Gold Mountain Limited · ASX:GMN

Gold Mountain — Investor Presentation (April 2024)

18 slides from Gold Mountain's investor presentation, Apr 15, 2024

  1. Slide 1: Critical minerals for the clean energy transition

    GOLD MOUNTAIN For personal use only Critical minerals for the clean energy transition Gold Mountain is pleased to release an investor presentation on the Down Under Rare Earths project. GMN Chief Geologists Peter Temby and Luziane Souza have released a video to accompany this presentation. To view t

  2. Slide 2: Critical minerals for the clean energy transition

    GOLD MOUNTAIN For personal use only Critical minerals for the clean energy transition ASX: GMN | CORPORATE PRESENTATION | APRIL 2024

  3. Slide 3: Important notice & disclaimer

    Important notice & disclaimer • This presentation has been prepared by Gold Mountain Limited liability (including, without limitation, any liability arising from (“GMN”) for the sole purpose of providing general information on fault or negligence on the part of any of them) for any loss GMN (“Purpos

  4. Slide 4: Aim, location and principal targets

    Down Under REE Project • AIM – to find a significant resource of IAC type REE mineralisation and also high For personal use only grade hard rock mineralisation. • LOCATION – adjacent to and along strike from BRE tenements with known significant resources of REE, base map Th/K. • PRINCIPAL TARGETS –

  5. Slide 5: Planning

    Down Under REE Project EXPLORATION PLANNING • Carry out detailed evaluation of theses, For personal use only previous exploration and prospectus on the region. • Define prospective areas based on all available data, not just on one company’s success story. • Detailed field planning on critical aspec

  6. Slide 6: Systematic exploration planning

    Down Under REE Project • SYSTEMATIC EXPLORATION PLANNING Must have strong weathering and For personal use only preserved weathering profiles. We have carried out geomorphic mapping over the approximately 1100 km2 of Down Under tenements and defined three separate surfaces We are having spectral anal

  7. Slide 7: Exploration planning

    Down Under REE Project • EXPLORATION PLANNING Must have strong weathering and preserved For personal use only weathering profiles. We have carried out geomorphic mapping over the approximately 1100 km2 of GMN tenements and defined three separate surfaces of unknown type The prospective surfaces will

  8. Slide 8: In progress: sampling and mapping

    Down Under REE Project EXPLORATION IN PROGRESS For personal use only • Sampling and mapping in progress under way • Sampled points up to 12th of April, shown in green

  9. Slide 9: In progress: mapping of rock types

    Down Under REE Project EXPLORATION IN PROGRESS For personal use only Mapping of charnockites, leucogranites and silicified rocks. BRE mineralisation reported in Prospectus lodged with ASX November 13, 2023. Sources - 1 BRE Prospectus

  10. Slide 10: In progress: mapping under way

    Down Under REE Project EXPLORATION IN PROGRESS For personal use only • Mapping under way • Charnockite major rock type • Leucogranite/ alaskite identified • Silicified rock types identified

  11. Slide 11: Exploration in progress: weathered profile

    Down Under REE Project • EXPLORATION IN PROGRESS For personal use only Weathered profile showing the mottled, saprolite and saprock zones. Channel sampling of each zone was undertaken. The inset shows a probable core stone, it is unknown whether it is mineralised until results are received.

  12. Slide 12: In progress: sampling and mapping Down Under

    Down Under REE Project EXPLORATION IN For personal use only PROGRESS • Gold Mountain Limited is sampling and mapping Down Under to detail and same rocks as mapped in nearby deposits are being found in our ground.

  13. Slide 13: Sheared and silicified charnockites

    Down Under REE Project EXPLORATION IN PROGRESS • Sheared and silicified For personal use only charnockites in EL 872237/2023 • In this area, the predominant rocks are charnockites. • Mylonite boulders mapped which are favourable for REE mineralization in the region • Shearing, hydrothermal alteratio

  14. Slide 14: Three separate weathering surfaces defined

    Down Under REE Project EXPLORATION PLANNING Three separate weathering surfaces For personal use only defined. The surfaces are draped, or wavy in profile, so tracing the same horizon is not always straight forward. The contoured image shows three surfaces, a high elevation, a medium elevation and a

  15. Slide 15: Stream sediment sampling for IAC deposits

    Down Under REE Project EXPLORATION PLANNING Stream sediment sampling for IAC For personal use only deposits are being carried out on the ground using GMN’s proprietary sample collection and preparation methods. REE in IAC is adsorbed and or complexed with clay and similar minerals as well as on some

  16. Slide 16: Systematic exploration planning timeline

    Down Under REE Project SYSTEMATIC EXPLORATION PLANNING • Two sampling teams deployed on 4th March, third team operational in early For personal use only April after training on sampling techniques. • 3-4 months sampling with three good teams to complete the regional sampling assuming no areas delete

  17. Slide 17: References

    Down Under REE Project References 1. Brazilian Rare Earths Prospectus dated 13 November 2023. Brazilian Rare Earths Limited 2. Brazil Geological Survey (CPRM) website https://geosgb.sgb.gov.br/ and the Brazil National Mining Agency (ANM) For personal use only website https://geo.anm.gov.br/portal/ap

  18. Slide 18: For personal use only

    Down Under REE Project All announcements are available to view on www.goldmountainltd.com.au . The company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and, in the case of estimates of Mineral Resour

Gold Mountain — Investor Presentation (April 2024) on 6ix