Tlou Energy Ltd · ASX:TOU

Tlou Energy — Investor Presentation (October 2015)

30 slides from Tlou Energy's investor presentation, Oct 28, 2015

  1. Slide 1: Gas to Power in Botswana

    For personal use only “Gas to Power in Botswana” Admission to AIM and Placing of ordinary shares October 2015

  2. Slide 2: Disclaimer

    Disclaimer For personal use only These presentation slides and the accompanying verbal presentation (together the “Presentation Materials”) are confidential and have been issued in connection with the proposed placing of new ordinary shares (“Placing Shares”) in the capital of Tlou Energy Limited (t

  3. Slide 3: Disclaimer Continued

    Disclaimer Continued For personal use only Brandon Hill (“Brandon Hill”) is acting in the provision of corporate finance business to the Company, within the meaning of the Financial Conduct Authority’s Conduct of Business Sourcebook (“COBS”), and no-one else in connection with the proposals containe

  4. Slide 4: Disclaimer continued

    Disclaimer continued For personal use only To the fullest extent permitted by law, Integra Advisory Partners Pty Ltd (“Integra”) and Morgans Corporate Limited (“Morgans”), disclaim any obligation or undertaking to release any updates or revisions to the Presentation Materials to reflect any change i

  5. Slide 5: Transaction Overview

    Transaction Overview For personal use only  Target Listing on AIM – 30 November 2015  General Meeting required to approve placing  Placing minimum of £1.2m (A$2.6m), up to £1.5m (A$3.2m)  Current cash ~ A$2.2m (£1.0m)  Use of funds (based on minimum raise and current cash):  Gas production tes

  6. Slide 6: Company Snapshot

    Company Snapshot For personal use only  ASX Listed (Ticker TOU) ASX Trading – last 6 months Volume ('000s) Close Price  8,300km² CBM permits in Botswana $0.25 6,000 Volume traded ('000s) $0.20 5,000  Close Price (A$) Energy deficit in Botswana and wider 4,000 $0.15 Southern Africa region 3,000 $0

  7. Slide 7: Botswana CBM Project

    Botswana CBM Project For personal use only 7

  8. Slide 8: Management Team

    Management Team For personal use only Executive Board NED’s & Management Anthony (Tony) Gilby – MD & CEO Nathan Mitchell – Chairman • Geologist with >30 years industry experience • 25 years in resource exploration and drilling • Co-founder of a number of CBM companies • Pioneer of CBM drilling techn

  9. Slide 9: Strong Track Record

    Strong Track Record For personal use only  The founders of Tlou were pioneers of the CBM industry in Queensland  Tony Gilby developed ASX-listed Sunshine Gas from a small exploration company to its eventual takeover by QGC (BG) in 2008  Nathan Mitchell, CEO of Mitchell Drilling, pioneered Surface

  10. Slide 10: Peer Group

    Peer Group For personal use only 2P + 2C EV to Company Country Type Stage EV resources 2P+2C US$m Bcf US$/Bcf Green Dragon Gas China CBM Production 699.7 446.8 1.57 Wentworth Resources Tanzania Conventional Development 90.7 95.5 0.95 Aminex Tanzania Conventional Development 53.1 68.9 0.77 Victoria O

  11. Slide 11: Valuation & Risk

    Valuation & Risk For personal use only US $ EV/ 2P+2C Resources AIM Listed Gas $1.80 1.57 $1.60 $1.40 $1.20 $1.00 0.95 0.77 $0.80 0.62 $0.60 $0.40 0.20 $0.20 0.06 0.02 $0.00 Sunbird Energy Tlou Energy Great Eastern Energy Victoria Oil & Gas Aminex Wentworth Resources Green Dragon Gas Pre-Development

  12. Slide 12: Key Steps to Unlock Value

    Key Steps to Unlock Value Risk use only LOW Gas Production H2 2016 to power Reserve H1 2016 certification Development For personal Sustained gas Q4 2015 production Dewater multi-well pilots Multi-well pilot pod expansion Flowed gas from single pilot pod HIGH 12

  13. Slide 13: Market & Commercialisation

    For personal use only Market & Commercialisation 13

  14. Slide 14: Electricity Supply & Demand

    Electricity Supply & Demand For personal use only Source: Norconsult Market Report, 2013  Botswana is looking to increase the supply of power from the Morupule B power station commissioned in 2013  Morupule B consists of 4x132 MW units of net capacity at a cost of P11 billion (>US1 billion); only

