St. George Mining Ltd. · ASX:SGQ

St. George Mining — Shareholder Meeting (November 2025)

17 slides from St. George Mining's shareholder meeting presentation, Nov 26, 2025

  1. Slide 1: 2025 AGM Presentation

    2025 AGM PRESENTATION 26 November 2025 Niobium. Rare earths. World class.

  2. Slide 2: Disclaimer

    Disclaimer Forward-Looking Statements: This Presentation may include forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning St George’s planned exploration program and other statements that are not historical facts. Although St George believes t

  3. Slide 3: Araxá – a transformational investment year: Highlights

    Araxá 2025 Project – Investmentyear: – a transformational Highlights • From $25m to $350m market capitalisation1 • St George emerges as a leading player in the niobium and rare earths sector Refer to Appendix A for full list of references ASX: SGQ | St George Mining Limited 3

  4. Slide 4: Araxá Project – world-class JORC resource

    Araxá Project – world-class JORC resource1 Globally significant niobium and rare earths deposits Niobium resource TREO resource 41.2 Mt at 0.68% Nb₂O₅ (6,800ppm Nb₂O₅) 40.6 Mt at 4.13% TREO (41,300ppm TREO) comprising (at a cut-off of 0.2% Nb₂O₅): comprising (at a cut-off of 2% TREO): Classification

  5. Slide 5: Asset value is increasing

    Asset value is increasing +10,000m drilling program in progress delivers resource expansion • East Araxá – drilling 1km east of MRE has discovered a new high-grade rare earths zone with grades upto 13.4% TREO1 • Diamond drilling expands MRE – large step out holes intersect consistent high-grade mine

  6. Slide 6: Unparalleled project dynamics

    Unparalleled project dynamics Favourable logistics support speed to market for commodities in high demand MOSAIC St George’s • Located in Minas Gerais – a Tier 1 mining jurisdiction Facilities ARAXÁ Project • Establlshed infrastructure including roads, power and proven route to market • 6km from Ara

  7. Slide 7: Project Delivery Team

    Project Delivery Team In-country experts with combined +100 years experience Brazil Team, Araxa Brazil Team, Perth Director, ESG and Technical Development: Thiago Amaral Director, Corporate Development: Caue (Paul) Araujo Engineer with more than 17 years experience in niobium and critical metals Exp

  8. Slide 8: Where are we going?

    Where are we going ? Opportunity to create substantial shareholder value 6.0% Mountain Pass, Company St George Lynas MP Arafura MP.NYSE Market cap and A$345 million A$15 billion US$10.4 billion A$950 million Operating 5.0% stock exchange ASX: SGQ ASX: LYC NYSE: MP ASX: ARU mines Project Araxá, Mt We

  9. Slide 9: Company Overview

    Company Overview Led by an experienced Board, the share price has responded favourably to the Araxá acquisition Company Snapshot1 A$72.5 million fund raising announced in October 2025: ASX Code SGQ • A$50m institutional placement at A$0.10 per share; completed Share Price A$0.10 • A$22.5m strategic

  10. Slide 10: St George Mining Limited

    ST GEORGE MINING LIMITED Building a globally significant niobium-REE mining company ASX: SGQ | St George Mining Limited 10

  11. Slide 11: Appendix A - References

    Appendix A - References Slide 3: Slide 8: 1. Markert capitalisation at 25 November 2024 was $24.7 million; and on 25 For details of the chart and table of REE peers, see our ASX Release dated 15 April November 2025 was $345 million based on closing prices on ASX on that date 2025 “Rare Earths Deposi

  12. Slide 12: Appendix B – Key Risks

    Appendix B – Key Risks The future performance of the Company and the value of its shares may be influenced by a range of factors, many of which are largely beyond the control of the Company and its directors. Key risks associated with the Company’s business and the industry in which it operates as w

  13. Slide 13: Appendix B – Key Risks (continued)

    Appendix B – Key Risks (continued) The future performance of the Company and the value of its shares may be influenced by a range of factors, many of which are largely beyond the control of the Company and its directors. Key risks associated with the Company’s business and the industry in which it o

  14. Slide 14: Appendix B – Key Risks (continued)

    Appendix B – Key Risks (continued) The future performance of the Company and the value of its shares may be influenced by a range of factors, many of which are largely beyond the control of the Company and its directors. Key risks associated with the Company’s business and the industry in which it o

  15. Slide 15: Appendix C – References to previous announcements

    Appendix C – References to previous announcements This ASX announcement contains information extracted from the following reports • 5 March 2025 Niobium and Downstream Processing Study at Araxa which are available on the Company’s website at www.stgm.com.au: • 1 April 2025 High-grade Niobium and REE

  16. Slide 16: Competent Person Statement

    Competent Person Statement Competent Person Consent - MRE The information in this Presentation that relates to Mineral Resource Estimate and historical/foreign results is based upon, and fairly represents, information and supporting documentation reviewed and compiled by Mr. Beau Nicholls, a Compete

  17. Slide 17: Competent Person Statement

    Competent Person Statement Competent Person Consent - Historical and Foreign Results The information in this Presentation that relates to historical and foreign results is based upon, and fairly represents, information and supporting documentation reviewed by Mr. Carlos Silva, Senior Geologist emplo

St George Mining — Shareholder Meeting (November 2025) on 6ix