Agl Energy — Corporate Update (July 2017)
55 slides from Agl Energy's corporate update, Jul 27, 2017
Slide 1: Silverton Wind Farm Community Consultative Committee
Silverton Wind Farm Community Consultative Committee Meeting No.CCC-023 Thursday, 27 July 2017
Slide 2: Agenda
Agenda 1 2 3 4 5 6 Welcome Previous Project update Community Topics of interest Other minutes • Overview relations • Visual impact business assessment • Wind Farm Works update • Horses and wind • Connection Works farms Silverton Wind Farm | 27 July 2017 2
Slide 3: 1. Welcome
aha oS a = a 1. Welcome
Slide 4: 2. Previous minutes
2. Previous minutes
Slide 5: Action items
2. Previous minutes Action items Item Action Status Who 5.19.01 AGL to arrange site tour for interested Silverton community Open KL – 5/17 members and the Broken Hill City Council. 5.20.03 AGL is continuing to seek information from the horse stud Open AGL – 7/17 farm and riding centre which has the
Slide 6: 3. Project update
• Overview • Wind Farm Works • Connection Works 3. Project update
Slide 7: Silverton Wind Farm
3. Project update Silverton Wind Farm Silverton Wind Farm • Located in the Barrier Ranges approximately 5km north of the Silverton township • Generation capacity of 200 MW • Wind turbines: 58 x GE 3.43-130 • Annual Energy Production (AEP) - ~780,000 MWh (capacity factor of 44.5%) - Powering more tha
Slide 8: Scope of works
3. Project update Silverton Wind Farm Scope of works • Silverton Wind Farm consists of two main scope of work: - Wind Farm Works (GE-CATCON) - Connection Works (TransGrid) • AGL has prepared an Overview Environmental Management Strategy (OEMS) in accordance with the project approval • Overview activ
Slide 9: Wind Farm Works
3. Project update Silverton Wind Farm Wind Farm Works • GE-CATCON (joint venture) has been engaged to deliver the wind farm works - Engineer, Procure, Construct (EPC) Contract • Scope of works, includes - 58 x GE 3.43-130 wind turbines - 33kV electrical reticulation (underground and overhead) and 33
Slide 10: Connection Works
3. Project update Silverton Wind Farm Connection Works • TransGrid (Network Services Provider) has been engaged to deliver the connection works for the wind farm - Project Agreement (construction) • Scope of works, includes - Wind farm 220kV substation - ~25km of 220kV transmission line - New circui
Slide 11: Construction works
3. Project update Wind Farm Works Construction works • GE-CATCON has progressed the following construction works: - Access road to the wind farm 220kV substation has been completed - Cleared ~20km of access roads - Bulk earthworks for the 220kV wind farm substation bench and adjacent 33kV switchyard
Slide 12: Construction works progress photos
3. Project update Wind Farm Works Construction works • Progress photos Silverton Wind Farm | 27 July 2017 12
Slide 13: Onsite Rock and Sand Quarries
3. Project update Wind Farm Works Onsite Rock and Sand Quarries • Preliminary geotechnical investigations were complete to determine potential quarry locations within the southern portion of the wind farm. • Extractive licences were obtained for two rock quarries and one sand query (refer to map) in
Slide 14: Road Upgrade and Maintenance Strategy
3. Project update Wind Farm Works Road Upgrade and Maintenance Strategy • GE-CATCON has revised the Road Upgrade and Maintenance Strategy (revision 2) to incorporate the alignment assessment along Silverton Road. • The Road Upgrade and Maintenance Strategy forms the basis of the external roadworks,
Slide 15: Road Upgrade and Maintenance Strategy
3. Project update Wind Farm Works Road Upgrade and Maintenance Strategy • Two pull over bays at approx. 5km apart on Silverton Road between Daydream Mine Road and the Bypass Road. Silverton Wind Farm | 27 July 2017 15
Slide 16: Road Upgrade and Maintenance Strategy
3. Project update Wind Farm Works Road Upgrade and Maintenance Strategy • Survey of all floodways along Silverton Road (between Broken Hill and Daydream Mine Road) has been completed to ensure safe movement of over dimensional loads to and from Silverton Wind Farm site. The assessment has confirmed
Slide 17: Road Upgrade and Maintenance Strategy
3. Project update Wind Farm Works Road Upgrade and Maintenance Strategy • Short bypass (Silverton Road intersection) Silverton Wind Farm | 27 July 2017 17
Slide 18: Traffic Management Plan
3. Project update Wind Farm Works Traffic Management Plan • GE-CATCON has revised the Traffic Management Plan (revision 3) to incorporate comments from RMS and the Silverton Village Committee. • Key amendments to the TMP are shown below: - Alternate (Western) Access Route will only be used for emerg
Slide 19: Industry Briefing
3. Project update Wind Farm Works Industry Briefing • AGL together with GE-CATCON conducted an industry briefing on Tuesday, 31 January 2017 at Silverton and Broken Hill • Employment opportunities - Up to 150 jobs during the peak of construction - Up to 10 full time jobs during the operations phase