  15. Slide 15: Investment Proposition

    Investment Proposition For personal use only  Tlou provides the entry point into the most advanced gas project in Botswana  Botswana has a severe energy shortage and is relying on non-firm imports and diesel generation  Tlou has an immediate and long term opportunity to provide domestic gas/power

  16. Slide 16: Proposed Sales Routes

    Proposed Sales Routes For personal use only Phase Market Opportunity Strategy 1 Compressed • Off-grid power solution for  Production testing Selemo multi-well pilot pods Natural Gas (CNG) mining companies (~1- 5  Install 1MW compressed natural gas (CNG) MW’s) equipment  Convert Selemo wells and f

  17. Slide 17: Investor Highlights

    Investor Highlights For personal use only Most advanced Highly A$43m project CBM gas project experienced investment (as in Botswana team at June 2015) Key milestones Premium gas to deliver Multiple routes price shareholder to monetise gas environment value 17

  18. Slide 18: Company Summary

    18 For personal use only Company Summary

  19. Slide 19: History

    History For personal use only  Listed on ASX in April 2013  A$43m project investment as at June 2015 Vertical Pilot Contingent Tlou farm-in: Wells: Lateral Pilot Wells: Resource Upgrade: 1,321 desorption Pre-feasibility pilot 2 lateral pilot pods at Certified by SRK – samples from wells (2 vertica

  20. Slide 20: Botswana CBM Project

    Botswana CBM Project For personal use only 20

  21. Slide 21: Reserves and Contingent Resources

    Reserves and Contingent Resources For personal use only Certified Resource Statement Unrisked Gross Unrisked Net OGIP(1) (100 Percent) (100 Percent) Certified Contingent Resource Category (BCF) (BCF) (BCF) Contingent Resources (SRK, 2015)  4.9 BCF (1C) Low Estimate (1C) 7.6 4.9 4.9  239 BCF (2C) B

  22. Slide 22: Lesedi CBM Project Technical Fundamentals

    Lesedi CBM Project For personal use only Technical Fundamentals Coal depth ~260-764m Cumulative net coal thickness 24m (Average) Gas contents 4-6 m3/t (DAF) (Average) Unstimulated reservoir ~2-5mD permeability per DST Gas compositions 80-95% methane 22

  23. Slide 23: Lesedi Operations

    Lesedi Operations For personal use only Aerial view of Operations Selemo Pod Gas flare - Selemo Pod December 2014 23

  24. Slide 24: Lesedi Project

    24 For personal use only Lesedi Project

  25. Slide 25: Thank You

    Thank You For personal use only 210 Alice St Brisbane QLD 4000 Australia Tel: +61 7 3012 9793 Ground Floor, Victoria House 132 Independence Avenue Gaborone Botswana Tel: +267 316 0857 www.tlouenery.com info@tlouenergy.com ASX: TOU

  26. Slide 26: Appendix

    26 For personal use only Appendix

  27. Slide 27: Coal Bed Methane (CBM)

    Coal Bed Methane (CBM) For personal use only  CBM is chemically identical to other sources of gas but is produced by non-conventional methods  CBM is extracted from coal seams rather than from sandstone reservoirs  The main component of natural gas is methane  CBM is produced by drilling into an

  28. Slide 28: The Global CBM Industry

    The Global CBM Industry For personal use only China  First CBM project in 1995  By end of 2015 2850 MW will supply 3.2 Million households with CBM/CMM fuels Australia  CBM contributed 87% USA of Queensland gas  Pioneered CBM production in 2014 industry in 1970-80’s  CBM expected to  Approx. 7%

  29. Slide 29: Horizontal Pilot Design

    Horizontal Pilot Design For personal use only • Horizontal wells (~750m in-seam) with vertical pumping well • Lesedi pod completed as a dual lateral • Selemo pod completed as a single lateral • Target Reservoir: Basal Morupule coal seam (~6m) 29

  30. Slide 30: Botswana

    Botswana For personal use only  Stable jurisdiction  Extensive coal resources  Gassy coal  Attractive operating and regulatory regime  Major energy shortfall in the Botswana and the South Africa region  High energy prices  Large mining industry to power 30

Tlou Energy — Investor Presentation (October 2015) on 6ix