Canadian Copper, Inc. · CSE:CCI
Canadian Copper — Investor Presentation (May 2025)
17 slides from Canadian Copper's investor presentation, May 2025
Slide 1: Combined Strategy: PEA Results
CSE : CCI PRESENTATION DECK M AY 2 0 2 5 COMB INED STRATEGY: PEA RESULTS PO S I T IO NI NG F O R CO PP E R AND Z INC PR O DU CT IO N I N B AT H U R S T, N E W B R U N S W I C K , C A N A D A www.canadiancopper.com
Slide 2: Disclaimer
DISCLAIMER Forward-Looking Informa tion and Statements This presentation contains “forward-looking information” for purposes of applicable Canadian securities laws. Forward-looking The Caribou Mine historical mineral resource es timates were derived from the technical report titled “Technical Report
Slide 3: Ownership, Financing & Capitalization
3% 5% >$500,000 Invested to 2% Date, or 3.2x Yearly Salary OWNERSHIP, FINANCING & CAPITALIZATION 12% 29% C A P I TA L ST R U C T U R E Share Price (C$) $0.18 Current S/O 102M Average Volume 150K Market Cap $18M Cash $1.4M Retail Investors Warrants 21.1M1 Seed Investors Options 4.0M 49% CEO (avg. cos
Slide 4: Combined Strategy: Complementary Assets
21 MA Y 2025 COMBINED STRATEGY: COMPLEMENTARY ASSETS PROVEN LARGE DEPOSIT EXISTING PROCESS FACILITY N MURRAY BROOK DEPOSIT CARIBOU PLANT COMPLEX • Permitted mine and • 100% ownership; milling complex; • Advanced development • Name plate processing • +21Mt @ 1.42% CuEq; capacity is 3,000 tpd; 98% M&I
Slide 5: Combined Strategy: PEA Results
21 MA Y 2025 COMBINED STRATEGY: PEA RESULTS HIGH LIGHTS 13.2 year BASE CASE ASSUMPTIONS US$4.25/lb Cu | US$1.30/lb Zn US$27/oz Ag | US$1.10/lb Pb Mine Life PRE-TAX AFTER-TAX C$64 M C$265 M C$171 M Initial Capex NPV (7%) NPV (7%) 30 M lbs CuEq Or 41% 36% 98 M lbs ZnEq IRR IRR Avg. Annual 3,300 tpd 1.
Slide 6: PEA Production Metrics
21 MA Y 2025 PEA PRODUCTION METRICS Costs Production Mine Life 13.2 years INITIAL CAPEX SUSTAINING CAPEX 30 M lbs CuEq Average Annual Production 98 M lbs ZnEq C$64M C$49M Avg. Annual Copper Production 8 M lbs Cu Avg. Annual Zinc Production 47 M lbs Zn Avg. Annual Silver Production 783 K oz Ag AISC T
Slide 7: Initial Capex (C$M) & After-Tax IRR (%)
21 MA Y 2025 INITIAL CAPEX (C$M) & AFTER-TAX IRR (%) $1,968 $1,347 $1,144 $1,082 67% 46% 46% 31% 38% 36% 29% 23% 25% 29% 22% 25% 25% 23% 20% 14% 13% 20% $653 $568 $493 $383 $220 $186 $181 $145 $142 $142 $81 $67 $64 $46 Berg Yellowhead North McIlvenna Pine Point Kwanika Kutcho Kudz Ze Carmacks Mataga
Slide 8: Capital Costs
21 MA Y 2025 CAPITAL COSTS SUSTAINING CAPEX CAPEX CARIBOU MILL PURCHASE $6 C$ 49M MINING - OTHER 29 WATER TREATMENT 0.2 PROCESS PLANT 7 Mining & Plan Equipment ON SITE 1 C$ 64M INFRASTRUCTURE Tailings Storage Facility INDIRECTS 6 Water Treatment plant PROJECT DELIVERY 4 OWNERS COSTS 2 Haul Road CONT
Slide 9: Murray Brook Is Key to Caribou
MURRAY BROOK IS KEY TO CARIBOU PREVIOUS OPERATION CANADIAN COPPER’S OPPORTUNITY MURRAY BROOK DEPOSIT – Only 10km away • Open pit resource with consistent mill feed tonnage • M&I resource base outlines a 13+ year production plan, with growth potential Ore availability, UG instability, ore delineation
Slide 10: Murray Brook Site Layout
21 MA Y 2025 MURRAY BROOK SITE LAYOUT 10
Slide 11: Proposed Access Roads
21 MA Y 2025 PROPOSED ACCESS ROADS 11
Slide 12: Combined Strategy Flowsheet
21 MA Y 2025 COMBINED HAUL TRUCK PRIMARY VIBRATING SCREEN SECONDARY CYCLONE CLUSTER STRATEGY BATTERY BULK LIMIT ROUGHER CRUSHER FEED HOPPER BULK BULK AND VIBRATING FEEDER CRUSHED ORE SCAVENGER CONDITIONING CONVEYOR 3 SAG MILL TANK FLOWSHEET CRUSHED ORE BALL MILL 1 BALL MILL 2 PORTABLE JAW CONVEYOR 2
Slide 13: Activity Summary
21 MA Y 2025 ACTI VITY S U MM A RY 2025 2025 2026 DELIVERABLES Q1 Q2 Q3 Q4 Q1 – Q4 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC WE ARE HERE Metallurgical Test Program Environmental Constraints Analysis Mine Design & Site Layout Process Plant Verification Independent Financial Model Publish PEA Cl
Slide 14: MOU with Pabineau First Nation
21 MA Y 2025 MOU WITH PABINEAU FIRST NATION October 8th , 2024: Canadian Copper signed a non-binding Memorandum of Understanding with Pabineau First Nation The MOU aims to foster Creates mutual benefits, Pabineau First Nation open communication and including job creation, provides local land collabo
Slide 15: Management Team, Board of Directors
CSE: CCI MANAGEMENT TEAM BOARD OF DIRECTORS SIM ON QUICK | CEO & DIREC TOR ANDREW ELINESKY | DIRECTOR Mr. Quick has more than 14 years as a well-regarded mining As a finance professional, Mr. Elinesky brings over 20 years of experience as a CFO and leader, spanning the USA, Mexico, Argentina, and Ca
Slide 16: Thank You
THANK YOU Simon Quick Chief Executive Officer simon@canadiancopper.com 905.220.6661 16
Slide 17: Appendix A: 2023 Mineral Resource
APPENDIX A: 2023 MINERAL RESOURCE 1 1 US metal prices $4.00/lb Cu, $1.25/lb Zn, $0.95/lb Pb, and $23/oz Ag at $0.76 USD/CAD. 17 1 Process recoveries used were 80% Cu, 87% Zn, 75% Pb, and 90% Ag.