New Pacific Metals Corp · TSX:NUAG
New Pacific Metals — Investor Presentation (November 2009)
21 slides from New Pacific Metals's investor presentation, Nov 26, 2009
Slide 1: Exploring For Gold – Polymetallic Metals in China
TSX-V : NUX OTC Pink Sheet: NUXFF Exploring For Gold – Polymetallic Metals in China Presented By Lou Duarte November, 2009 www.newpacificmetals.com TSX-V: NUX
Slide 2: Cautionary Disclaimer Forward Looking Statements
Cautionary Disclaimer Forward Looking Statements Statements in this presentation other than purely historical information, including statements relating to the Company's future plans and objectives or expected results, constitute forward-looking statements. Forward-looking statements are based on nu
Slide 3: Project Location and Strategy
Project Location and Strategy • New Pacific Metals Corp.’s (TSX- V: NUX) is exploring for high grade gold at the Huaiji Gold Project in Guangdong Province, China. • NUX’s major shareholder is Silvercorp Metals Inc. (TSX : SVM, NYSE Amex : SVM). (23.2%) • NUX is continuing its underground tunneling t
Slide 4: Corporate Overview
Corporate Overview Corporate Profile Management & Board TSX-V: NUX OTCBB: NUXFF Rui Feng, Ph.D., Geology Director (Chairman/CEO of Silvercorp) Current Share Price: C$1.01 Jack Austin, P.C, Q.C.,B.A., LLB., LL.M, Doc.Soc.Sci. (Hon) Rolling Hi/Low: C$3.12/$0.30 Director & Chairman Lou Duarte, BASc., M
Slide 5: Huaiji Gold-Polymetallic Project in Guangdong Province
Huaiji Gold-Polymetallic Project in Guangdong Province 800 1000 1200 New Pacific Metals Corp. N Project Location map 400 Beijing CHINA Huaiji Property Map 300 Shanghai Sichuan Chengdu Kang-Dian/Bingdihong Projects Huaiji Gold Project 200 Guangzhou Hong Kong SCALE Guangdong 0 500 1000 KM • Two Gold-P
Slide 6: HNK Permit Area
HNK Permit Area Gold, lead and silver soil anomalies extending outside West Area East Area presently being East Area explored. www.newpacificmetals.com TSX-V: NUX
Slide 7: HNK Project Current Work in East Area
HNK Project Current Work in East Area ¾ Geology and Roads ¾ Veins and Old Adits ¾ Gold Soil Geochemistry ¾ Drill Holes Completed to date ¾ Underground Tunnel and Adit under Construction www.newpacificmetals.com TSX-V: NUX
Slide 8: HNK Permit – East Area “Drill For Structure”
HNK Permit – East Area “Drill For Structure” • Sampled 189 tunnels • 18 Au-bearing veins identified • Drilled 15,279meters in 54 drill holes www.newpacificmetals.com TSX-V: NUX
Slide 9: Cross Section on Line 0 “Drill For Structure”
Cross Section on Line 0 “Drill For Structure” 8.13m@55.05g/tAu 1.23m@10.50 g/tAu $US 300/tone 3.1m@13.55 g/tAu $US 390/tone 21.30g/t Au 1.94m@46.06 g/tAu 0.20m@ 40.30g/t Ag $US 1, 300/tone 1.17% Pb 7.84% Zn Gold Price: $US 900/oz www.newpacificmetals.com TSX-V: NUX
Slide 10: Plan View of Underground Tunneling “Drift For Grade”
Plan View of Underground Tunneling “Drift For Grade” • Tunnelled 3,000m on levels PD260, PD220, PD180, and PD 140 to November, 2009. • Plan additional 2,000 meters of tunneling on V9 and access tunneling to V11, V2 (newly discovered vein), and V209 in the West Area. • Objective define and develop “u
Slide 11: Schematic Underground Tunneling Diagram “Drift For Grade”
Schematic Underground Tunneling Diagram 0 22 0 D ri f t 1 8 ift 40 Dr 9 ft 1 Dr i in Ve PD 220 “Drift For Grade” www.newpacificmetals.com TSX-V: NUX
Slide 12: Cross Section on Line 00
Cross Section on Line 00 www.newpacificmetals.com TSX-V: NUX
Slide 13: Recent Tunnel Sampling of V9 Vein at Elevation 180
Recent Tunnel Sampling of V9 Vein at Elevation 180 Sample Distance to Au Ag Pb Zn Width of Vein(m) Number Line 0(m) (g/t) (g/t) (%) (%) A177 17.0 0.3 5.69 16 0.124 0.054 A176 21.0 0.3 276 251 3 3.5 A175 25.0 0.35 233 138 1.385 0.773 A170 29.4 0.5 621 181 1.985 3.82 A168 30.5 0.5 443 146 1.86 3.28 A1
Slide 14: Outline of 4,000 Meters of Tunneling on Vein V9
Outline of 4,000 Meters of Tunneling on Vein V9 www.newpacificmetals.com TSX-V: NUX
Slide 15: New Vein V2
New Vein V2 Vein V2 Mined out Area V2 Access Tunnel Proposed Drift Along V2 • Previously mined with large openings. • Small open pit from previous mining. • Plan – Tunnel to access and drift along vein. www.newpacificmetals.com TSX-V: NUX
Slide 16: Metallurgical Testing of Samples From V9 Vein
Metallurgical Testing of Samples From V9 Vein Metallurgical test done by: Hunan Institute for Non-Ferrous Metal Research, a Qualified Chinese Engineering Firm • The ore was crushed and ground to -200 mesh and three concentrates (gold-lead, gold-pyrite and Zinc) • The overall metal recoveries were •
Slide 17: HNK Permit Area West Area
HNK Permit Area West Area PD 209 V 209 West Area PD 209 East Area • Gold, lead and silver soil anomalies extending outside the east area that is presently being explored. • 21 tunnels • Define drill targets from tunnel sampling and investigated to date. from the large geochemical anomalies. www.newp
Slide 18: XSK Permit: Geology and Prospecting
XSK Permit: Geology and Prospecting • Large Au soil anomalies. • Multitude of old artesian mining tunnels. www.newpacificmetals.com TSX-V: NUX
Slide 19: Gold in China
Gold in China • China is now the world’s largest gold producer topping South Africa and the second biggest gold consumer after India. • China has the world’s biggest foreign exchange reserves ($2 trillion). • But, China’s gold reserves only ranks fifth in the world with 1,054 tons versus 8,133 tons
Slide 20: The Market for Gold Properties in China
The Market for Gold Properties in China • China National Gold Group Corp, the largest gold producer in China, bought Yangshan Gold Mine for US $318 million. • It is selling seven of its mines to its subsidiary company Zhongjin Gold Co. which is listed on Shanghai Exchange. • ZIJIN Mining Group raise
Slide 21: Contact Information
TSX-V : NUX Contact Information OTC Pink Sheet: NUXFF Contact Information: Suite 1378-200 Granville Street Tel: 1-604-633-1368 Vancouver, BC Fax: 1-604-669-9387 Canada Email: info@newpacificmetals.com V6C1S4 Website: www.newpacificmetals.com
New Pacific Metals — Investor Presentation (November 2009) on 6ix