.22% Cu from ~100m depth, discovered 2001 Olympic Dam 9,500 Mt @ 0.82% Cu from ~300m depth, discovered 1975 Carrapateena 800 Mt @ 0.80% Cu from ~500m depth, discovered 2005 Hillside 330 Mt @ 0.6 % Cu from <50m dept

  6. Slide 6: Compared to other large Cu deposits in region

    Eastern Eyre Project Compared to other large Cu deposits in region For personal use only Renascor’s Eastern Eyre Large copper deposits in South Australia Project Location: Olympic Dam corridor ✔ Geology: Host rock associated with Hiltaba granites ✔ Geologic Geology: Gawler Range Volcanics ✔ signatur

  7. Slide 7: Eastern Eyre Overview

    Eastern Eyre Project Overview For personal use only Tenements & ownership EL 4721, EL 5012 and EL 5236 (100%),EL 5400 and 5401 (option to earn 100%) Access granted – 2013 1050 East  Department of Defence restriction lifted Massive sulphides 8m @ 2.2% Cu  Renascor commences first comprehensive expl

  8. Slide 8: 1050 East Geology

    1050 East Geology Red Rock For personal use only fault 1050 East discovery Tank Hill volcanic centre in classic (concealed) volcanogenic setting  New mines department Roopena mapping study identifies fault zone Freshwell Angle Dam volcanic fault splays sequence (shown in red)  Volcanism controlled

  9. Slide 9: 1050 East: EEDD012 massive sulphides

    1050 East EEDD012 - massive sulphides For personal use only Host rock associated with Hiltaba/GRV  Moonabie formation  Olympic Dam age Portion of 3m @ 4.0% Cu, 164 ppm Ag and 0.42% Co Hole EEDD012 – portion of massive sulphide interval from 217.5 metres to 221.5 metres Renascor Resources 8

  10. Slide 10: 1050 East Drill results

    1050 East Drill results For personal use only High-grade copper in first prospect Freshwell Cu/ Pb anomaly Target drilled area for  Massive sulphides next-  Cu+Co+Ag phase drilling  Situated in southern portion of NNE Freshwell fault splays  Large target zone for more 47m @ 0.59% Cu, 55 ppm Ag 4

  11. Slide 11: Immediate drill targets

    Eastern Eyre Project Immediate drill targets For personal use only Drill-ready copper targets along strike and adjacent to 1050 East  Roopena-Angle Dam fault -- +40km, limited exploration  High priority gravity/magnetic targets  Recent surface sampling upgrades prospects  1050 East-style/IOCG Dr

  12. Slide 12: Nilginee prospect

    Eastern Eyre Project Nilginee prospect For personal use only Large coincident gravity/geochemical anomaly  +3MGal amplitude  3km strike-length  Centre of gravity feature coincident with magnetic anomaly  Along-strike from Arrium’s Moola prospect • Copper-gold mineralisation within a stratabound

  13. Slide 13: Nilginee prospect

    Eastern Eyre Project Nilginee prospect For personal use only Large coincident gravity/geochemical anomaly  +3MGal amplitude  3km strike-length  Centre of gravity feature coincident with magnetic anomaly  Along-strike from Arrium’s Moola prospect • Copper-gold mineralisation within a stratabound

  14. Slide 14: Knights prospect

    Eastern Eyre Project Knights prospect For personal use only Coincident gravity/ geochemical target  South of Nilginee along fault trend  High amplitude (3MGal) gravity target with coincident geochemistry  Anomalous copper (+50 ppm) from soils over 400m of strike, open to south  Maximum copper va

  15. Slide 15: Knights prospect

    Eastern Eyre Project Knights prospect For personal use only Coincident gravity/ geochemical target  South of Nilginee along fault trend  High amplitude (3MGal) gravity target with coincident geochemistry  Anomalous copper (+50 ppm) from soils over 400m of strike, open to south  Maximum copper va

  16. Slide 16: Extension Tank prospect

    Eastern Eyre Project Extension Tank prospect For personal use only Standout gravity target  High amplitude (6MGal) gravity anomaly  Discreet gravity signature within Roopena fault zone  Coincident magnetic response in southern target area  Limited shallow drilling over magnetised portion has not

