Tombill Mines Ltd. · TSXV:TBLL
Tombill Mines — Investor Presentation (December 2021)
23 slides from Tombill Mines's investor presentation, December 2021
Slide 1: Investor Presentation – Dec. 2021
TSX-V: TBLL OTCQB: TBLLF INVESTOR PRESENTATION – DEC. 2021 EXPANDING GERALDTON GOLD CAMP’S WORLD CLASS RESOURCE WWW.TOMBILLMINES.COM
Slide 2: Company Disclaimer
COMPANY DISCLAIMER Introductory Cautionary Notes Tombill Mines Limited (“Tombill”) has taken all reasonable care in producing and publishing information contained in this presentation and website, and will endeavor to do so regularly. Material may still contain technical or other inaccuracies, omiss
Slide 3: Tombill at a Glance
TOMBILL AT A GLANCE MIDDLE OF OPTIMAL GOLD CAMP, SIZABLE RESOURCES TBLL Results To Date: Seasoned Senior Simple Story & Structure: Own • High Grade Intercepts Team/Advisors in Place with Patents, No Royalties, Top Extending the F-Zone Superior Local Knowledge & Jurisdiction, Optimal • Low Grade Inte
Slide 4: Tombill/Geraldton Gold Camp History, Resource & Exploration
TOMBILL/GERALDTON GOLD CAMP HISTORY, RESOURCE & EXPLORATION SIZABLE RESOURCES MORPHING FROM PAST MINES Tombill: “Donut Hole” within World Class Gold Mine under G E R A L D T O N C A M P P A S T P R O D U C E R S + C U R R E N T R E S O U R C E (4) Construction Little Long 10 Past Producing Gold Mine
Slide 5: Geraldton Gold Camp Past Producers: 1934-70 & Current Resources
GER ALD TON GOLD C AMP PAST PR OD U C ERS: 1934-70 & C U R R EN T R ESOU R C ES LIMITED FOCUS HISTORICALLY ON LOW GRADE NEAR SURFACE. 6 OF 10 LOCAL PAST MINES HAVE YIELDED EXPONENTIALLY LARGER RESOURCES RELATIVE TO PAST MINES Talmora Long Lac Little Long Tombill Original Bankfield 10 Past Producing
Slide 6: Our Location: Geraldton Gold Camp
OUR LOCATION: GERALDTON GOLD CAMP “DONUT HOLE” IN THIS WORLD CLASS RE-AWAKENED GOLD CAMP LARGE TOWN, INFRASTRUCTURE, DONUT HOLE IN GERALDTON GOLD CAMP Tombill: founded 1935 by Newmont and Tom Johnson To Airport Footprint: 3,050+ Acres with Until Now Sparse and (6km) Antiquated Historical Exploration
Slide 7: Tombill's Surface & Underground Primary Gold Targets
TOMBILL’S SURFACE & UNDERGROUND PRIMARY GOLD TARGETS FOCUSING ON FOUR POTENTIAL HIGH QUALITY TARGETS – TWO PAST MINES – LOWER GRADE SURFACE AND HIGHER GRADE DEPTH F- ZONE EXTN/TOMBILL MAIN TOMBILL ORIGINAL MINE-NEAR SURFACE TALMORA MINE-NEAR SURFACE GROUP o Past Producing(1938-42,55) o Past Producin
Slide 8: On Strike with Greenstone Mine, Including F-Zone
ON STRIKE WITH GREENSTONE MINE, INCLUDING F-ZONE F-ZONE, OVER HARDROCK: 6GPT+; 30 X 125M DIMENSION; ~4.3KM STRIKE Greenstone Mine: Dimension of F-Zone (1) (2) LONG SECTION OF THE GERALDTON CAMP LOOKING NORTH (3) • Gpt: Above 6 g/t • Height: 100 - 150m • Width: 25 - 35m • Density ratio: 2.7x MM179C M
Slide 9: F-Zone Lithology Similar to Hardrock
F-ZONE LITHOLOGY SIMILAR TO HARDROCK NOTE DEFORMED WHITE QUARTZ VEINS IN GREYWACKE F-ZONE INTERCEPTS TOMBILL HARDROCK Part of F-Zone drill intercept at Tombill from drill-hole TB21- F-Zone mineralization in core from Premier Gold Mines 005A at around 1105 m down-hole Limited (Hardrock), 2011 9 | TBL
Slide 10: Our Results Confirm Extension of F-Zone & Other Zones Down Plunge
OUR RESULTS CONFIRM EXTENSION OF F- ZONE & OTHER ZONES DOWN PLUNGE STRIKE 283M; INTERSECTED 46M; WEIGHTED 6.01G/T SIGNIFICANT RESULTS OF PHASE 1 DRILL PROGRAM TO DATE LONG SECTION VIEW OF DEEP DRILLING TO DATE Hole-ID From (m) To (m) Length (m) Au (g/t) Zone 46M TB21-001A 1191 1192 1.0 6.03 F TB21-0
Slide 11: Inaugural Near Surface Drilling: Talmora Past-Producing Mine
INAUGURAL NEAR SURFACE DRILLING: TALMORA PAST -PRODUCING MINE 1,146M DRILLED, INTERSECTED 22M; WEIGHTED 2.47 G/T, INCLUDING 1.65G/T OVER 11.5M INTERSECT TALMORA DRILLING SECTION LOOKING WEST SIGNIFICANT RESULTS OF TALMORA DRILLING Interval From To Au Hole ID Length Zone (m) (m) (gpt) (m) TAL21001 13
