Corpus Resources Plc · LSE:COR

Corpus Resources — Curzon Energy — UK Investor Show 2018

16 slides from Corpus Resources's conference presentation, Apr 21, 2018

  1. Slide 1: April 21st 2018, London with Curzon Energy

    April 21st 2018, London with Curzon Energy

  2. Slide 2: Important Notice

    IMPORTANT NOTICE By attending this presentation and/or accepting these slides you agree to be bound by the following conditions It is not intended that the Presentation Materials be distributed or passed on, directly or indirectly, to anyone and will be taken as having represented and undertaken tha

  3. Slide 3: Coos Bay Gas Field Operational Update

    Thomas Wagenhofer Executive Director COOS BAY GAS FIELD Operational Update 21 April 2018

  4. Slide 4: Curzon in Brief

    CURZON IN BRIEF • LSE:CZN / IPO October 2017 / Market Cap appr. £7m • ASSET 100% Owner/Operator 1.0 TCF CBM Gas Field, OR, USA 273 BCF 2C Contingent Resources Acquired out of Bankruptcy with $37m Historic Spend • STATUS Initial 5-Well Workover Program Completed Well Testing Program Ongoing Assessing

  5. Slide 5: US-CBM - An Established Industry

    US-CBM - An Established Industry 1.2 TCF OF CBM GAS WAS COOS BAY PRODUCED IN THE USA IN 2015 (LATEST EIA DATA) Powder River Basin Central Appalachian Uinta Basin Basin BIG PLAYERS in CBM San Juan Basin Black Warrior Arkoma Basin Basin Good Deal Flow Major CBM Fields in US 2

  6. Slide 6: Coos Bay Asset History

    COOS BAY ASSET HISTORY 12” Coos • Historic Coal Mining Activity County PL 68 Mscf/d • Regional Pipeline built 2003 6 month test • $37m Historic Spend • 12 Wells on 3 Sites • Extensive Geologic Work • Extensive Infrastructure • Encouraging Tests • Samples show pipeline quality gas Beaver Hill and • 1

  7. Slide 7: Phase I Update

    Phase 1 - Update Sales Point • Initial program completed 16-16 • Testing Started January 2018 • Four Wells Producing 1-21 13-15 • 1-21 SI pending pump repair (68 Mscf/d test) • Pumps Running on Well Gas 9-21 • Excess Gas Flared 15-21 • Current Activities: • About to start well work • Water Disposal

  8. Slide 8: Test Data – Early Days

    Test Data – Early Days Increasing to 124 ft open perfs Currently 33 ft of open perfs 5

  9. Slide 9: Test Data – Early Days

    Test Data – Early Days Increasing to 162 ft open perfs Currently 21 ft of open perfs 6

  10. Slide 10: Well 15-21 Flare Stack

    Well 15-21 Flare Stack 7

  11. Slide 11: Tests vs CPR Type Curves – Encouraging but too Early to Call

    Tests vs CPR Type Curves – Encouraging but too Early to Call Type Curves from 2017 CPR Report 200 to 500 Mscf/d short term tests at Beaver and Radio Hill Sites Well 1-21 (after 6 months) Up to 68 Mscf/day long term test with increasing trend at Westport Site (100 Mscf/day peak rate) Note: Type Curve

  12. Slide 12: Planned Well Work to Increase Gas Production

    Planned Well Work to Increase Gas Production • Drill out Bridge Plugs to Allow Access to all Gas Bearing Zones • Add new Perforations and o Recomplete some Old ones p • 160 ft open today e • 331 ft to be added n • 491 ft total (+207%) • Test Conventional Gas Sands Plug • 310 ft to be added s h u t 9

  13. Slide 13: Westport Gas Field Structural Cross-section

    Kaas ela Westport Gas Field Structural Cross-section Previous and pending perforated Coals and Sandstones 4 = ba : = ‘2 === Coos Bay Area Active Wells & Gas Pi 7 ==: F Pe £ Zs | = rail ie-1 ne St [Westport Gas Field Structural Cross-section

  14. Slide 14: Small Steps but Aiming Big

    Small Steps but Aiming Big PHASE III (45,000 ACRES) PHASE II (5,200 ACRES) Westport Area Westport Beaver Hill 273 BCF 2C Resources Radio Hill AVERAGE WELL COST $350K 11

  15. Slide 15: Summary

    Summary • Wells “Waking Up” - Showing Strong Trend of Increased Gas Rates • REMINDER … most CBM Projects require Months of Water Production before Gas is being Produced … NOT THE CASE AT COOS BAY! • Excellent Results given only Half of Productive Pay Contributing • Additional Rate Increase Expected

  16. Slide 16: Thank You for Listening

    THANK YOU FOR LISTENING OUR TICKER IS “CZN”

Curzon Energy — UK Investor Show 2018 on 6ix