Metals Exploration Plc · LSE:MTL

Metals Exploration — Philippines Mining & Exploration Association presentation (July 2016)

29 slides from Metals Exploration's conference presentation, July 2016

  1. Slide 1: Runruno Project – July 2016

    fcf® metals Runruno Project — July 2016 minerals exploration

  2. Slide 2: Important Notice

    IMPORTANT NOTICE This presentation has been prepared by the management of Metals Exploration Plc for the benefit of the investing community including, brokers, fund managers, investors and analysts and not for the benefit of any particular person. It should be read in conjunction with information pr

  3. Slide 3: Philippine Focussed – In Production

    PHILIPPINE FOCCUSSED – IN PRODUCTION SHARE CAPITAL (31 May 2016) KEY SHAREHOLDERS - % HOLDING (31 May 2016)  Issued ordinary shares 1,731,305,881  MTL Luxembourg 47.73%  Unlisted options 7,235,000  Runruno Holdings 19.35%  Ruffer 11.59% PROJECT FUNDING  Baker Steel 8.47%  Shareholder equity $

  4. Slide 4: Runruno Gold Project – Snapshot

    RUNRUNO GOLD PROJECT – SNAPSHOT  Runruno 100% owned - Philippine gold mining project  FCF Minerals Corporation – wholly owns subsidiary owns and operates Runruno Ian Holzberger President, Atty Roderick Salazar Secretary and Director, Atty Karl Castillo, Tim Dean and Craig Watkins Directors  Finan

  5. Slide 5: Current Status

    CURRENT STATUS  First Gold poured - commissioning and ramp-up  Processing plant fully constructed  Mine developed, ore on stockpile and exposed in pit floor  Residual storage impoundment (tailing storage) – stage 2 complete, stage 3 ongoing, receiving tailings • Runruno  Workforce in establishe

  6. Slide 6: Regional Location

    REGIONAL LOCATION Airfield – Bagabag airfield 10 kms north of Solano Road – upgraded – largely concrete. Power supply – switch yard in Bayombong will be the origin for the new 69Kv line to site, running along 5 km the new road • Runruno Project 6

  7. Slide 7: Project Description

    PROJECT DESCRIPTION Five key components:  Mine Open Pit and Run of Mine (ROM) Pad  Process Plant facility consisting of conventional crushing, grinding, flotation, along with BIOX® and gravity recovery  Residual Storage Impoundment (RSI): to ensure materials are properly managed and to reclaim wa

  8. Slide 8: Mining

    MINING  Open pit area - 600m x 1,500m  1.75 Mtpa ore - transported by conveyor to the Process Plant  9.1 Mtpa overburden - used for the construction of the Tailings Storage Facility and in-pit backfill  During the first three years, waste material will be used in the construction of the Residual

  9. Slide 9: Processing

    PROCESSING  Gold circuit demonstrated initially by extensive test-work including 20t pilot plant  Mini lab established at site to train operators, adapt bacteria and establish commissioning stocks and for process development – 15 months operation  Circuit  Gravity recovery – 30% of gold  Total

  10. Slide 10: Resources and Reserves March 2011 & April 2013

    RESOURCES AND RESERVES March 2011 & April 2013 Runruno Main Ore Gold Molybdenum Reserve Category Mt g/t M Oz ppm M lbs Proven 10.2 1.90 0.62 616 13.9 Probable 4.8 1.77 0.27 414 4.4 2P Reserves 15.0 1.85 0.90 603 18.3 Additional Inferred 2.9 1.73 0.16 258 1.7 Resource in-pit Ore Gold Molybdenum Resou

  11. Slide 11: Workforce

    WORKFORCE Site Workforce  Site workforce 700 employees including 8 expatriates  Equal opportunity employer  Local employment focus +80% of workforce  Workforce a mix of experienced and Company trained  Large ongoing training program in co-operation with TESDA (Gov. Agency) Experienced Senior Op

  12. Slide 12: Corporate Social Responsibility

    CORPORATE SOCIAL RESPONSIBILITY  Environment Protection and Enhancement  Environmental monitoring  Slope stabilisation and rehabilitation of disturbed areas  Forest regeneration  Multiple award winner  Communication Information and Education  To shape desirable social opinion about the compan

  13. Slide 13: Corporate Social Responsibility

    CORPORATE SOCIAL RESPONSIBILITY Education & Training Scholarships and assistance Adopt a school programme Out of work youth skills training programmes Teachers salaries Mature age learning programs Health & Nutrition Education Provision of a professionally staffed clinic including doctor and

  14. Slide 14: Capital Cost Breakdown

    CAPITAL COST BREAKDOWN $US million Mine establishment including fleet 18.4 Process Plant 85.7 Residual Storage Impoundment 28.0 Onsite Infrastructure 13.7 Offsite Infrastructure 3.8 Indirect Costs 14.0 Owners Costs 32.2 Total Construction Cost $US 195.8 million VAT (under claim) 7.3 Initial Spares 2

  15. Slide 15: Operating Cost

    OPERATING COST Annual operating cost guidance $US million Mining 12 Processing 23 Site Services & General Maintenance 4 Safety and health and Environment 2 Site Administration, Community and land 6 Contingency 3 Total Cash Operating Cost $US 50 million (5 yr Ave. $US 474 / oz. Au) Operating Cost adv

  16. Slide 16: Photographic Update

    fcf® meta minerals exp 3) oration PHOTOGRAPHIC UPDATE 16

  17. Slide 17: RSI – Stage 2 Wall

    ‘cf@ metals ® RSI-STAGE2WALL i (ssti“‘<‘Sé;S!OCmineral XD

  18. Slide 18: Tailing and Return Water Pipeline

    TAILING and RETURN WATER PIPELINE 18

  19. Slide 19: Mine Development – RSI in Background

    MINE DEVELOPMENT – RSI in BACKGROUND 19

  20. Slide 20: Mine Development – Ore Blocks Exposed

    MINE DEVELOPMENT – ORE BLOCKS EXPOSED 20

  21. Slide 21: Mine Development – Looking North

    MINE DEVELOPMENT – LOOKING NORTH 21

  22. Slide 22: Process Plant – From Mine Pit

    PROCESS PLANT – FROM MINE PIT 22

  23. Slide 23: Mine from Processing Plant

    MINE from PROCESSING PLANT 23

  24. Slide 24: Crushing, Flotation, Grinding, CIL, BIOX

    CRUSHING, FLOTATION, GRINDING, CIL, BIOX 24

  25. Slide 25: Grinding and Gravity, Heavy Vehicle Workshop in Background

    GRINDING and GRAVITY, HEAVY VEHICLE WORKSHOP in BACKGROUND 25

  26. Slide 26: Neutralisation, CCD, BIOX

    NEUTRALISATION, CCD, BIOX 26

  27. Slide 27: Busy Bugs

    re A) 6S BUSY BUGS mi Sb rals metals oration ’

  28. Slide 28: Gold Room

    fcf metals GOLD ROOM minerals exploration _ L_}

  29. Slide 29: First Gold Pour

    FIRST GOLD POUR fcf minerals meta exp ISration 29

Metals Exploration — Philippines Mining & Exploration Association presentation (July 2016) on 6ix