Questerre Energy Corporation Class A · TSX:QEC
Questerre Energy Corporation Class A — CAPP Investment Symposium 2012
49 slides from Questerre Energy Corporation Class A's conference presentation, December 2012
Slide 1: Corporate Presentation
Corporate Presentation CAPP Investment Symposium December 10 ‐ 12, 2012
Slide 2: Presentation outline
Presentation outline • Company Overview • Light Oil Bakken/Torquay, Antler, Saskatchewan • Liquids Rich Montney, Kakwa‐Resthaven, Alberta • Oil Shale – Red Leaf & EcoShale Process • St. Lawrence Lowlands, Quebec • Outlook • Investment Summary 2
Slide 3: Company overview
Company overview • Developing conventional production to create reserve of capital – Bakken/Torquay light oil pool in Saskatchewan with focus on secondary recovery – potential to add 2 million barrels net to Questerre – Drilling success for liquids‐rich Montney in Alberta creates new core area – pot
Slide 4: Asset overview
Asset overview Conventional • Southeast Saskatchewan – Proven Bakken/Torquay light oil resource style play with strong netbacks • Western Alberta – Liquids‐rich Montney resource play Nonconventional Oil • Utah & Wyoming – Commercialization project in Utah with Total – Early stage project in Wyoming
Slide 5: Financial overview
Financial overview Operating and Financial Results Three months ended September 30, 2012 Working capital ($) 40.6 million Debt Nil Cash Flow from operations ($) 2.8 million Production (boe/d) 696 Oil weighting 86% Revenue ($/boe) 75.64 Operating Netback ($/boe) 54.45 All financial amounts in C$ Capi
Slide 6: Bakken/Torquay Light Oil Antler, Saskatchewan
Bakken/Torquay Light Oil Antler, Saskatchewan 6
Slide 7: Antler
Antler • Established light oil asset targeting Torquay/Bakken resource play – NPV‐10/bbl as at December 31, 2011 of $45.60/bbl based on 2P reserves of 2.1 million barrels and $96.3 million NPV10 ̶ 2012 YTD netbacks of ~$68/bbl based on $89/bbl realized oil prices • Average royalties of 7% and operat
Slide 8: Waterflood
Waterflood • Secondary recovery scheme has been MAIN successfully applied in adjacent POOL Bakken/Torquay pool in Manitoba with a projected increase in recovery SINCLAIR from 9% to between 16%‐24% WATERFLOOD ̶ Low energy reservoir (no gas or water ONGOING drive) at Antler ideal candidate for waterfl
Slide 9: Liquids Rich Montney Kakwa-Resthaven, Alberta
Liquids Rich Montney Kakwa‐Resthaven, Alberta 9
Slide 10: Kakwa-Resthaven
Kakwa‐Resthaven • 2500 boe/d discovery well creates new core area in west central Alberta • Montney play is approximately 500 km long and 90 km wide – one of the largest oil and gas fields in world ̶ The liquids window is key to economics • 9 net sections with over 50% operated in the heart of the l
Slide 11: Area Activity
Area Activity Test results based on published company data 11
Slide 12: Well results
Well results • First two wells tested same interval in the upper Montney and results in line with industry activity ̶ 40%+ condensate and NGL ‐ rates better than expected • Production tests support robust economics for play ̶ Reserves projected at 3‐5 Bcf and 300,000‐500,000 bbls of condensate and l
Slide 13: Growth potential
Growth potential • Questerre is currently targeting one of three prospective intervals in the Upper Montney ̶ Each interval estimated at 12‐20 Bcf and 1.2‐2 million barrels recoverable resource ̶ Entire zone is approximately 100m thick • All three intervals have been reported by industry as producti
Slide 14: Conventional asset strategy
Conventional asset strategy • Goal is to increase production from conventional assets to achieve target of 1,500 boe/d by end of Strategic Environmental Assessment in Quebec Conventional assets value to provide a source of future development capital for non conventional oil and gas projects 14
Slide 15: Oil Shale
Oil Shale 15
Slide 16: New Energy Market Paradigm
New Energy Market Paradigm • Nonconventional has become the new conventional – Conventional production in North America being replaced by nonconventional oil and gas – Resource capture has become a priority for super majors and international conglomerates – Improving technology will continue to incr
Slide 17: New Energy Market Paradigm
New Energy Market Paradigm • Market changes led to engineering innovation which created a new paradigm – Steam Assisted Gravity Drainage (“SAGD”) process invented in early 1970s has revolutionized oilsands recovery over the last ten years – Provincial energy agency credits SAGD with increasing Alber
Slide 18: Oil shale