Slide 12: Current Exploration Program - Phase 2A
CURRENT EXPLORATION PROGRAM -PHASE 2A 2 ESTABLISHED PAST PRODUCING NEAR SURFACE MINING TARGETS + DEEP DRILL PROGRAMS TO CONTINUE THE HIGH-GRADE F-ZONE STRIKE TOMBILL EXPLORATION AND DRILLING PROGRAM Phase 2A/2022: Objective is to diversity exploration -- LEGEND Hardrock Resource mostly drilling -- o
Slide 13: F-Zone Extension Drilling Program
F-ZONE EXTENSION DRILLING PROGRAM EXTENDING THE ESTABLISHED PLUNGE OF THE F-ZONE TOMBILL MAIN GROUP PHASE 1 & 2 DRILLING PROGRAMS Last exploration of Tombill was in the early 80’s- very marginal LEGEND Phase 1 • Jan 2021 - 1st deep drilling ever on Phase #1 Collars Phase #2 Collars Tombill TOMBILL M
Slide 14: Talmora & Tombill Main Group North Near Surface Exploration Program
TALMORA & TOMBILL MAIN GROUP NORTH -- NEAR SURFACE EXPLORATION PROGRAM COMMENCED SEPTEMBER 2021 AT TALMORA, OUR PAST PRODUCING MINE TALMORA SURFACE DRILLING PROGRAM Northern Half of Tombill Main Group comprises interesting mineralisation and the past-producing Talmora mine • UAV-MAG survey completed
Slide 15: Tombill Original Mine Near Surface Exploration Program
TOMBILL ORIGINAL MINE -- NEAR SURFACE EXPLORATION PROGRAM COMMENCING IN 2022, OUR PAST PRODUCING MINE Tombill Original Mine was mined in 1938-42, TOMBILL ORIGINAL MINE 55 where 68.7k oz AU were produced at 12.36 g/t Borders Trans Canada Hwy, 4km west of Main Group A strong correlation exists discove
Slide 16: Experienced & Proven Team
EXPERIENCED & PROVEN TEAM TOP NOTCH TEAM WITH UNPARALLED KNOWLEDGE OF GERALTON CAMP MANAGEMENT Incentivized & Seasoned Adam Horne CEO Leadership Tom Rowcliffe CFO Thanos Pythagoras Financial Controller Reda Jalabi IR & Corp. Development Local Knowledge: Hardrock Senior Geo Team + Ex COO of Centerra
Slide 17: Capital Structure
CAPITAL STRUCTURE CAPITAL STRUCTURE SHAREHOLDER BASE INSTITUTIONAL HOLDERS Shares Issued & 153.8 M Crescat 6.1% Outstanding Other Insiders 9.6% Warrants 38.8 M Retail / (@ avg C$0.24) Family High Net 51.0% Worth Options 11.5% 9.3 M (@ avg C$0.16) Fully Diluted Shares 201.8 M Institution al 21.8% C$2
Slide 18: Summary Recap
SUMMARY-RE CAP • “Donut hole" surrounded by and on strike with Greenstone Mine • Greenstone Mine-to be 3rd or 4th largest Canadian gold mine being built “CLOSEOLOGY” PLAY IN on door-step WORLD CLASS GERALDTON • Mining H2 2022 CAMP • Gold pouring latter half 2024 • Produce 400,000oz Au per annum duri
Slide 19: Contact
Adam Horne Reda Jalabi TSX-V: TBLL Chairman & CEO Corp. Development & IR OTCQB: TBLLF Office: +1 647 493 8270 Office: +1 647 493 8270 Mobile: +44 (0) 7768 258 126 Mobile: +44 (0) 7899 870 533 adam@tombillmines.com reda@tombillmines.com 26 Grosvenor Gardens London , SW1W 0DH, UK Office: +44 (0) 207 5
Slide 20: Appendix
TSX-V: TBLL OTCQB: TBLLF APPENDIX WWW.TOMBILLMINES.COM 20 | TBLL
Slide 21: Tombill Org Chart
TOMBILL ORG CHART BOARD OF DIRECTORS ADVISORY BOARD Ray Davies Mark Colman Gordon Reid Ian Stalker Director Director Ex-COO of Centerra Founder, ex-CEO K92 Adam Horne Giuseppe Ciardi John Alexander CEO , COB Quinton Hennigh Director Director Crescat FINANCE, CORPORATE, IR EXPLORATION, GEOLOGY Dave L
Slide 22: Management, BOD & Advisory Board
MANAGEMENT, B OD & ADVISORY BOARD Adam Horne – Chairman & CEO Dr. Quinton Hennigh – Advisory Board Adam is Managing Partner of Caledon Partners, a hedge fund based in London. Prior, he ran Quinton is an eco geologist with 25 years of exploration experience and founder, Chmn and the European Media In
Slide 23: History of Tombill Mines & Geraldton Gold Camp
HISTORY OF TOMBILL MINES & GERALDTON GOLD CAMP FROM 1930’S, CAMP EMERGES. PRODUCING DORMANT FROM 1970 UNTIL ANTICIPATED 2024. RE-EMERGENCE OF SERIOUS EXPLORATION FROM 2008 1938-42, 1955 1948-74 1979 1982 Jan 2021 June 2021 Dec 2020 Sporadic TB21-005A: Establish Mining of the Tombill EM30 Airborne su
Tombill Mines — Investor Presentation (December 2021) on 6ix