    EXPLORING GOLD IN AFRICA TSX-V : SPX | OTC : STLXF CORPORATE PRESENTATION JULY 2024

  2. Slide 2: Legal Disclaimer

    Slide 2: Legal Disclaimer

    LEGAL DISCLAIMER All information included in this presentation, including any information as to the Stellar AfricaGold Inc.’s (the ‘Corporation’) future performance, and other statements that express management’s expectations or estimates of future exploration success, other than statements of histo

  3. Slide 3: Stellar AfricaGold at a Glance

    Slide 3: Stellar AfricaGold at a Glance

    STELLAR AFRICAGOLD AT A GLANCE With a history of delivering gold discoveries, the board and management team are focusing on the exploration of the Tichka Est Gold Project in Morocco and expanding activities in Morocco and Côte d’Ivoire. Tichka Est Gold Project, MOROCCO Three contiguous permits cover

  4. Slide 4: Morocco Tichka Est Gold Project

    Slide 4: Morocco Tichka Est Gold Project

    MOROCCO TICHKA EST GOLD PROJECT Stellar is investing in the exploration and development of the Tichka Est Project in the Occidental High Atlas area in Morocco. Stellar will ultimately earn up to 90% of the project, and the remaining 10% will be held by ONHYM (*). The earn-in agreement is in the proc

  5. Slide 5: Gold Mineralization

    Slide 5: Gold Mineralization

    TICHKA EST GOLD MINERALIZATION • ZONE A • N350° trending gold structure extending over 450 meters along strike. • ZONE B • N80° trending gold structure extending over two-kilometer along strike. • ZONE C • E-W trending gold structure extending over two kilometer along strike. TSX.V : SPX | OTC : STL

  6. Slide 6: Zone A Best Trench Results

    Slide 6: Zone A Best Trench Results

    TICHKA EST ZONE A BEST TRENCH RESULTS • Best Trench results ⎼ Trench 1A: 0.97 g/t Au over 1 meters ⎼ Trench 2A: 3.36 g/t Au over 10 meters ⎼ Trench 3A: 1.18 g/t Au over 6 meters ⎼ Trench 4A: 1.80 g/t Au over 4 meters ⎼ Trench 5A: 1.85 g/t Au over 8 meters ⎼ Trench 6A: 2.70 g/t Au over 5 meters • Nex

  7. Slide 7: Zone B Best Trench Results

    Slide 7: Zone B Best Trench Results

    TICHKA EST ZONE B BEST TRENCH RESULTS • Best Trench results ⎼ Trench 1B: 2.21 g/t Au over 17 meters Gold hosted in Quartz-Oxide Gold hosted in Quartz- ⎼ Trench 2B: 4.55 g/t Au over 15 meters mineralisation Sulfide mineralisation ⎼ Trench 3B: 1.04 g/t Au over 5 meters ⎼ Trench 4B: 1.51 g/t Au over 3

  8. Slide 8: Zone C Best Trench Results

    Slide 8: Zone C Best Trench Results

    TICHKA EST ZONE C BEST TRENCH RESULTS • Best Trench results ⎼ Trench 1C: 2.08 g/t Au over 2 meters ⎼ Trench 2C: 5.81 g/t Au over 4 meters ⎼ Trench 3C: 3.14 g/t Au over 4 meters ⎼ Trench 4C: 0.92 g/t Au over 7 meters ⎼ Trench 7C: 3.18 g/t Au over 4 meters ⎼ Trench 10C: 2.55 g/t Au over 3 meters ⎼ Tre

  9. Slide 9: 9 km Access Road Completed from Analghi Village to Structure A and B

    Slide 9: 9 km Access Road Completed from Analghi Village to Structure A and B

    9 KM ACCESS ROAD COMPLETED FROM ANALGHI VILLAGE TO STRUCTURE A AND B TSX.V : SPX | OTC : STLXF 9

  10. Slide 10: First Drilling Campaign Results

    Slide 10: First Drilling Campaign Results

    TICHKA EST FIRST DRILLING COMPAIGN RESULTS • In the first 2022 campaign, 20 RC holes totaling 1,182 meters were completed. • Of the completed holes mineralization was encountered in five holes with significant intersections including • 3.71 g/t Au over 9 meters, • 3.03 g/t Au over 6 meters • 3.30 g/

  11. Slide 11: Photo of the Mechanical Trench Grading 3.5 g/t over 155.7 Meters

    Slide 11: Photo of the Mechanical Trench Grading 3.5 g/t over 155.7 Meters

    TICHKA EST PHOTO OF THE MECHANICAL TRENCH GRADING 3.5 G/T OVER 155.7 METERS Légende Mineralisation Piste Sondage Tranchée Tranchée a faire et a cartographier si non faite avec l'accès aux sondages 13 17 16 12 DIRECTION OF THE MECHANICAL TRENCH ➤ N Image © 2022 Maxar Technologies 300 m Image © 2022 M

  12. Slide 12: Key Takeaways from First Drill Campaign

    Slide 12: Key Takeaways from First Drill Campaign

    TICHKA EST KEY TAKEAWAYS FROM FIRST DRILL CAMPAIGN • As a result of ongoing exploration, the geological Ready to Drill Targets – Structure B model was revised and most holes were drilled sub- tes ion Fen xtens sée i d’e éral parallel to and not through the newly interpreted mi n mineralized structur

  13. Slide 13: Updated Drill Targets

    Slide 13: Updated Drill Targets

    TICHKA EST UPDATED DRILL TARGETS Skarn et intrusif schiste - Follow the depth extension of the sub-flat Intrusif et ou coulé and outcroping horizontal structures Skarn et Skarn et schiste schiste intercepted by drillholes TB2022r03 Intrusif et ou coulé (6m@2.27g/t) and TB2022r06 Zone de broyage (8m@

  14. Slide 14: Thank You

    Slide 14: Thank You

    THANK YOU CUMMING@STELLARAFRICAGOLD.COM LALONDEJF@STELLARAFRICAGOLD.COM HTTP://WWW.STELLARAFRICAGOLD.COM/ The technical content of this presentation has been reviewed and approved by Yassine Belkabir, MScDIC, CEng, MIMMM, a Stellar director and a Qualified Person as defined in NI 43-101. Auditor: Jo

Source: Internet Archive copy of stellarafricagold.com

More decks from Stellar AfricaGold, Inc.

All 17 Stellar AfricaGold decks