Table of contents 1. Update on the electricity sector reform 2. 9M 2013 key highlights 3. Group financial information 4. Conclusions 9M 2013 Results Presentation 3
Slide 4: 1. Update on the electricity sector reform
1. Update on the electricity sector reform
Slide 5: Update on the electricity sector reform (i)
Update on the electricity sector reform (i) Regulatory visibility to improve towards year-end: it is expected that the Electricity Sector Act and the new framework for renewables (in the form of a Royal Decree) will be approved before year-end A Ministerial Order containing the standards and the out
Slide 6: Update on the electricity sector reform (ii)
Update on the electricity sector reform (ii) Not possible to indicate a range of outcomes: providing a reasonable range of potential impacts for ACCIONA remains impractical and imprudent 9M 2013 figures contain no adjustment for new regulation since 14 July given impossibility of a reliable calculat
Slide 7: 2. 9M 2013 key highlights
2. 9M 2013 key highlights
Slide 8: 9M 2013 key highlights
9M 2013 key highlights (€m) % Chg. Revenues 4,951 -4.2% EBITDA 964 -7.3% EBT 82 -51.5% Ordinary capex 310 -48% NFD (vs Dec 12) 7,373 -1.5% Construction backlog 5,917 -18% Water backlog: D&C¹ 548 -9% O&M² 10,522 +153% 1 Design and Construction 2 Operation and Maintenance services 9M 2013 Results Pres
Slide 9: 3. Group financial information
3. Group financial information
Slide 10: P&L: Key figures
P&L: Key figures Jan-Sep 12 Jan-Sep 13 Chg. Chg. €m €m €m % Revenues 5,165 4,951 -215 -4.2% EBITDA 1,040 964 -76 -7.3% D&A and provisions -527 -584 -57 10.7% Results on impairment / reversal of assets -15 1 16 n.m. Results on non current assets disposals and 11 36 25 n.m. other gains and losses EBIT
Slide 11: Capex by division
Capex by division Capex breakdown Key highlights By division (€m) Capex Significant 48% ordinary capex Jan-Sep 12 Jan-Sep 13 reduction to €310m Energy 322 166 Core areas capture most of 9M 2013 Infrastructure 259 147 capex: Water 14 25 − Infrastructure: Capex down by 43%. Diversified in various Serv
Slide 12: Debt breakdown by division and nature
Debt breakdown by division and nature Net debt breakdown Gross debt breakdown By division By nature (€m) Net Debt Net Debt 31-Dec-12 30-Sep-13 34% Non recourse Energy 6,086 5,578 66% Recourse Infrastructure 225 454 Water 77 107 Service 42 29 €8,985m Other Activities 1,052 1,205 (Million Euro) 30-Sep
Slide 13: Net debt evolution
Net debt evolution Net debt reconciliation 9M 2013 (€m) Debt associated 727 402 to work in progress 425 Derivatives 577 6,178 6,546 Debt associated to Derivatives work in progress 9M 2013 Results Presentation 13
Slide 14: Debt amortization schedule
Debt amortization schedule Principal repayment schedule 2013-2017 (€m)¹ Undrawn corporate credit lines of €0.8bn ¹ Excludes bilateral credit policies, project bridge financing and real estate development loans Note: Repayment schedule during the period to December 2017 9M 2013 Results Presentation 1
Slide 15: Energy: Key figures
Energy: Key figures Key figures Key highlights Attributable production up 12%: increased capacity in (Million Euro) Jan-Sep 12 Jan-Sep 13 Chg. Chg. (%) LTM (+105MW) and higher national wind and hydro load factors vs. 9M 2012, partially offset by lower Revenues 1,590 1,627 37 2.3% solar and internati
Slide 16: Energy: Installed capacity and under construction
Energy: Installed capacity and under construction Installed MW @ Sept 2013 9M 2013 Attributable production Wind Spain 6.8TWh +7% MW (Total) Spain Internat. Total Wind Inter. 4.5TWh +0.3% Wind 4,743 2,416 7,159 Hydro 2.4TWh +87% Conventional Hydro 681 - 681 Solar 0.5TWh -8% Hydro special regime 231 -
Slide 17: Infrastructure: Key figures and backlog
Infrastructure: Key figures and backlog Key figures Construction backlog Sept 2013 (Million Euro) Jan-Sep 12 Jan-Sep 13 Chg. Chg. (%) International 52% Revenues 2,415 2,048 -367 -15.2% Spain EBITDA 123 100 -23 -18.8% 48% Margin (%) 5.1% 4.9% €5,917m International backlog Sept 2013 Key highlights By
Slide 18: Infrastructure: Concessions
Infrastructure: Concessions Road Rail Canal Port Hospital Total # of concessions 12 3 1 1 5 22 EBITDA 9M 2013 (€m) 26 0 2 0 14 38¹ 3 Average life (yrs) 33 32 30 30 30 33 Average consumed life (yrs) 3 6 7 7 8 6 6 Equity: €416m Invested capital (€m) 1,360 72 62 17 212 1,799² Net debt4: €1,383m Canada
Slide 19: Water
Water key figures Water backlog (€m) (Million Euro) Jan-Sep 12 Jan-Sep 13 Chg. Chg. (%) Revenues 342 415 73 21.4% (€548m) D&C¹ EBITDA 25 31 6 25.4% Margin (%) 7.2% 7.4% Spain (12%) International (88%) Key highlights Water revenues and EBITDA up 21.4% and 25.4% respectively helped both by D&C and O&M
Slide 20: Service and Other Activities
Service and Other Activities Service: key figures Key highlights (Million Euro) Jan-Sep 12 Jan-Sep 13 Chg. Chg. (%) ACCIONA Service includes: facility services, airport handling, waste management, logistic Revenues 442 473 30 6.9% services and other Revenues up ~7% to €473m mainly helped by EBITDA 1
Slide 21: 4. Conclusions
4. Conclusions
Slide 22: Conclusions
Conclusions Results negatively impacted by Law 15/2012 and RD-L 2/2013 energy regulatory changes €137m 9M 2013 results do not reflect major impact from RD-L 9/2013 Impact of the new renewables regulation continue to be neither possible nor prudent to estimate Significant capex reduction Ordinary cap