Slide 1: Tullamarine Landfill Community Meeting
Tullamarine Landfill Community Meeting 18 October 2017
Slide 2: Recently Completed Activities
Recently Completed Activities Groundwater sampling at new wells completed, letter report currently being prepared Snap shot of In Situ parameters on all groundwater boreholes completed, report currently being prepared Groundwater sampling, all boreholes, completed Review of Bore Network Depths, data
Slide 3: Tullamarine Planned Activities
Tullamarine Planned Activities Ambient Air Testing [Underway] Install Landfill Gas Extraction Wells on Mound 3 [Design Phase] Next groundwater technical review [Late 2018 / Early 2019], Technical Review for Auditor Review [TRAR] Grey = task underway; Blue = task commencing
Slide 4: Email Question 1
Email Question 1 Q1. In July 2015, at the invitation of Kieren, Julie Law and I attended the obtaining of water samples from bores on the Buffer land. To date the report arising from that testing has not, I believe, been presented to the community. When can the community expect to receive that repor
Slide 5: Email Question 2
Email Question 2 Q2. In November 2016 a number of bores were installed in the housing area east of the dump. When can the community expect the preliminary results from that testing? It is nearly 12 months. Ample time to have results. A2. The results have been incorporated into a letter report. The r
Slide 6: Tullamarine Stormwater Connection
Tullamarine Stormwater Connection
Slide 7: Protecting Moonee Ponds Ck and Growling Grass Frog
Protecting Moonee Ponds Ck and Growling Grass Frog
Slide 8: Original Concept
Original Concept Concrete Pipe [0.75 m to 1.0 m diameter] Concrete Pipe [0.75 m to 1.0 m diameter] Concrete Pits/Formwork
Slide 9: New Concept
New Concept Hard Edge Wetlands Pipes Smaller or Replaced with Open Channel / Swale / Rock Pipe and Open Channel Swale No change to Creek Soft Edge connection. Wetlands
Slide 10: Defined Wetland
Defined Wetland 4. Example of a wetland with “hard edges” / clearly defined perimeter (Photo from www.blog.programmed.com.au) water level in wetland will rise as rain water and surface waters flow in and fall after the rain stops and the retained water evaporates and percolates down through the unde
Slide 11: Pipe and Grass Swale
Pipe and Grass Swale — 5. Example of a pipe discharging to a typical grass swale (Photo from www.fairfaxcounty.gov)
Slide 12: Wetland Example
Wetland Example Constructed Wetlands Handbook, Melbourne Water, July 2017
Slide 13: Existing Stormwater System
Stormwater Management & Grass Existing Stormwater System Establishment
Slide 14: North Wall Landscaping
North Wall Landscaping Designed by Western Plains Flora May 2013 May 2012
Slide 15: Mound 1
Mound 1 Leachate Well Gas Collection Manifold Drainage Swale
Slide 16: Kangaroos on Mound 3
Kangaroos on Mound 3
Slide 17: Echidnas near the Flare
Echidnas near the Flare
Slide 18: Benefits
Benefits Improved water quality Increased habitat Increased biodiversity Softer design Opportunity to work with Melb Water / Friends Groups / Council Savings?