Vault Minerals Limited · ASX:VAU
Vault Minerals — Red 5 — Shareholder Meeting (November 2010)
40 slides from Vault Minerals's shareholder meeting presentation, Nov 23, 2010
Slide 1: Development of the Siana Gold Project – Annual General Meeting
For personal use only RED 5 LIMITED – GREENSTONE RESOURCES DEVELOPMENT OF THE SIANA GOLD PROJECT Annual General Meeting November 23, 2010
Slide 2: Location
For personal use only Location
Slide 3: Project information
Project information For personal use only Open pit and underground Mine – 850,000 oz + Life of the Mine 11 Years Open Pit 5 Years Underground 6 Years Project development cost US$75 million Project development strategy - Mine and plant construction to major Filipino contractors - All other co
Slide 4: Strong community support
Strong community support For personal use only
Slide 5: Production targets
Production targets For personal use only Siana Mine Plan Open Pit Production
Slide 6: Planned site layout
For personal use only Planned site layout
Slide 7: Innovations in Exploration, Design & Development
Innovations in Exploration, Design & Development For personal use only 1. Resource Drilling techniques 2. Core handling procedures 3. Resource estimation 4. Underground Mining techniques 5. Tailings Dam design 6. EPCM & Project Management 7. Plant design 8. Flood analysis 9. Contracts and Procuremen
Slide 8: Resource drilling
For personal use only Resource drilling
Slide 9: Resource drilling
For personal use only Resource drilling
Slide 10: Drillcore Handling Procedures
Drillcore Handling Procedures For personal use only • Photographed (whole) wet & dry • Geological logging • Geotechnical logging & Point Load Testing • Specific Gravity determination 100% • Magnetic susceptibility • Packing tape wrapped Of • Cut according to core size • 5 meter slot cut for geochemi
Slide 11: Drillcore Handling Procedures
Drillcore Handling Procedures For personal use only
Slide 12: Core Volume for analysis
Core Volume for analysis For personal use only Lab Sample 20% Met Sample Lab Sample Met Sample 60% PQ 85mm Reference Sample 20% Lab Sample 30% Met Sample Lab Sample HQ 63mm Met Sample 50% Reference Sample 20% Met Sample Lab Sample Lab Sample 50% NQ 47mm Met Sample 20% Reference Sample 30%
Slide 13: Long section
For personal use only Long section
Slide 14: Resource panels
For personal use only Resource panels
Slide 15: Mining Plan
For personal use only Mining Plan
Slide 16: Underground mining
For personal use only Underground mining
Slide 17: Roadheader Selection
For personal use only Roadheader Selection
Slide 18: Underground mining method
Underground mining method For personal use only
Slide 19: Underground Paste Fill
Underground Paste Fill For personal use only
Slide 20: Community Location
For personal use only Community Location
Slide 21: Tailings Dam Design
For personal use only Tailings Dam Design
Slide 22: Tailings Dam Design
For personal use only Tailings Dam Design
Slide 23: EPCM & Project Management
EPCM & Project Management For personal use only • Project Director (David Jerdin) with client engineering, procurement, cost and document control team. • Embedded TWP Australia EPCM Project Manager (Bruce Ilford) • Embedded EPCM engineering, procurement & adjudication team. • Design by Contromation
Slide 24: Plant Design
Plant Design For personal use only • Process design by TWP Australia • 3D Plant design and engineering by (CES) • Workshop drawings automatically produced from system
Slide 25: Plant design
For personal use only Plant design
Slide 26: Flood Analysis – 5Yr Event
Flood Analysis – 5Yr Event For personal use only
Slide 27: Flood Mitigation – 5Yr Event
Flood Mitigation – 5Yr Event For personal use only
Slide 28: Flood Analysis – 75Yr Event
Flood Analysis – 75Yr Event For personal use only
Slide 29: Flood Mitigation – 75Yr Event
Flood Mitigation – 75Yr Event For personal use only
Slide 30: Contracts & Procurement
Contracts & Procurement For personal use only • Maximized Philippine procurement. • 100% Philippine Earthworks, Civil (Equi Parco), Fabrication & Construction (Aboitiz). • Philippine Mining Contractor (Delta).
Slide 31: Employment Policy
Employment Policy For personal use only • • Local Employment Policy: • Workers 95% • Earthmoving Operators 80% • High-skill Trades 60%
Slide 32: Location
For personal use only LOCATION
Slide 33: Porphyry Model
For personal use only PORPHYRY MODEL
Slide 34: Mapawa Surface Mineralisation
MAPAWA SURFACE MINERALISATION For personal use only
Slide 35: Mapawa IP Results
For personal use only MAPAWA IP RESULTS
Slide 36: Mapawa geological cross-section
Mapawa geological cross-section For personal use only
Slide 37: Mapawa ground magnetics
Mapawa ground magnetics For personal use only
Slide 38: Mapawa gmag & surface gold
Mapawa gmag & surface gold For personal use only
Slide 39: Summary
Summary For personal use only • Emerging gold producer in the Philippines • Excellent community relations • All major permits in place • Construction commenced • Final debt/equity financing announced • +10 year production profile • Enormous exploration potential in the region
Slide 40: Competent Person statement
For personal use only The information in this Public Report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on, and accurately reflects, information compiled by Mr G C Edwards who is a full-time employee of Red 5 Limited and who is a Member of The Australasian Institu