Patagonia Gold Corp · TSXV:PGDC

Patagonia Gold — Investor Presentation (February 2009)

18 slides from Patagonia Gold's investor presentation, February 2009

  1. Slide 1: Patagonia Gold Plc

    Patagonia Gold Plc 2009 Updated Feb 2009

  2. Slide 2: Important Notice

    IMPORTANT NOTICE The information contained in these slides has been prepared by Patagonia Gold Plc ("the Company") in connection with a proposed placing of ordinary shares in the capital of the Company. The information in these slides is subject to updating, completion, revision, further verificatio

  3. Slide 3: Patagonia Gold Plc

    PATAGONIA GOLD PLC A precious metals exploration company operating in the southern provinces of Argentina Acquired Barrick Gold’s highly prospective Santa Cruz exploration portfolio in February 2007 Excellent results from drilling and exploration in 2007 and 2008 with resources of 640,000 oz. of gol

  4. Slide 4: Area of Operation

    AREA OF OPERATION Patagonia Gold through its subsidiary Patagonia Gold S.A. (PGSA) operates in five of the Argentine Provinces and Region XI in Chile Province Property Holding Santa Cruz 83 Chubut 94 Rio Negro 5 Chile 17 Total Properties 199 Total area held is 7,040 km² As at 31 Jan 2009. Note: The

  5. Slide 5: Santa Cruz

    SANTA CRUZ z 2300000 mE 2350000 mE 2400000 mE 2450000 mE 2500000 mE 2550000 mE 2600000 mE 2650000 mE n £ eas 7 Sree & a \ tig” ee - | . & 3 be i LAS HERAS M wager 8 2 zt HUEVOS VERDES ; Y 3 3 ) s 2 z Yo Cerro Vasco__ see [iS PICO TRUNCADO. on’ - CERRO NEGRO ‘ 3} La Emilia se 3 c=J te + + + Ss 3 Loma

  6. Slide 6: PGSA and Fomicruz form strategic partnership in Santa Cruz

    PGSA and FOMICRUZ form strategic partnership in Santa Cruz • Letter of Intent between the two parties signed in BsAs on 7 th May • PGSA will acquire a 90% interest and Fomicruz SE will acquire a 10% interest in a NewCo • PGSA to contribute approximately 100,000 ha consisting of : La Paloma, El Tranq

  7. Slide 7: La Paloma Property

    La PALOMA PROPERTY LOMADA DE LEIVA PROJECT COMPLETED PLANNED • Drilling of 53 holes for 8017 metres Milestones for Lomada Project. • Geophysical Survey • Final Metallurgical testing, Q2 2009 • Geotech and sterilization drilling, Q2 2009 • NI 43-101 Resource estimate at 0.30 grams per • Environmental

  8. Slide 8: Lomada de Leiva

    LOMADA de LEIVA Long section gold g/t x metres 10g/m 10g/m

  9. Slide 9: Lomada de Leiva

    LOMADA de LEIVA Plan of Geology with drill holes Section – N 8 525 interpretation

  10. Slide 10: El Tranquilo Property

    EL TRANQUILO PROPERTY CAP OESTE PROJECT COMPLETED PLANNED • Drilling 131 holes for 18,249 metres • Continue drilling on Main Zone and extensions • Detailed geophysical survey • Upgrade the NI 43-101 Resource estimate • NI 43-101 Resource estimate at 0.30 grams per Q3 2009 tonne of gold cut off is: I

  11. Slide 11: Cap Oeste

    CAP OESTE Long-section showing Au x metre

  12. Slide 12: Cap Oeste

    CAP OESTE ‘QuickBird’ Image Strike extension exploration

  13. Slide 13: Cap Oeste - Drill hole section

    CAP OESTE - Drill hole section N 10 000

  14. Slide 14: La Manchuria

    La MANCHURIA COMPLETED • Drilling of 40 holes for 8,099 metres on the Main Zone PLANNED • Geophysical survey • Assimilation of exploration and drill results • Peripheral exploration • Follow up drill programme to infill and extend high grade Main Zone Q4 2009 for Resource.

  15. Slide 15: La Manchuria

    La MANCHURIA Significant results Drill hole location plan Drill Hole No. From Interval Grade Grade Metres Metres Au g/t Ag g/t LM-002-D 43.30 0.55 8.08 10 and 52.55 1.51 6.38 4,521 LM-005-D 22.00 0.65 3.17 1,445 LM-008-D 82.00 0.50 20.10 2,980 and 90.00 0.50 20.20 509 and 105.90 0.70 11.55 963 LM-01

  16. Slide 16: La Manchuria - Drill section

    La MANCHURIA - Drill section N 5 275

  17. Slide 17: Programme for 2009

    PROGRAMME FOR 2009 • Lomada de Leiva – Complete Metallurgical testing, Environmental and Base-line Studies – Construct and load 50,000 tonne Trial heap Leach operation – Commence production of gold from Trial by Q4 2009. – Complete a Full Feasibility Study. • Cap Oeste – Continue drilling to Q2 2009

  18. Slide 18: Development Objectives

    DEVELOPMENT OBJECTIVES To become a gold producer by 2010 •Advancing the Lomada de Leiva low cost gold project through trial test work and full Feasibility-2009. Permitting and construction- 2009/10. Production 2010. Growth •Expansion of the Lomada de Leiva gold project through exploration •Advancing

Patagonia Gold — Investor Presentation (February 2009) on 6ix