Equus Mining — Corporate Update (April 2017)
16 slides from Equus Mining's corporate update, April 2017
Slide 1: Los Domos Gold-Silver Project Update
For personal use only Los Domos Gold-Silver Project Update Drilling targeting high grade gold-silver epithermal mineralisation in a world class geological terrain & mining jurisdiction ASX Code: EQE April 2017
Slide 2: Disclaimer and Compliance
Disclaimer and Compliance For personal use only • This presentation has been prepared by Equus Mining Limited ABN 44 065 212 679 (“Equus”). The information contained in this presentation is a professional opinion only and is given in good faith. Certain information in this document has been derived
Slide 3: Equus Mining Limited Profile
Equus Mining Limited Profile For personal use only ASX Code: EQE Ordinary Shares: 578M Share Price: 1.2 cents Market Capitalisation: $7M Top 20 Shareholders: 52% Major Shareholders Norm Seckold 11%, Ted Leschke 6%, Mark Lochtenberg 4% Equus Mining’s Board: Mark Lochtenberg, Chairman Ted
Slide 4: Gold-Silver Project – Drill Ready
Los Domos Gold-Silver Project – Drill Ready Los Domos gold-silver project comprises 4,100 hectares, 15km south of Recent field work has confirmed the Los For personal use only township Chile Chico, in Chile’s XI Region Domos exploration target model - extensive Well located – local infrastruct
Slide 5: Hosted within the Deseado Massif
Los Domos – hosted within the Deseado Massif For personal use only Los Domos epithermal gold-silver mineralisation hosted by the Jurassic age Ibanez Formation Part of the package of Jurassic age volcanic rocks that form the Deseado Massif Includes the Santa Cruz mining province in Argentina an
Slide 6: Gold-Silver Project – Drill Ready
Los Domos Gold-Silver Project – Drill Ready For personal use only Structurally Controlled Epithermal Gold-Silver Mineralisation Structural corridors host chalcedonic - saccaroidal quartz veins and hydrothermal breccias in large scale faults- all untested by drilling Graben Significant high grade
Slide 7: Los Domos Drill Target Definition
T1 Structure Prospect Drill Target Average elevation: 1065 Strike length: Average sample grade430m : 15.02 g/t AuEq Los Domos Drill Thickest vein width observed at surface: 2.0m T2 Structure Prospect Drill Target For personal use only Average elevation: 1138 Target Definition Strike length: 25
Slide 8: T1 Drill Target Section
1000m 1100m 1200m 800m 900m For personal use only 0.40 @ 26.01 (5.67, 1340) 0.20 @ 25.36 (8.06, 1140) NNW 0.40 @ 44.09 (10.85, 2190) 0.40 @ 111.4 (81.10, 1996) 0.40 @ 36.18 (32.73, 227 0.40 @ 55.63 (50.68, 326) 0.33 @ 9.31 (2.81, 428) 0.50 @ 4.09 (1.31, 183) 0.40 @ 9.38 (3.52, 86) 0.78 @ 8.00 (2.38,
Slide 9: T1, T2 & T4 Structure Prospects' Interpreted Controls on Mineralisation
Los Domos T1, T2 & T4 Structure Prospects’ Interpreted Controls on Mineralisation For personal use only Conceptual Cross Section of 3.5km long Graben Structure 9
Slide 10: T1 & T2 Structure Prospects' Interpreted Lithological Controls on Quartz Vein Development
Los Domos T1 & T2 Structure Prospects’ Interpreted For personal use only Lithological Controls on Quartz Vein Development 10
Slide 11: Longitudinal Sections of T7 and T8 Structural Prospects
Longitudinal Sections of T7 and T8 Structural Prospects Showing Vertical Epithermal Zonation For personal use only NNW SSE N S Average grade 7.59 g/t AuEq 851ppm As, 32ppm Sb Parallel veins with high Multiple veins with high 336ppm As, 5ppm Sb 486ppm As, 7ppm Sb 383ppm As,6ppm Sb 0.20 @ 40.92 (36.10
Slide 12: Longitudinal Section of T5 Structural Prospect
Longitudinal Section of T5 Structural Prospect For personal use only Showing Vertical Epithermal Zonation N Veins with high S 815ppm As, 313ppm Sb 346ppm As, 73ppm Sb 351ppm As, 30ppm Sb 147ppm As, 37ppm Sb 313ppm As, 35ppm Sb 84ppm As, 76ppm Sb 79ppm As, 31ppm Sb 47ppm As, 46ppm Sb 17ppm As, 37ppm
Slide 13: Gold-Silver Project – Drill Ready Summary
Los Domos Gold-Silver Project – Drill Ready Summary For personal use only Well located – local infrastructure, good access, low altitude and moderate climate. Local economy is 80% mining Diamond saw channel sampling and mapping results have confirmed the exploration target model via understandin
Slide 14: Gold-Silver Project Target
Los Domos Gold-Silver Project Target For personal use only Targeting 0.6Moz to 1.4 Moz gold equivalent (equivalent to 41Moz to 96Moz silver)* * Based on an existing extensive geologic database which, where able, has been correlated within reasonable variability by the Company’s exploration results.
Slide 15: Appendix I - Acquisition and Competent Person Statement
Appendix I - Los Domos Gold-Silver Project Acquisition and Competent Person Statement For personal use only Los Domos Gold-Silver Project Acquisition Los Domos gold-silver project comprises 4,100 hectares of mining and exploration licences, located in Chile’s XI Region. Equus has rights to acqui
Slide 16: Appendix II - References and Metal Equivalent Calculations
Appendix II - References and Metal Equivalent Calculations For personal use only (i)All the material assumptions underpinning exploration results for sample numbers LD00001 to LD00102 are outlined in Table 1 and Appendix 1 in the initial public report titled Los Domos Gold-Silver project (see ASX re