Slide 1: 2015 Annual General Meeting
2015 Annual General Meeting 24 June 2015
Slide 2: Disclaimer
Disclaimer This proprietary presentation (including any accompanying oral presentation, question and answer session and any other document or materials distributed at or in connection with this presentation) (collectively, the “Presentation”) has been prepared by Ithaca Energy Inc. (“Ithaca” or the
Slide 3: Building a highly profitable 25kboe/d North Sea oil and gas company
Building a highly profitable 25kboe/d North Sea oil and gas company Clear strategy – Lower risk UK North Sea production and development-led growth Simple plan – Deliver step change in free cashflow generation through Greater Stella Area start-up Financial discipline – Fully funded, strong liquidity
Slide 4: 2014 highlights
2014 highlights Strong cashflow generation – $182M1 underlying 2014 cashflow from operations Summit acquisition – Broadening of the portfolio and further strengthening of the business Strong reserves growth – 70MMboe2 2P reserves, 400% reserves replacement ratio in 2014 $300M senior notes issuance –
Slide 5: Strong production growth trajectory
Strong production growth trajectory Production (kboe/d) Broad producing asset portfolio Reduces asset concentration risk 12.5kboe/d Solid Q1-2015 performance – 12.5kboe/d Q1-2015 Production 10.9kboe/d 10.4kboe/d 2016 step change driven by Stella field start-up Wytch Farm ~16kboe/d net initial an
Slide 6: Business positioned for low Brent price environment
Business positioned for low Brent price environment Unit Operating Expenditure ($/boe) Committed Capital Expenditure (M$) $370M $320M 49$/boe 40$/boe 40$/boe GSA 30$/boe $150M ~35$/boe1 Q1-2015 $50M Producing Assets 2013 2014 2015 2016 2013 2014 2015 2016 Falling unit operating expenditure profile E
Slide 7: Sale of Norwegian business… maximising value from Valiant acquisition
Sale of Norwegian business… maximising value from Valiant acquisition Norwegian licence portfolio comprehensively restructured following Valiant acquisition in 2013 Sale delivers accelerated monetisation of non-core business $60M consideration plus additional $30M upside potential from 2015-17 wel
Slide 8: Greater Stella Area development… driving long term growth
Greater Stella Area development… driving long term growth Ithaca operated production hub – 54.66% interest Monetising >30MMboe1 net 2P reserves ~16kboe/d forecast net initial annualised production from Stella Capital efficient development strategy Initial production from Stella field, followed
Slide 9: Development programme highly advanced… route to first hydrocarbons
Development programme highly advanced… route to first hydrocarbons Development status Remaining key milestones Stella drilling campaign completed Complete subsea installation works – Q3-2015 ~90% subsea infrastructure installed FPF-1 mechanical completion – Q3-2015 FPF-1 modifications prog
Slide 10: Stella drilling programme completed
Stella drilling programme completed Five Stella production wells completed, tested and ready for start-up Four Andrew sandstone reservoir / one Ekofisk chalk reservoir Long horizontal reservoir sections maximise well deliverability Strong clean-up flow test results achieved – de-risking initial
Slide 11: Subsea infrastructure… limited installation activities remaining
Subsea infrastructure… limited installation activities remaining >90% subsea infrastructure installation Final subsea works to be completed when works completed FPF-1 arrives on location 2015 installation campaign FPF-1 mooring – pull in anchor chains Install and hook-up dynamic risers / Wel
Slide 12: FPF-1 modifications in Gdansk, Poland
FPF-1 modifications in Gdansk, Poland FPF-1 top deck from flare boom ITHACA ENERGY 2015 Annual General Meeting | 12
Slide 13: FPF-1 modifications
FPF-1 modifications Gas processing plant View of processing plant from above the power generators ITHACA ENERGY 2015 Annual General Meeting | 13
Slide 14: FPF-1 modifications
FPF-1 modifications Electrical / instrumentation cabling Switchgear room ITHACA ENERGY 2015 Annual General Meeting | 14
Slide 15: FPF-1 modifications
FPF-1 modifications HVAC units Uninterruptable power supply battery room ITHACA ENERGY 2015 Annual General Meeting | 15
Slide 16: FPF-1 modifications
FPF-1 modifications Instrument and end device installation ITHACA ENERGY 2015 Annual General Meeting | 16
Slide 17: 2015 key priorities
2015 key priorities Production – Maximise operational performance of all fields Stella – Deliver milestones required to achieve start-up in Q2-2016 Operating expenditure – Reduce cost base to enhance cashflow from producing assets Capital expenditure – Maintain strict discipline and control over all