Alkane Resources Ltd · ASX:ALK

Alkane Resources — Noosa Mining & Exploration Investor Conference 2021

16 slides from Alkane Resources's conference presentation, Jul 15, 2021

  1. Slide 1: Noosa Mining Conference Presentation (ASX and Media Release)

    ASX and MEDIA RELEASE 15 July 2021 Noosa Mining Conference Presentation For personal use only Alkane Resources Limited’s Managing Director, Mr Nic Earner, will be presenting at the Noosa Mining Conference today at 2 pm (AEST) and (12 noon AWST). A copy of Mr Earner’s presentation is attached. This d

  2. Slide 2: Noosa Mining & Exploration Investor Conference

    For personal use only NOOSA MINING & EXPLORATION INVESTOR CONFERENCE Nic Earner, Managing Director 15 July 2021 © 2020 Alkane Resources

  3. Slide 3: Disclaimer

    Disclaimer This presentation contains certain forward-looking statements and forecasts, including possible or assumed reserves and resources, production levels and rates, costs, prices, future performance or potential growth of Alkane Resources Ltd, industry growth or other trend projections. Such s

  4. Slide 4: Growth and Investment Strategy

    Strategy, Alkane is growing shareholder value through: Growth and • increased gold production at For personal use only Investment Tomingley • targeted exploration and development, and; • cornerstone investments. CORPORATE RELIABLE, EXISTING LANDMARK DISCOVERY STRATEGIC INVESTMENT TO STRENGTH AND TRA

  5. Slide 5: Corporate Profile

    Corporate Profile Ian Gandel (Non-Executive Chairman) For personal use only Mr Gandel is a successful Melbourne based businessman with extensive experience Capital Structure in retail management and retail property. Through his private investment vehicles Mr Gandel has been an investor in the mining

  6. Slide 6: Tomingley Corridor: Central West NSW

    Tomingley Corridor: Central West NSW For personal use only ~10km mineralisation adjacent to established processing infrastructure at Tomingley Gold Operations (TGO) ALKANE RESOURCES | ASX:ALK 5

  7. Slide 7: Tomingley Operation & Mining Areas

    Tomingley Operation & Mining Areas 1Mtpa processing plant operating since 2014 (permitted for 1.5Mtpa) For personal use only • • Exceeded FY21 production guidance with 56,958 oz gold produced at AISC A$1,320/oz* • Open cut and underground operations ongoing • FY22 production guidance of 55-60,000 oz

  8. Slide 8: Tomingley Extension Project

    Tomingley Extension Project For personal use only • Life Of Mine (LOM) plan shows operation to at least 2031#. • Planned production of approximately 745,000 oz for the period, with processing ramping to a 1.5 million tonne per annum feed rate. • The planned production profile (averaged for each peri

  9. Slide 9: Boda Prospect

    For personal use only Boda Prospect • Significant Gold-Copper Porphyry mineralisation at Boda • Boda target identified by geophysics, followed by RC drilling • Diamond holes show large scale mineralisation with higher grade core, continuing to the south and north west • Numerous other intercepts ove

  10. Slide 10: Boda – High Grade Breccia

    For personal use only Boda – High Grade Breccia KSDD007; 028; 31 on e cti S KSDD007 (96.8m @ 3.97g/t Au and 1.52% Cu) Chalcopyrite cemented breccia in potassic altered volcanics KSDD031 – 0.3m grading 43.4g/t Au, 7.8% Cu from 886.4m – Chalcopyrite-calcite-kspar altered monzonite finger within the br

  11. Slide 11: North Molong Porphyry Project Drilling Program

    North Molong Porphyry Project Drilling Program Current Program For personal use only • Boda/Boda Two mineralised envelope (>0.2g/t Au) • Horizontal dimensions of 1,000m x 400m • NW (Boda) and NS (Boda Two) strike • Extends to 1,100m depth, and is open along strike and at depth • High grade Au-Cu zon

  12. Slide 12: Strategic Gold Investments

    Strategic Gold For personal use only Investments • Additional value creation options beyond strong regional NSW exploration portfolio • Long-term, potential value to be achieved Alkane owns ~19.8% of Genesis Minerals, Alkane owns ~9.8% of Calidus Resources, via strategic investment and future M&A wh

  13. Slide 13: Key Priorities for FY22

    Key Priorities for FY22 For personal use only Test high grade extensions and repeat structures at Boda and nearby porphyry targets Early stage exploration across greater Boda region (North Molong Porphyry Project) Tomingley Corridor Exploration Drive (underway) Submission of Tomingley Extension Envi

  14. Slide 14: For personal use only

    For personal use only www.alkane.com.au @alkaneresources alkane-resources-ltd

  15. Slide 15: Mineral Resources

    Mineral Resources TOMINGLEY GOLD PROJECT TGO MINERAL RESOURCES (as at 30 June 2020) For personal use only MEASURED INDICATED INFERRED TOTAL Total Gold DEPOSIT Tonnage Grade Tonnage Grade Tonnage Grade Tonnage Grade (Kt) (g/t Au) (Kt) (g/t Au) (Kt) (g/t Au) (Kt) (g/t Au) (Koz) Open Pittable Resources

  16. Slide 16: Ore Reserves

    Ore Reserves For personal use only ALKANE RESOURCES | ASX:ALK 15

Alkane Resources — Noosa Mining & Exploration Investor Conference 2021 on 6ix