Eversource Energy (D/B/A) · NYSE:ES

Eversource Energy (D/B/A) — Eversource Energy — Corporate Update (October 2020)

14 slides from Eversource Energy (D/B/A)'s corporate update, Oct 27, 2020

  1. Slide 1: Proposed Carver to Kingston Reliability Project

    Proposed Carver to Kingston Reliability Project Department of Public Utilities (DPU) Public Hearing Towns of Carver, Plympton, and Kingston October 27, 2020 Safety First and Always

  2. Slide 2: Table of Contents

    Proposed Carver to Kingston Reliability Project Table of Contents ▪ Proposed Project Overview ▪ Project Need ▪ Proposed Project Cross Sections ▪ Typical Overhead Construction ▪ Estimated Project Construction, Permitting and Estimated Timeline ▪ Community Outreach ▪ Contact Information Safety First a

  3. Slide 3: Overview

    Proposed Carver to Kingston Reliability Project Overview ▪ Currently, Eversource has one overhead transmission line in the right of way between the Carver Substation, off Route 58, and the Kingston Substation on Pembroke Street in Kingston ▪ The Carver to Kingston Project proposes constructing a new

  4. Slide 4: Project Need

    Proposed Carver to Kingston Reliability Project Project Need ▪ A reliable electrical transmission grid is vital to the safety, security and economic prosperity of the region. The transmission system serves a critical role to ensure the electricity flows with a high degree of reliability to where pow

  5. Slide 5: Structure Cross Sections – Carver Substation to Spring Street

    Proposed Carver to Kingston Reliability Project Structure Cross Sections – Carver Substation to Spring Street In this section, H-frame steel structures are proposed. 4 Safety First and Always

  6. Slide 6: Structure Cross Sections – Spring Street to Brook Street

    Proposed Carver to Kingston Reliability Project Structure Cross Sections – Spring Street to Brook Street Due to the existence of a distribution line, the structures in this section will be steel monopoles to adjust to the proper distancing needed between circuits. 5 Safety First and Always

  7. Slide 7: Structure Cross Sections – Brook Street to Bog View Drive

    Proposed Carver to Kingston Reliability Project Structure Cross Sections – Brook Street to Bog View Drive With the distribution line present, the structures in this section will be steel monopoles to allow for proper distancing between circuits. 6 Safety First and Always

  8. Slide 8: Structure Cross Sections – Bog View Rd to Kingston Substation

    Proposed Carver to Kingston Reliability Project Structure Cross Sections – Bog View Rd to Kingston Substation With a distribution line present, the structures in this section will be steel monopoles to allow for proper distancing between circuits. 7 Safety First and Always

  9. Slide 9: Typical Overhead Construction

    Typical Overhead Construction 8 Safety First and Always

  10. Slide 10: Construction

    Proposed Carver to Kingston Reliability Project Construction • Where applicable, crews will secure police details and implement traffic management plans to: ✓ Access the right of way ✓ Maintain residential street access ✓ Maintain pedestrian and motorist safety • Eversource will communicate and work

  11. Slide 11: Permitting

    Proposed Carver to Kingston Reliability Project Permitting Permits or Permitting Agency Jurisdiction Army Corps of Engineers Federal Environmental Protection Agency Federal Massachusetts Department of Environmental Protection State (MassDEP) Massachusetts Department of Transportation State Massachus

  12. Slide 12: Estimated Timeline

    Proposed Carver to Kingston Reliability Project Estimated Timeline* Q3 2019 Q4 2019 Q1 2020 Q2 2020 Q3 2020 Q4 2020 Q1 2021 Q2 2021 Q3 2021 Q4 2021 Community Open House (complete) Chapter 72 Application Filed with DPU (complete) Public Comment Hearing* Other Federal, State & Local Environmental Perm

  13. Slide 13: Community Outreach

    Proposed Carver to Kingston Reliability Project Community Outreach Stakeholders ▪ Municipal officials ▪ State and federal elected officials and regulators ▪ Property owners & tenants ▪ Businesses Project Communication for Municipalities ▪ Briefings & Presentations ▪ E-mail updates Project Communicat

  14. Slide 14: Team Contact Information

    Proposed Carver to Kingston Reliability Project Team Contact Information Project Manager Nathan Dennis Phone: (774) 404-4400 Email: Nathan.Dennis@eversource.com Project Community Outreach Representative (Siting and Construction Services) Megan Aconfora Phone: (203) 499-9245 Email: Megan.Aconfora@eve