  17. Slide 17: Extension Tank prospect

    Eastern Eyre Project Extension Tank prospect For personal use only Standout gravity target  High amplitude (6MGal) gravity anomaly  Discreet gravity signature within Roopena fault zone  Coincident magnetic response in southern target area  Limited shallow drilling over magnetised portion has not

  18. Slide 18: Target pipeline

    Eastern Eyre Project Target pipeline For personal use only Additional high-priority copper targets for 2015  Roopena-Angle Dam fault -- +40km, limited exploration  On-going reconnaissance programs have upgraded multiple gravity/magnetic targets  Final approvals being sought for drilling in 2015 P

  19. Slide 19: Northern fault targets

    Eastern Eyre Project Northern fault targets For personal use only Laura Ozone/Laura  Coincident gravity/magnetic targets  Along-strike from 1050 East  Structural setting comparable to WMC’s historic Spencer IOCG prospect, but with stronger geophysical response Ozone  Limited previous drilling ha

  20. Slide 20: Northern fault targets

    Eastern Eyre Project Northern fault targets For personal use only Laura Ozone/Laura  Coincident gravity/magnetic targets  Along-strike from 1050 East  Structural setting comparable to WMC’s historic Spencer IOCG prospect, but with stronger geophysical response Ozone  Limited previous drilling ha

  21. Slide 21: Highway prospect

    Eastern Eyre Project Highway prospect For personal use only Coincident gravity/ geochemical target  Northwest of 1050 East along regional fault trend  Immediately northeast of Arrium’s Iron Knob iron mine  High amplitude (3MGal), 2km gravity target  Anomalous copper (+50 ppm) from soils over gra

  22. Slide 22: Highway prospect

    Eastern Eyre Project Highway prospect For personal use only Coincident gravity/ geochemical target  Northwest of 1050 East along regional fault trend  Immediately northeast of Arrium’s Iron Knob iron mine  High amplitude (3MGal), 2km gravity target  Anomalous copper (+50 ppm) from soils over gra

  23. Slide 23: Southern fault trend

    Eastern Eyre Project Southern fault trend For personal use only Untested geophysical targets  Multiple prospects identified within fault trend along- strike from 1050 East  Limited/no drilling  Cocoa Dam: magnetic anomaly along Angle Dam fault trend  McMahons: coincident gravity/magnetic target

  24. Slide 24: Southern fault trend

    Eastern Eyre Project Southern fault trend For personal use only Untested geophysical targets  Multiple prospects identified within fault trend along- strike from 1050 East  Limited/no drilling  Cocoa Dam: magnetic anomaly along Angle Dam fault trend  McMahons: coincident gravity/magnetic target

  25. Slide 25: Uranium: Warrior and Frome Projects

    Uranium Warrior and Frome Projects For personal use only Portfolio includes low-cost opportunities to take advantage of increase in uranium price Warrior  Advanced, historic uranium project  Limited modern exploration  Two-fold opportunity: • Modern exploration methods to re- calibrate (and enhan

  26. Slide 26: Greenfield exploration: Farina, Gairdner and Olary projects

    Greenfield exploration Farina, Gairdner and Olary projects For personal use only Low carrying cost opportunities in base and precious metals Farina  Major position in Adelaide Fold Belt  Targeting large tonnage Zambian Copper Belt-style  Project area expanded in 2014 with acquisition of key groun

  27. Slide 27: Work Programs

    Work Programs For personal use only Remainder of 2014  RC drill program at Eastern Eyre  Follow-up drilling at 1050 East  First-pass drilling at Nilginee, Knights, Extension Tank 2015  Follow-up drilling based on results from current program  Expanded Eastern Eyre drilling including Ozone, Laur

  28. Slide 28: Summary

    For personal use only Summary • Major copper system discovered at Eastern Eyre  First drill program drilled in project area  Olympic Dam Belt  Follow-on drilling underway • Strong pipeline of new, untested targets  1050 East  Nilginee, Knights, Extension Tank  Northern and southern fault targe

  29. Slide 29: Important notice

    For personal use only Important notice Forward Looking Statements This Presentation may include statements that could be deemed “forward-looking” statements. Although Renascor Resources Limited (the “Company”) believes the expectations expressed in such forward-looking statements are based on reason

Renascor Resources — Shareholder Meeting (November 2014) on 6ix