Ferro-Alloy Resources Ltd. · LSE:FAR

Ferro-Alloy Resources — Investor Presentation (2022)

32 slides from Ferro-Alloy Resources's investor presentation, 2022

  1. Slide 1: Corporate Presentation Q4 2022

    CORPORATE PRESENTATION Q4 2022

  2. Slide 2: Disclaimer

    Disclaimer The information contained in this confidential document (“Presentation”) has been prepared by Ferro-Alloy Resources Limited (the “Company”). It has not been fully verified and is subject to material updating, revision and further amendment. This Presentation has not been approved by an au

  3. Slide 3: Overview

    Overview Vanadium producer in Kazakhstan Kyzylorda Aktobe Corporate • Listed on London Stock Exchange and Astana International Exchange Nur-Sultan • Operations: Kazakhstan Almaty Activities • Producing vanadium, molybdenum and nickel Motorway and rail in Shieli CHINA from purchased concentrates • Fe

  4. Slide 4: Strategic Investment

    Strategic Investment Led by Sir Mick Davis, former Xstrata CEO, Vision Blue has made a multi-stage strategic investment into FAR: • $15.5m already invested (including $1.1m by co-investors and $5.4m subscription during September 2022 equity fundraise Further options: • $2.5m - option to subscribe wi

  5. Slide 5: Share capital

    Share capital Major shareholders Shareholder Current shares (m) After conversion of VBR loan notes (m) Vision Blue Resources 77.6 (17.3%) 111.1 (23.0%) Andrey Kuznetsov 68.5 (15.2%) 68.5 (14.2%) Nicholas Bridgen 53.1 (11.8%) 53.1 (11.0%) Other shareholders 250.5 250.5 Total 449.7 483.2 Vision Blue R

  6. Slide 6: The Vanadium Market

    The Vanadium Market Corporate Presentation | Q4 2022 6

  7. Slide 7: Vanadium consumption by application 2021

    Vanadium consumption by application 2021 1.7% 0.9% 0.1% 3.5% 1.8% 2.1% HSLA Steel High Alloy Steel Super Alloys/Titanium Alloys Chemicals Cast Iron 30.2% Energy Storage Stainless Steel 59.8% V Metal Source: TTP Squared Inc: Vanitec Corporate Presentation | Q4 2022 7

  8. Slide 8: Vanadium is a battery metal

    Vanadium is a battery metal An entirely new major market for vanadium Projected annual demand in 2050 for Energy Technologies as a percentage of 2018 Production Levels under 2DS Cobalt Source: presentation to Vanitec 2020 Corporate Presentation | Q4 2022 8

  9. Slide 9: World market for vanadium is growing strongly

    World market for vanadium is growing strongly Sources of New Demand 2020-2025 60,000 50,000 40,000 MTV 30,000 20,000 10,000 - 2021e 2022e 2023e 2024e 2025e Change in Steel Production Change in Specific V Consumption in Steel Energy Storage Source: Vanitec, TTP Squared Inc Corporate Presentation | Q4

  10. Slide 10: Two operations

    Two operations A: Balasausqandiq project – approximately 96% of NPV B: Existing processing operation – approximately 4% of NPV Balasausqandiq Corporate Presentation | Q4 2022 10

  11. Slide 11: Balasausqandiq deposit

    Balasausqandiq deposit (96% of FAR’s NPV) Corporate Presentation | Q4 2022 11

  12. Slide 12: Balasausqandiq deposit: An unusual type of ore

    Balasausqandiq deposit: An unusual type of ore Nearly all the vanadium produced in the world is from titano-vanadiferous magnetite, a form of iron ore. Extraction of vanadium from this material is energy intensive and expensive. The ore at Balasausqandiq is different. It is a sedimentary deposit, wi

  13. Slide 13: Balasausqandiq – why a huge cost advantage

    Balasausqandiq – why a huge cost advantage over other producers and projects? Crucially not a titano-vanadiferous magnetite deposit WHY THIS MATTERS: • No need for high temperature roasting • Significantly reduces capital costs • No need to pre-concentrate ore • Significantly reduces operating costs

  14. Slide 14: Balasausqandiq – other advantages

    Balasausqandiq – other advantages FAVOURABLE GEOLOGY • Outcrops at surface, open pit, • Very large deposit • Total resource plus exploration potential 115m tonnes (middle of estimated range) • Visible geological cut-off, low stripping ratio EXISTING INFRASTRUCTURE AND TRANSPORT LINKS • Surfaced road

  15. Slide 15: Balasausqandiq – economics

    Balasausqandiq – economics LOWEST COST PRODUCER Balasausqandiq forecast cash cost of production: • $1.54/lb expected (costs apportioned between products) • $(1.20) if by-product revenues are deducted from costs EXCEPTIONAL FINANCIAL STATISTICS (Phases 1 and 2 combined) • NPV of $2 billion (10% disco

