Jindalee Lithium Limited · ASX:JLL
Jindalee Lithium — Jindalee Resources — Investor Presentation (September 2023)
27 slides from Jindalee Lithium's investor presentation, September 2023
Slide 1: Corporate Presentation
AUSTRALIA’S NEWEST IRON ORE PRODUCER Corporate Presentation September 2023
Slide 2: Disclaimer
Disclaimer This Presentation has been prepared by Jindalee Resources Limited (“Jindalee”, “Company” or “JRL”) and is authorised for release by its Executive Director, Mr Lindsay Dudfield. Certain information in this presentation has been derived from third parties and though Jindalee has no reason t
Slide 3: Introduction to Jindalee
Introduction to Jindalee Pure play US lithium company focused on progressing the globally significant, Tier 1 McDermitt lithium deposit Largest lithium deposit in the US: Significant Indicated + Inferred Mineral Resource (21.5Mt LCE) approximately 35km from Lithium Americas’ Thacker Pass Project (19
Slide 4: Company Overview
Company Overview Corporate Snapshot Share Capital (ASX:JRL, OTCQX:JNDAF) 57.4m Share Price 1 $1.71 Unlisted Options (from 40c to $5.00) 5.4m Market Capitalisation 1 $97.8m Cash 2 $2.3m Investments 3 $6.0m Debt Nil Enterprise Value $89.5m Major Shareholders 1. Share price as at 01/09/2023 2. Cash on
Slide 5: Directors & Management
Directors & Management Justin Mannolini • Justin has been a Non-Executive Director since 2013 Paul Brown • Paul has over 23 years’ experience in the mining industry, most Non Executive • Justin is a partner in the Corporate Advisory Group of Non Executive recently with Mineral Resources (ASX: MIN) w
Slide 6: Lithium Supply – Demand and the US
Lithium Supply – Demand and the US 6
Slide 7: Global Lithium Demand is Accelerating
Global Lithium Demand is Accelerating Forecast demand dominated by automotive industry – placing sustained pressure on lithium price Source: Albemarle (01/23) • Leading lithium producer Albemarle (NYSE: ALB) expects lithium demand to increase 5x by 2030 to 3.7Mt LCE pa, due to strong EV demand & Inf
Slide 8: Significant Supply Shortage Looming
Significant Supply Shortage Looming Looming supply shortage as electric vehicles aggressively drive the need for lithium. Source: Goldman Sachs (04/23), US Bureau of Transportation 8
Slide 9: A Lot More Lithium Production Is Required
A Lot More Lithium Production Is Required Many more lithium mines and plants are required to meet expected demand requirements by 2035 The McDermitt Lithium Project is one of many lithium operations which will fill the breach Source: Benchmark Mineral Intelligence 9
Slide 10: USA Battery Production Operating and Announced
USA Battery Production Operating and Announced
Slide 11: Strong Bipartisan Support for US Critical Mineral Projects
Strong Bipartisan Support for US Critical Mineral Projects Both sides of US politics expressing concern with the current dependence of the US on foreign sources of critical minerals (including lithium) In March 2022, Senator Wyden (Democrat, Oregon) introduced legislation to support processing and p
Slide 12: Inflation Reduction Act - US Critical Mineral Projects
Inflation Reduction Act - US Critical Mineral Projects On 16 August 2022 the Inflation Reduction Act (confirming $369B in funding to reduce carbon emissions by 40% by 2030) became law:¹ • from 2023 40% of EV’s battery materials must be sourced from the US (or FTA partners) to qualify for the EV tax
Slide 13: US Department of Energy Support for ASX-listed companies
US Department of Energy Support for ASX-listed companies The US Department of Energy (DOE) has recently supported a number of ASX-listed companies developing battery materials projects in the US, including: Project DOE grants / loans • US$102m loan for Vidalia initial expansion1 Syrah is building an
Slide 14: McDermitt Lithium Project
McDermitt Lithium Project 14
Slide 15: McDermitt Overview
