  1. Slide 1: Endesa in the Balearic Islands: How the Balearic island system works

    Endesa in the Balearic Islands How the Balearic island system works Juan Jaume Director Generation Business in the Balearic Islands 8 June 2006

  2. Slide 2: Index

    Index o Introduction o Key parameters o Current Generation assets o Distribution Network o Specifics of an isolated system o Special operating characteristics o Main projects for the future

  3. Slide 3: Introduction

    Introduction Endesa is the sole production, transmission-distribution company in the Balearic Islands. It also sells gas. It acts as a supplier in the deregulated market. The Balearic Islands have two independent, isolated electricity systems: Mallorca-Menorca, with 1,365 nominal MW installed and Ib

  4. Slide 4: Index

    Index o Introduction o Key parameters o Current Generation assets o Distribution Network o Specifics of an isolated system o Special operating characteristics o Main projects for the future

  5. Slide 5: Key parameters

    Key parameters Generation Installed capacity: 1,623 MW Net production: 5,514 GWh Distribution Substations: 38 Transformer Center: 10.173 Lines: 14,892 km Distributed Energy: 5,649 GWh Sales Customers: 0.6 million Customer services: 94% of our customers are less than 10 km away from a customer servic

  6. Slide 6: Index

    Index o Introduction o Key parameters o Current Generation assets o Distribution Network o Specifics of an isolated system o Special operating characteristics o Main projects for the future

  7. Slide 7: Current sites

    Current sites ALCUDIA 510 (4) CAS TRESORER (4) 585 (6) (2) (6) MAHON 47 (3) 121 (3) 168 (6) SON REUS 75 (2) 154 458 612 MALL.-MEN. CABLE Installed capacity (MW): 75 IBIZA 155 (14) 89 (4) 244 (18) IBIZA-FORM. CABLE FORMENTERA 14 (1) 14 (1) INSTALLED CAPACITY (MW b.a. ) TYPE MW GROUPS HEAT 510 (31.4%)

  8. Slide 8: Index

    Index o Introduction o Key Parameters o Current Generation assets o Distribution network o Specifics of an isolated system o Special operating characteristics o Main projects for the future

  9. Slide 9: Transmission Network (December 2005)

    Transmission Network (December 2005) TO MENORCA B CAN PICAFORT ANDRATX VALLDURGENT POLLENCA A C D E I BUNYOLA INCA SON ORLANDIS F ARENAL LLUCMAJOR ALCUDIA 1 ALCUDIA 2 LLUBI ES BESSONS MANACOR ART CALA MILLOR PORTO COLOM SANTANYI SA POBLA G SA VINYETA SON REUS PALMA NOVA CALVIA POLIGON O H A -RAFAL B

  10. Slide 10: Medium Voltage Transmission Network (December 2005)

    Medium Voltage Transmission Network (December 2005) Ibiza and Formentera Menorca Mallorca In 2005: 6,086 km of Medium Voltage Network (15 kW) In 2005: 8,060 km of Low Voltage Network

  11. Slide 11: Market Dispersion and Protecting the Land

    Market Dispersion and Protecting the Land Protected Natural Environments Ibiza and Menorc a Mallorca Buildings > 50 m2 of plant

  12. Slide 12: Market Dispersion and MV Network Requirements

    Market Dispersion and MV Network Requirements Areas covered (km MW/km2) 1.24 1.05 0.92 0.25 0.51 0.56km MV / km2 ANDAL. & ARAGON BALEARICS CANARIES CATALONIA EXTREM.

  13. Slide 13: Index

    Index o Introducton o Key parameters o Current Generation assets o Distribution Network o Specifics of an isolated system o Strong electricity system o Key parameters o Isolated vs extensive system o Special operating characteristics o Main projects for the future

  14. Slide 14: Strong electricity system

    Strong electricity system dispersed or in power plants GENERATORS very different and different geographic CUSTOMERS distribution radial, fenced or mixed allowing correct NETWORK quality of customer supply energy produced equals energy consumed at all Operating bases times (not taking into account lo

  15. Slide 15: Key parameters

    Key parameters FREQUENCY periods by second (Hz) electrical pressure throughout entire network, especially with customers VOLTAGE electricity companies are obliged to keep these prices at their nominal valueQUALITY

  16. Slide 16: Isolated vs extensive system

    Isolated vs extensive system It is not the size of the key parameters which define the system but rather its variations compared to unbalances in the network. A 40 MW interruption produces a frequency change of: Mainland: 0.015 Hz Mallorca-Menorca: 0.80 Hz The difference between both systems is over

  17. Slide 17: Result of previous unbalance in the isolated systems

    Result of previous unbalance in the ISOLATED SYSTEMS ... o o o 49 Hz 48.8 Hz 48.6 HZ Very low utilisation factor (43% in 2005) In order to offset this deficiency: Primary reserve (margin in each generator) Secondary reserve (higher variable cost of generator margin) Third reserve (group stopped) GEN

  18. Slide 18: Conclusions

    Conclusions o Sharp frequency changes for the same load is around 55 higher than on the mainland o The loss or surge of a generation group almost inevitably means easing the load o Any change in the network frequency leads to capacity changes in the groups (no fewer than 30 incidents a year)

  19. Slide 19: Index

    Index o Introducton o Key parameters o Current Generation assets o Distribution Network o Specifics of an isolated system o Special operating characteristics o Supply quality o Main projects for the future