  16. Slide 16: Feasibility study highlights

    Feasibility study highlights Resource • Around 18,500m out of the total drilling programme of 22,850 metres completed • Ore Body 1 infill drilling completed. Drilling of OB2-4 ongoing • Early semi-quantitative results of infill drilling of three new sections at 200m intervals within an 800m strike l

  17. Slide 17: Existing operation

    Existing operation (4% of FAR’s NPV) Corporate Presentation | Q4 2022 17

  18. Slide 18: Existing process plant - today

    Existing process plant - today • Recovers vanadium, molybdenum and nickel from recycled raw-materials • Based on expanded pilot/test plant for the Balasausqandiq project Corporate Presentation | Q4 2022 18

  19. Slide 19: Existing operation – completion of development in Q4

    Existing operation – completion of development in Q4: Existing operation (Q1 – Q3): • Recovery of vanadium in ammonium metavanadate • Recovery of molybdenum • Nickel, comprising a low-grade concentrate, is currently being stockpiled New developments in Q4: • New molybdenum sorption circuit to signif

  20. Slide 20: Existing operation – target production

    Existing operation – target production Projected 2023 Projected monthly sales Jan-June 2022 (average per revenue 2023 at current (average per month) prices and discounts month) Tonnes $m (% of total) Tonnes Tonnes treated 196 275 - 325 Production: Vanadium pentoxide 29 55 - 62 $1.0m - $1.15m (50%) M

  21. Slide 21: Existing process plant – why?

    Existing process plant – why? Advantages: • Useful cash flow – targeting $10m free cash flow per year • An experienced management team o Technical experience o Four PhD’s within technical team o Enables informed input to design of Balasausqandiq project o Capability in-house to develop needed techno

  22. Slide 22: Development plan

    Development plan Corporate Presentation | Q4 2022 22

  23. Slide 23: Development plan

    Development plan Now Expansion of existing operation and feasibility study for Ongoing Balasausqandiq Mining and processing 1 Mtpa of ore Production 5,600 tpa Capex Phase 1 (to be funded from existing operations, debt, and exercise of $100m options by strategic partner) Expansion to 4 Mtpa of ore Ca

  24. Slide 24: Timeline – near term

    Timeline – near term Approximate timeline of existing plant and feasibility study Completed by Commissioning of new molybdenum circuit Q4 2022 Commissioning of new press filter and repulpation Q4 2022 Commissioning of nickel roast and leach circuit Q4 2022 Completion of drilling of OB 2, 3 &4 Q4 202

  25. Slide 25: Timeline – post feasibility study

    Timeline – post feasibility study Approximate timeline of development plan Completed By Existing plant at full capacity Q4 2022 Finance for Phase 1 Q3/Q4 2023 Front end engineering Phase 1 Q1 2024 Construction Phase 1 Q4 2025 Construction Phase 2 Q2 2028 Corporate Presentation | Q4 2022 25

  26. Slide 26: Appendix

    Appendix Corporate Presentation | Q4 2022 26

  27. Slide 27: Interim results for half year to June 2022

    Interim results for half year to 30 June 2022 • H1 revenue, while materially ahead of last year, has been impacted by the supply chain issues caused by the war in Ukraine and the after effects of Covid-19 • Uncertainty remains as to the impact these issues will have on the outcome for H2 but the Com

  28. Slide 28: Kazakhstan

    Kazakhstan An attractive operating environment • An upper-middle income country (World Bank) • 25th (of 191) in ease of doing business (World Bank 2020) • 10% income tax, 20% profits tax • No general requirement for government free-carry or local ownership • Subsoil use law updated in 2018 based on

  29. Slide 29: By-products

    By-products Valuable by-products produced as part of the single processing route Carbon-silica Projected revenue Concentrated to make a 40% carbon concentrate, can be used in the Product per tonne of ore ($/t) manufacture of rubber, principally tyres. Carbon-silica mix can also be briquetted * to ma

  30. Slide 30: Board

    Board Experienced team with proven capability Sir Mick Davis Chairman A highly successful mining executive accredited with building Xstrata plc into one of the largest mining companies in the world prior to its acquisition by Glencore plc. Before listing Xstrata on the LSE as CEO he was CFO of Billi

  31. Slide 31: Straightforward process

    Straightforward process Process flowsheet tested in 15,000 tpa pilot plant Thickening Autoclave Crushing & De-Carbonisation and Filtration Leaching Absorption Desorption Grinding Circuit Ammonia Precipitation, Ferro Vanadium Metavanadate Crystallisation Dissociation Vanadium Pentoxide (75-75% & Filt

  32. Slide 32: Balasausqandiq

    Balasausqandiq Resources and potential prior to recent drilling campaign JORC resource based on OB1 plus exploration potential in OB2 – OB5 Category Tonnes V2O5 V2O5 Orebody (JORC 2012) (Mt) (%) (tonnes) OB1 Indicated Primary1 21.4 0.67 143,380 OB1 Inferred Oxide2 1.3 0.89 11,570 OB1 Inferred Primar