McDermitt Overview Ownership • 100% owned by Jindalee Location • The Project is located in Malheur County located on the Oregon-Nevada border, ~35km west of the town of McDermitt at the northern end of the McDermitt volcanic caldera • ~35km from Lithium Americas’ Thacker Pass Project (19.1Mt LCE) wh
Slide 16: 2022 Drilling Program Highly Successful
2022 Drilling Program Highly Successful 2022 drilling (21 holes) across and outside McDermitt resource confirmed wide intercepts from shallow depths & excellent continuity Significant intercepts recorded from 20 holes: MDD025: 182.2m @ 1197 ppm Li from 21.4m MDRC024: 68.6m @ 1669 ppm Li from surface
Slide 17: 2023 McDermitt Resource = 21.5 Mt LCE
2023 McDermitt Resource = 21.5 Mt LCE McDermitt Mineral Resource (2023) Cut-off Indicated Resource Inferred Resource Indicated & Inferred Resource Grade (ppm Tonnage Li Grade LCE Tonnage Li Grade LCE Tonnage Li Grade LCE Li) (Mt) (ppm) (Mt) (Mt) (ppm) (Mt) (Mt) (ppm) (Mt) 1,000 1,470 1,420 11.1 1,54
Slide 18: Highly Encouraging Recent Metallurgical Results
Highly Encouraging Recent Metallurgical Results 2 main processing routes for sediment hosted Lithium deposits: 1. Acid Leaching (H2SO4 or HCl): Thacker Pass (LAC), Rhyolite Ridge (INR) 2. Alkali Salt (sulphation) Roasting: Sonora (Ganfeng) ….with excellent results achieved at McDermitt from both pro
Slide 19: MOU Signed with POSCO Holdings
MOU Signed with POSCO Holdings (NYSE:PKX) (POSCO) Non-binding MOU to undertake joint research to optimise lithium extraction at McDermitt POSCO (market cap US$33.4B) is a leading Korean company and lithium producer and supplier of cathode active materials to major US auto maker General Motors POSCO
Slide 20: Responsibility to the Local Environment
Responsibility to the Local Environment 20
Slide 21: Social Responsibility in the United States
Social Responsibility in the United States McDermitt is located on open rangeland in SE Oregon, administered by the Bureau of Land Management (“BLM”). The area is sparsely populated and has a long history of both ranching and mining. Jindalee takes its responsibility to the environment and the local
Slide 22: Comparable Sediment Hosted Lithium Deposits
Comparable Sediment Hosted Lithium Deposits Tonnes v Grade (contained LCE indicated by size of bubble) Jindalee is undervalued compared with our Peers COG Market Cap. Deposit Owner (ppm Li) (A$m) McDermitt ASX:JRL 1000 98 Sonora Ganfengº 1000 N/A Thacker Pass TSX:LAC 1047 4,530 Clayton Valley TSX:LC
Slide 23: Upcoming Milestones and Activity
Upcoming Milestones and Activity • Major Mineral Resource update announced Feb 2023 • MOU with POSCO announced Feb 2023 • Flowsheet optimisation underway (Fluor) • Exploration Plan of Operations (EPO) deemed complete by BLM May 2023 • PFS commenced June 2023, managed by Fluor; Study Manage
Slide 24: Additional Information
Additional Information Competent Person Statement References The Exploration Results and Mineral Resource estimates referred to in this presentation were first • 31/07/2023, “Quarterly Cashflow Report” and “Quarterly Activities Report” reported in accordance with ASX Listing Rules 5.7 and 5.8 in the
Slide 25: Appendix 1: Peer Comparison Data
Appendix 1: Peer Comparison Data Comparable North American Sediment Hosted Lithium Deposits Resource Grade Contained Deposit Owner Stage Resource Category Source (Mt) (ppm Li) LCE (Mt) Thacker Pass TSX:LAC FS Complete Measured, Indicated & 1,754 2039 19.1 Company website – Feasibility Inferred Study
Slide 26: McDermitt Caldera Sediment Hosted Lithium Deposits
McDermitt Caldera Sediment Hosted Lithium Deposits McDermitt trades at a significant discount to Thacker Pass Unit Jindalee Resources Ltd Lithium Americas Corp1 North American Sediment Hosted Lithium Asset Key Sediment Hosted Lithium Asset - McDermitt Thacker Pass Stage - PFS underway Feasibility Lo
Slide 27: For further information please contact: Lindsay Dudfield
For further information please contact: Lindsay Dudfield Executive Director and CEO Email: enquiry@jindalee.net Phone: +61 8 9321 7550
Jindalee Resources — Investor Presentation (September 2023) on 6ix