Oil shale • Fine grained sedimentary rock rich in organic matter known as kerogen – Kerogen formed from decaying organic material by heat and pressure in environment similar to conventional oil – Different from shale oil (i.e. where greater depth, pressure and geologic time has already converted ker
Slide 19: Oil shale
Oil shale • Heating in absence of air to produce oil from kerogen known as retorting – Produces natural gas, hydrogen, condensate, oil and spent shale – Either done on surface or subsurface • Processes to extract oil from shale are well established – Dates back to the 10th century – Currently in com
Slide 20: EcoShale - In-situ capsule process
EcoShale ‐ In‐situ capsule process • Innovative approach that moves the process to the rocks instead of moving the rocks to the process – Incorporates benefits and avoids challenges of both surface and subsurface processes • Dramatically improves economics – Modeling indicates economics are better t
Slide 21: EcoShale – Mine plan
EcoShale – Mine plan • Strip Mining Process – Preliminary site preparation – Overburden is stripped, sorted and stockpiled for construction material (design requires overburden) – Ore bench is stripped to base of the ore – Stripped site used for capsule construction – Designed to minimize handling a
Slide 22: Saskatchewan oil shale
Saskatchewan oil shale • 100% interest in over 100,000 acres • Drilled 10 wells on Arborfield block this winter – Analysis of core indicates recoveries between 10‐20 gallons/ton with select intervals of up to 16‐20 gallons/ton within a 20‐35 m section • Drilled 6 wells on Wildcat Hills block this su
Slide 23: Wyoming oil shale
Wyoming oil shale • Questerre to earn 20% on 5,120 acre farm‐in on private lands with Red Leaf holding a 80% interest • Red Leaf estimates 800 million barrels of oil in place ̶ Approximately 100 million barrels in place per square mile with average yield of 16‐ 18 gallons/ton • Begun scoping work fo
Slide 24: Red Leaf investment
Red Leaf investment • US$40 million investment in Red Leaf’s equity financing – Additional $3 million investment made recently – Represents approximately 6% of the equity; company has no debt • Non‐exclusive option to license Red Leaf process and technology but exclusive for any Questerre initiated
Slide 25: Total joint venture
Total joint venture • Total to fund 80% of costs estimated at US$200 million to demonstrate commercial scalability of EcoShale In‐ Capsule Process on Red Leaf’s Utah acreage (“EPS Phase”) • Total to fund an additional 80% of costs estimated at US$200 million for advanced commercial project on approx
Slide 26: Scaling from pilot to commercial by 2014
Scaling from pilot to commercial by 2014 • Targeting first oil production from a large scale capsule by 2014 • Field work underway on several key risk mitigation activities planned in four main categories to be completed by Q2 2013: ̶ Capsule Construction • Test all aspects of capsule construction f
Slide 27: Rationale for strategy
Rationale for strategy • Opportunity fits corporate strategy of high impact unconventional oil – License to proprietary process is a competitive advantage to capturing large oil resources at low cost • Risk mitigation through partners and diversification – Diversified exposure through interest in th
Slide 28: St. Lawrence Lowlands, Quebec
St. Lawrence Lowlands, Quebec 28
Slide 29: Where Questerre is currently
Where Questerre is currently • 18 Tcf prospective recoverable resource on acreage – 4.4 Tcf net to Questerre • Premium gas market • Tenure recently extended to 2021 • In advanced piloting phase 29
Slide 30: Prerequisites for development
Prerequisites for development • Strategic Environmental Assessment underway over next eighteen months • Complete advanced piloting phase and sweet spot identification • Establish hydrocarbon legislation • Achieve social acceptability • Develop local service sector Begin discussions with recently ele
Slide 31: Outlook
Outlook 31
Slide 32: Outlook
Outlook • Develop conventional assets with production goal of 1,500 boe/d and value of $1‐ $2 per share – Implement waterflood at Antler – Accelerate appraisal and development of Kakwa‐Resthaven with tie‐in and further drilling • Advance oil shale projects – Red Leaf scheduled to begin field work on
Slide 33: Investment summary
Investment summary • Oil shale projects offer opportunity to capture significant oil resources Strong • Mega discovery in Utica shale with long land tenure portfolio • Nonconventional light oil resource play in Saskatchewan and liquids rich play in Alberta to provide base of capital value • Licensed
Slide 34: Appendix
Appendix 34
Slide 35: Management and Board
