Esgold Corp · CSE:ESAU

Esgold — Investor Presentation (October 2026)

21 slides from Esgold's investor presentation, Oct 12, 2026

  1. Slide 1: Montauban Gold-Silver Project

    CSE: ESAU OTCQB: ESAUF FSE: Z7D MONTAUBAN GOLD-SILVER PROJECT A fully permitted, fully funded tailings to cash operation in Québec, Canada. Advancing toward near-term gold and silver production from historic tailings while advancing district-scale exploration potential Q3 2026

  2. Slide 2: Forward-Looking Statements

    FORWARD-LOOKING STATEMENTS This presentation contains certain statements that may be deemed “forward-looking statements”. All statements, other than statements of historical fact, that address events or developments that ESGold Corp. expects to occur, are forward-looking statements. Forward-looking

  3. Slide 3: Why ESGold Now?

    WHY ESGOLD NOW? ESGold offers a fully funded tailings reprocessing Strong, predictable cash-flow from tailings operation opportunity in Canada, with meaningful district- expected imminently scale exploration upside. Fully funded to commissioning and first gold/silver production The Montauban project

  4. Slide 4: Leadership Team

    LEADERSHIP TEAM ESGold is led by a team with deep operating, engineering, and capital markets experience in Canada’s mining sector. Collectively, the team brings decades of execution across permitting, construction, and mine operations: critical capabilities for a reprocessing project entering its p

  5. Slide 5: Capital Structure

    CAPITAL STRUCTURE As of Sept 2026 30% 25% Friends & Affiliates Issued & Outstanding 111,521,090 Family Offices Options Outstanding 5,494,000 Institutional Warrants 38,072,971* Management Fully Diluted Issued 155,088,007 & Outstanding Public Float 7% Avg Warrant Price: ~$0.72 30% 8% CSE: ESAU | OTCQB

  6. Slide 6: Montauban Project

    MONTAUBAN PROJECT Fully permitted and fully funded through to first doré pour Mill building completed for 1000 ton/day processing capacity Montauban is a fully permitted, fully funded tailings reprocessing project designed to produce Integrated 3D model identifies a mineralized corridor gold, silver

  7. Slide 7: Location

    LOCATION Located in Montauban Township, near Québec City and 80 km from Québec City Proximity to skilled labour Trois-Rivières, the project benefits from the following points. This combination enables one of the most cost 60 km from Trois-Rivières Mining-friendly jurisdiction effective reprocessing

  8. Slide 8: Infrastructure & Land Package

    INFRASTRUCTURE & LAND PACKAGE 20,000 SQ FT processing facility and laboratory 1.3 KM Mill building completed and project Of service hydropower advancing toward commissioning. Current capacity rated for 1000 tons per day. ALL-WEATHER Roads & site access ESGold controls a land position of 485 claims c

  9. Slide 9: Montauban Mine Past Production

    MONTAUBAN MINE PAST PRODUCTION 1913-1944* 1948-1955* 1983-1990 † tons zinc 77,000 39,600 - tons lead 24,000 15,600 - oz. gold 40,000 16,876 92,553 oz. silver 4,000,000 2,647,517 323,376 * Source : Jean Depatie for Boiville Ressources Ltd † Source : Genivar Inc. for MRNQ Anacon Shaft Entrance CSE: ES

  10. Slide 10: Tailings Drilling

    TAILINGS DRILLING Comprehensive drilling and verification work has been completed across the tailings zones. This dataset forms the basis for the 2025 NI 43-101 resource estimate and supports high confidence in tonnage and grade distribution. 352 drillholes 1,654 m total drilling 1,170 sampled inter

  11. Slide 11: Tailings Mineral Resources at Montauban – PEA 2025

    TAILINGS MINERAL RESOURCES AT MONTAUBAN – PEA 2025 The mineral resources estimate for the Montauban and Notre-Dame-de-Montauban Tailings Au (g/t) Ag (g/t) Tonnes Au Oz Ag Oz MONTAUBAN TAILINGS Indicated 0.4 31 603,700 7,800 610,350 Inferred 0.34 28 292,000 3,150 258,900 NOTRE-DAME-DE-MONTAUBAN TAILI

  12. Slide 12: Tailings Resource Summary

    TAILINGS RESOURCE SUMMARY The 2025 PEA defines a significant gold and silver resource within the Montauban tailings. Process the mine tailings in Notre-Dame-de-Montauban This inventory underpins the project’s near-term production profile and cash-flow potential. Effective Date: September 2025 Stop w

  13. Slide 13: Surface Pillar Resource Evaluation – Historical Report

    SURFACE PILLAR RESOURCE EVALUATION – HISTORICAL REPORT Pillars contain documented Limited Modern Exploration high-grade mineralization The Montauban deposit and surrounding Historical evaluations reported gold and silver surface pillars have not been evaluated using grades in both the North and Sout

  14. Slide 14: First ANT Model Defined Scale, New Model Sharpens Targeting

    FIRST ANT MODEL DEFINED SCALE NEW MODEL SHARPENS TARGETING The first 3D ANT model showed the system could extend far beyond the historic mine. The August 2026 update adds more data to determine where follow-up drilling should focus. WHAT THE FIRST MODEL UNCOVERED It identified a mineralized corridor

  15. Slide 15: Exploration and Drilling Program

    EXPLORATION AND DRILLING PROGRAM ESGold has commenced a 5,000 metre surface diamond drilling program across 29 proposed holes, focused primarily on the historic Montauban mine area. Drilling Program Underway Approximately 5,000 metres of surface diamond drilling 29 proposed drill holes Principal foc

  16. Slide 16: Parallel Phase Strategy

    PARALLEL PHASE STRATEGY Tailings production offers near term revenue potential while supporting exploration funding and minimizing dilution risk. THE CLASSIC LASSONDE CURVE SIMULTANEOUS DISCOVERY AND PRODUCTION Dashed line: classic Lassonde curve VALUE Drilling confirms VALUE Plant built, limited CA

  17. Slide 17: Work Completed to Date

    All major permits secured Building completed and major processing equipment arriving and being integrated WORK COMPLETED TO DATE Resource verification and metallurgical testing complete ESGold has invested over $20M into Expanded land package secured developing Montauban. The project is fully immedi

  18. Slide 18: Economics & Catalysts

    PEA ECONOMIC HIGHLIGHTS: ECONOMICS • 105% IRR (pre-tax) & CATALYSTS • $44.5M NPV (5%) pre-tax • <2-year payback • Strong margins driven by low energy and operating costs Tailings production provides near-term revenue potential while supporting exploration • Expanded ANT survey (~70 km²) and drill ta

  19. Slide 19: ESG and Full Cycle Value Creation

    ESG AND FULL CYCLE Montauban is designed as a tailings-to-products model that recovers precious metals while supporting VALUE CREATION environmental remediation and circular resource reuse. Environmental Remediation at the Core Montauban addresses legacy tailings from historic mining activity in the

  20. Slide 20: Investment Highlights

    INVESTMENT HIGHLIGHTS Near-term cash flow District-scale exploration upside now being tested Fully permitted tailings production provides a clear path to early revenue. 3D ANT modelling identified a mineralized corridor extending ~900 metres deep and over 2 kilometres along strike. A 5,000-metre dri

  21. Slide 21: Contact Us

    MONT AUBAN GOLD -SI LV ER P ROJE CT CONTACT US Tel: +1 (514) 712-1532 Tel: +1 (888) 370-1059 ir@esgold.com www.esgold.com CSE: ESAU OTCQB: ESAUF FSE: Z7D