Slide 20: Local suppliers
3. Project update Silverton Wind Farm Local suppliers • Delivery of the Silverton Wind Farm to date has involved the following local suppliers / contractors - Attards Transport - Lawrence Engineering - Avis - Mawsons Concrete & Quarries - Barrier Daily Truth - My Maid Support - Boss Construction - R
Slide 21: Type wind turbine – GE 3.43-130
3. Project update Wind Farm Works Type wind turbine – GE 3.43-130 • Type Wind Turbine is installed in Wieringermeer, Holland (shown in photo). • Nameplate of 3.43 MW with a 130m rotor and hub height of 110m • The 3MW platform machines are an evolution of the 2.5MW turbine, developed in 2004. • The G
Slide 22: Wind turbine GE 3.43-130
3. Project update Wind Farm Works Wind turbine GE 3.43-130 • Inside the GE 3.43-130 wind turbine Silverton Wind Farm | 27 July 2017 22
Slide 23: Turbine Manufacturing
3. Project update Wind Farm Works Turbine Manufacturing • Wind Turbine - Manufactured in Germany - Consists of the Nacelle, Hub and electrical equipment which forms the Down Tower Assembly - Subcomponents are being purchased and transported to the GE assembly factory. Assembly of these components is
Slide 24: Connection Works – TransGrid presentation
3. Project update Connection Works TransGrid presentation Silverton Wind Farm | 27 July 2017 24
Slide 25: Existing 220kV Substation
3. Project update Connection Works Existing 220kV Substation • The Point of Connection (POC) for the Silverton Wind Farm will be in TransGrid’s existing 220kV substation in Broken Hill. • The scope of works includes: - Foundations for electrical equipment / bay. - 220kV circuit breaker and associate
Slide 26: Existing 220kV Substation Progress Update
3. Project update Connection Works Existing 220kV Substation Progress Update CPP Mobilisation to Broken Hill Substation – early August 2017 Location of new 220kV switch bay Location of the new 220kV Switchbay Silverton Wind Farm | 27 July 2017
Slide 27: Existing 220kV Substation Look Ahead
3. Project update Connection Works Existing 220kV Substation Look Ahead Detailed Civil Works – early August 2017 High Voltage Equipment fit-out – late September 2017 Silverton Wind Farm | 27 July 2017
Slide 28: 220kV Transmission Line
3. Project update Connection Works 220kV Transmission Line • The Silverton Wind Farm is connected to the National Electricity Market (NEM) via the ~25km of 220kV transmission line to the Point of Connection (POC). • The scope of works includes: - Single galvanized steel poles and associated footings
Slide 29: 220kV Transmission Line Progress Update
3. Project update Connection Works 220kV Transmission Line Progress Update TransGrid and its contractor CPP-NJ completed barricading identified Heritage and biodiversity constraints along the transmission line route. Silverton Wind Farm | 27 July 2017
Slide 30: 220kV Transmission Line Progress Update
3. Project update Connection Works 220kV Transmission Line Progress Update Known Aboriginal heritage site near the Silverton Wind Farm substation barricaded Other activities completed: Pole location survey and pegging - completed Silverton Wind Farm | 27 July 2017
Slide 31: 220kV Transmission Line Look Ahead
3. Project update Connection Works 220kV Transmission Line Look Ahead • Easement clearing – early August 2017 • Transmission Line Footing Foundations – late August 2017 Silverton Wind Farm | 27 July 2017
Slide 32: 220kV Wind Farm Substation
3. Project update Connection Works 220kV Wind Farm Substation Scope of Works • The Silverton Wind Farm generation Typical Secondary will be transmitted to the 220kV Systems Building (SSB) network of TransGrid via the 220kV wind farm substation with a step up transformer from 33kV to 220kV. • The sco
Slide 33: Silverton 220kV Substation Progress Update
3. Project update Connection Works Silverton 220kV Substation Progress Update Silverton Wind Farm Substation Bench Completed Silverton Wind Farm | 27 July 2017
Slide 34: Silverton 220kV Substation Progress Update
3. Project update Connection Works Silverton 220kV Substation Progress Update Silverton Wind Farm Substation Bench Completed Silverton Wind Farm | 27 July 2017
Slide 35: Silverton 220kV Substation Progress Update
3. Project update Connection Works Silverton 220kV Substation Progress Update CPP mobilised to site – completed site establishment Silverton Wind Farm | 27 July 2017
Slide 36: 220kV Wind Farm Substation Look Ahead
3. Project update Connection Works 220kV Wind Farm Substation Look Ahead • Civil works for drainage system, road works and transformer bund – early August 2017 • Substation Fence – late August 2017 • High Voltage Equipment footings – mid September 2017 Silverton Wind Farm | 27 July 2017
Slide 37: Connection Works feedback
3. Project update Connection Works • We are excited to support AGL in delivering this great project and committed to do so in a manner that minimises landowner and community disruption and inconvenience. • To ensure we are able to address your concerns for the project - we welcome your feedback. • I