Management and Board Management Board Michael Binnion, President & Chief Executive Les Beddoes, Jr. Officer International explorationist Former VP Exploration, Bow Valley Energy Inc.; Victoria, John Brodylo, VP Exploration (Nexen) BC Peter Coldham, VP Engineering & Operations Michael Binnion, Presid
Slide 36: EcoShale Process - Excavation
EcoShale Process ‐ Excavation Initial excavation for laboratory assay samples and material for bench scale process assessment. Tan colored band in photo center is the Mahogany Marker, a volcanic tuft deposit just above the richest oil shale in Utah, Wyoming and Colorado. 36
Slide 37: EcoShale Process - Excavation
EcoShale Process ‐ Excavation Excavation for field pilot. The near portion of the excavation provides a space for excavated shale to be returned, encapsulated and roasted. The center of the shot shows the start of a steel bulkhead support for experimental equipment (not used for production). The far
Slide 38: EcoShale Process - Excavation
EcoShale Process ‐ Excavation Early stage of pilot construction with steel bulkhead nearly completed, Bentonite Amended Soil (BAS) encapsulation layer around perimeter, and Flex Crete insulation blocks (not used in production). A drain system is about to be installed in the floor of the structure. 3
Slide 39: EcoShale Process – Capsule Construction
EcoShale Process – Capsule Construction Partially completed capsule construction showing shale to be roasted (from excavation), heating pipes, and thermocouple placement on/in heating pipes and in shale (under mounds of shale parallel to heating pipes). More than 700 thermocouples used for thermal d
Slide 40: EcoShale Process – Capsule Construction
EcoShale Process – Capsule Construction Top of shale to be roasted, with perforated gas recovery pipe system. The shale bed in the capsule contains, from the bottom up, a liquid drain system, 4 feet of shale, a layer of 2 heating pipe loops, 8 more feet of shale, a second layer of 2 heating pipe loo
Slide 41: EcoShale Process – Capsule Construction
EcoShale Process – Capsule Construction The shale to be roasted is covered with insulation, as on the sides and bottom of the capsule (Flex Crete Insulation block shown here in the field pilot, shale gravel insulation to be used in production). BAS sealing material is then placed over the top to com
Slide 42: EcoShale Process – Finished Site
EcoShale Process – Finished Site Steel bulkhead support structure showing burners, blowers, liquid and gas recovery external system components, combustion air and fuel (propane) supply and mixing systems, and instrumentation external components. 42
Slide 43: EcoShale Process – Finished Site
EcoShale Process – Finished Site Tank farm for storage of produced shale oil and fire protection water. Tanks are insulated, heated and oil contents are protected by replenished internal nitrogen atmosphere. 43
Slide 44: EcoShale Process – Finished Site
EcoShale Process – Finished Site Additional site features are visible in this overview, including equipment for condensing liquids from produced gas, separating water from produced shale oil liquids, and flaring of produced non‐condensable gas. A large shop building and a combined office and control
Slide 45: EcoShale Process
EcoShale Process RETORTS IN-SITU IN-CAPSULE * Surface mining * Oil shale in place * Surface mining * Surface retort facilities * Sub-surface retorting * Sub-surface retort process id (YVKG EGCOSHALE PETROBRAS Eesti Energia ‘ Pros Cons Pros Cons Pros Cons » Rapid pyrolysis | » Fines » More + Potentia
Slide 46: EcoShale Process
EcoShale Process Comparative Process Capital Costs $240,000 css SAGD Integrated Oil Shale Pi oe a oe =a oT ar H $160,000 A $120,000 @ som is ose Pa LEE SPPEECEL LIES CBIPIEE AP! LG f GES OLE 5 LPs e AS = Uptrort Capex =Total Capex Notes: ‘Source: Wood Mackenzie (figures nominal to 2009 and real (in
Slide 47: EcoShale Process
EcoShale Process Emissions Reclamation Water Usage Ground Water Contamination Surface Retorts Significant air pollution from burning oil shale coke Particulates produced during processing Handling and reclamation of spent shale a substantial environmental liability Used for spent shale cooling and o
Slide 48: Forward looking information
Forward looking information This presentation contains certain forward–looking information and statements within the meaning of applicable securities laws. The use of any of the words "expect", "anticipate", "continue", "estimate", "may", "will", "project", "should", "believe", "plans", "intends" an
Slide 49: 1650 AMEC Place, Calgary, Alberta
1650 AMEC Place 801 Sixth Avenue SW Calgary, Alberta T2P 3W2 Canada Tel: (403) 777 1185 / Fax: (403) 777 1578 www.questerre.com info@questerre.com www.blog.questerre.com www.facebook.com/Questerre Twitter: @Questerre_utica