  20. Slide 20: Supply quality

    Supply quality The Balearic Islands, which mainly depend on tourism, are very sensitive to their international image and, therefore, the quality of its basic services The Interruption Time should be no higher than on the mainland although there, only T+D contribute to this whereas in the islands, ge

  21. Slide 21: Interruption time

    Interruption time Balearic Islands Endesa Mainland 7:29 4:08 72% Not forecast 34% Own 3:13 2:463:20 2:57 Programmed 2:30 0:55 1:20 0:41 0:31 0:50 0:18 1:37 2:09 2:13 Generation 2:25 1:52 0:34 0:32 0:21 2003 2004 2005 2003 2004 2005 Despite the peculiarities of the Balearic system, the quality has co

  22. Slide 22: Other peculiarities

    Other peculiarities Primary energies limited Stranded costs and maintenance of operation Size of units Sites and infrastructures o The lack of certain energy sources makes introducing certain technologies impossible o Generation groups distributed over 5 sites: Alcudia, Son Reus, Cas Tresorer, Ibiza

  23. Slide 23: Other peculiarities: Variations in demand

    Other peculiarities Variations in demand ..Demand monitoring means load at base groups must be reduced to minimum every night throughout the year ..The seasonability of demand detracts from capacity usage 350000 400000 450000 500000 550000 600000 ene feb mar abr may jun jul ago sep oct nov dic MWh-5

  24. Slide 24: Index

    Index o Introducton o Key parameters o Current Generation assets o Distribution Network o Specifics of an isolated system o Special operating characteristics o Main projects for the future o Increase generation capacity o Electricity interconnections o Gas interconnections

  25. Slide 25: Increase generation capacity

    Increase generation capacity 2007 2008 2009 2010 2011 MALLORCA 1 CC Steam 1 Gas T. 75MW 1 Gas T. 75MW turbine 75MW MENORCA 1 Gas T. 40MW IBIZA 2 Diesel 18MW 1 Gas T. 40MW ..No reductions are forecasted for the period indicated ..All of the groups are included in the review of the Balearic Energy Sec

  26. Slide 26: Interconnections

    Interconnections Torrent Sagunto Palma Santa Ponsa 2011 2007 2008 ELECTRICITY MALLORCA-IBIZA IBIZA-FORMENTERA BALEARICS-MAINLAND Year Capacity Voltage kmkW kW 2008 100 132 120 ca 2007 1x50 66 30 ca 2011 2x220 ?? 250 cc Conversion Stations GAS Year Pressure (b) MALLORCA-DENIA 2008 220 (underwater) 80

  27. Slide 27: Endesa in the Canary Islands

    8 June 2006 Endesa in the Canary Islands

  28. Slide 28: Key parameters

    Key parameters Generation Installed capacity: 2.202 MW Net production: 7.950 GWh Distribution Substations: 117 Transformer Center: 9.515 Lines: 23.405 km Distributed Energy: 8.548 GWh Sales Customers: + 1 million Customer services: 89% of our customers are less than 10 Km away from a customer servic

  29. Slide 29: Current sites

    ARONA 50 (2) JINAMAR 233 (5) 84 (5) 99 (3) 416 (13) BCO. TIRAJANA 160 (2) SALINAS 108 (9) 79 (3) 187 (8) PTA. GRANDE 114 (8) 63 (2) 177 (10) CANDELARIA 160 (4) 36 (3) 92 (3) 288 (10) GRANADILLA 160 (2) 48 (2) 81 (2) 225 (1) 514 (7) MULATO 0.8 (1) EL PALMAR 22 (9) LLANOS BLANCOS 11 (9) LOS GUINCHOS 5

  30. Slide 30: SAIDI Canary Islands

    SAIDI Canary Islands Endesa Mainland 46% 34% 4:21 1:07 0:19 0:29 0:09 0:54 0:17 2:20 1:42 1:54 2:31 2:20 3:20 Not forecast 0:34 2:46 2:57 Own Programmed 0:32 2:25 2:13 Generation 0:21 1:52 2003 2004 2005 2003 2004 2005 As of the Balearic system, despite its peculiarities, the Canary system reaches m

  31. Slide 31: Increase generation capacity

    Increase generation capacity LANZAROTE FUERTEVENTURA LA PALMA TENERIFE G. CANARIA GOMERA EL HIERRO 2007 2008 2009 1 Diesel 18MW 1 Diesel 18MW 1 Diesel 18MW 1 Diesel 30MW 1 T. Gas 15 MW 1 T. Gas 46 MW (Los Vallitos) 1 T. Steam 75 MW 1 T. Gas 75 MW (CCGT Tirajana 2) (CCGT Tirajana 3) 1 Diesel 3,5 MW 1

  32. Slide 32: Disclaimer

    Disclaimer This presentation contains certain "forward-looking statements" regarding anticipated financial and operating results and statistics and other future events. These statements are not guarantees of future performance and are subject to material risks, uncertainties, changes and other facto

  33. Slide 33: Endesa in the Balearic Islands: How the Balearic island system works

    Endesa in the Balearic Islands How the Balearic island system works Juan Jaume Director Generation Business in the Balearic Islands 8 June 2006 SIGNATURES Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the

Endesa — Corporate Update (June 2006) on 6ix