Slide 38: 4. Community relations update
4. Community relations update
Slide 39: Community Enhancement Program
4. Community relations update Community enhancement program Community Enhancement Program AGL will prepare a Community Enhancement Program for the Silverton Wind Farm within 6 months of the commencement of construction, in accordance with condition 18 (schedule 2) of the project approval. • Silverto
Slide 40: Silverton Community Fund
4. Community relations update Community enhancement program Silverton Community Fund • AGL’s corporate community investment program consists of activities that span community Silverton investment and benefit sharing residential • Supporting local community initiatives, projects and and events busine
Slide 41: Silverton Community Fund
4. Community relations update Community enhancement program Silverton Community Fund AGL Values Focus Area Example Inclusive Diversity, inclusion and human rights Partnerships which create opportunities for harnessing our diversity and enriching cultural experiences Safety Healthy lifestyle & wellbe
Slide 42: Solar Silverton Program
4. Community relations update Community enhancement program Solar Silverton Program • AGL has completed preliminary consultation with Silverton residents - Apr-May 2017 • AGL Solar has completed desktop assessment of local capability - Four local Clean Energy Council (CEC) accredited installers - AG
Slide 43: Water Tank Program
4. Community relations update Community enhancement program Water Tank Program • AGL has progressed quotes for water tanks with potential supplier and installers (plumbers) • AGL will need to arrange for property inspections to assess the following: - Structural ground condition - Connection roo
Slide 44: Mobile Reception Program
4. Community relations update Community enhancement program Mobile Reception Program • AGL has been working with Telstra on mobile reception coverage options in Silverton, and have identified a 4GX solution - Installation of a 20m monopole at Telstra’s Silverton Exchange site with a 4GX small cell w
Slide 45: Mobile Reception Program
4. Community relations update Community enhancement program Mobile Reception Program • The coverage predications below provide and indicative view of the coverage the proposed 4GX small cell would provide • This solution is 4GX only, a 4GX (4G 700 MHz) compatible device will be required to benefit f
Slide 46: Visual Impact Mitigation
4. Community relations update Visual impact mitigation Visual Impact Mitigation AGL issued notification to the Silverton residents in accordance with condition 2 (schedule 3) of the project approval in relation to the visual impact mitigation measures outlined in condition 1 (schedule 3). • Owners w
Slide 47: Community engagement
4. Community relations update Community engagement Silverton Information Centre • AGL will be utilising the old butchers shop in Silverton during the construction of the wind farm to provide project information and updates Community information AGL contact details for community and project informati
Slide 48: 5. Topics of interest
• Blasting • Visual impact assessment • Horse and wind farms 5. Topics of interest
Slide 49: Site access road blasting
5. Topics of interest Site access road blasting Blasting GE-CATCON has undertaken low powder blast in accordance with condition 11 and 12 (schedule 3) of the project approval. • Similar to the daily 7:45pm blast in Broken Hill • Blast will be designed, monitored and recorded • Strict access controls
Slide 50: Visual impact assessment
5. Topics of interest Visual impact assessment Modification 3 • AGL has engaged Green Bean Design to prepare photo montages of the planned Silverton Wind Farm showing the 58 wind turbines – similar to the photo shown below. • Photo montages are planned to be prepared prior to the next CCC meeting in
Slide 51: Visual impact assessment
5. Topics of interest Visual impact assessment Silverton Wind Farm Green Bean Design will prepare photomontages from the following six locations (developed with the community): • Silverton township • Mundi Mundi lookout • Umberumberka House • Desert Sculpture (Living Desert) - Closer view than the L
Slide 52: Horses and wind farm
5. Topics of interest Horses and wind farm Delabole Wind Farm • Delabole Wind Farm was the UK’s first commercial wind farm, established in 1991. A horse stud farm and riding centre operates at the wind farm • Originally the wind farm consisted of 10 turbines, a few years ago these were replaced with
Slide 53: 6. Other business
6. Other business
Slide 54: Next meeting
Silverton Wind Farm Community Consultative Committee (CCC) • Next meeting - Thursday, 21 September 2017 - Time (TBC) - Silverton Municipal Chambers, Silverton Note: NSW school holidays from Sat, 23 September to Sun, 8 October 2017 Next meeting