Elevra Lithium Limited · ASX:ELV
Elevra Lithium — Sayona Mining — 2022 Gold Coast Investment Showcase
16 slides from Elevra Lithium's conference presentation, Jun 22, 2022

Slide 1: Investor Presentation – Gold Coast Investment Showcase (ASX release)
22 June 2022 INVESTOR PRESENTATION Attached is an investor’s presentation to be presented by Managing Director, Mr Brett Lynch ay the 2022 Gold Coast Investment Showcase. For more information, please contact: Paul Crawford Company Secretary Phone: +61 (7) 3369 7058 Email: info@sayonamining.com.au Ab

Slide 2: Plugged Into An Electric Future
22 June 2022 PLUGGED INTO AN ELECTRIC FUTURE Investor Presentation – Gold Coast Investment Showcase BRETT LYNCH, MANAGING DIRECTOR/CEO, SAYONA MINING Not for release to US wire services or distributed in the United States

Slide 3: Disclaimer
Disclaimer Forward Looking Statements • Sayona expands northern Québec lithium hub with 121 new claims – 25 January 2022 This presentation may contain certain forward-looking statements. Such statements are • Moblan drilling planned as SYA eyes lithium resource expansion, 21 December 2021 only predi

Slide 4: Key Highlights
Key Highlights Strategic portfolio of lithium assets in Québec, Canada, hosting one of the largest combined spodumene resources in North America; exploration upside from WA gold/lithium projects ELECTRIC FUTURE PLUGGED INTO AN Québec an attractive location outside of U.S. to satisfy growing demand f

Slide 5: Strategic Portfolio of Projects
Strategic Portfolio of Projects Focused on becoming a world-scale hard rock lithium producer based in Québec Near-term objective to begin supplying spodumene to the North American lithium battery supply chain by 2023 ELECTRIC FUTURE PLUGGED INTO AN Abitibi Hub - Three Core Assets – North America

Slide 6: Stepping Up Lithium Value Chain
Stepping Up Lithium Value Chain ELECTRIC FUTURE PLUGGED INTO AN 2027 + 2025 - 2026 Targeting expansion of Northern Hub capacity Further invest in Québec 2023 - 2024 Targeting start of refinery operations at Abitibi battery metals to increase supply Ramp-up SC6 production Targeting Abitibi

Slide 7: Abitibi and Northern Hubs
Sayona Northern Hub Abitibi and Northern Hubs World-scale lithium supply chain Sayona Abitibi Hub Moblan Abitibi Hub expected to be the most sustainable and cost-effective ELECTRIC FUTURE PLUGGED INTO AN Concentrator lithium production in North America Moblan expands Sayona’s lithium supply capa

Slide 8: Abitibi Hub
Abitibi Hub Abitibi Hub poised to benefit from proximity to renewable hydropower and North American battery market Whabouchi Canada Sayona created the Abitibi Hub from three core assets: NAL – Mine and concentrator, brownfield site with over ELECTRIC FUTURE PLUGGED INTO AN − $400 million invested

Slide 9: NAL Project Overview
NAL Project Overview Near-term lithium producer - brownfield mining and concentration operation Acquired NAL in August 2021 alongside strategic partner, Piedmont Lithium Inc. (ASX: PLL), through subsidiary, Sayona Québec Inc. (75% Sayona/25% Piedmont) ELECTRIC FUTURE PLUGGED INTO AN Located in L

Slide 10: Authier Project Overview
Authier Project Overview Authier integration into Abitibi Hub brings many advantages 100% owned project, located 45km from Val d’Or Authier deposit well understood and will be mined by using a simple open cut methods, enhanced by the shallow and thick nature of the mineralisation, allowing ELECT

Slide 11: Northern Hub
Northern Hub Developing ELECTRIC FUTURE PLUGGED INTO AN Moblan drilling program underway to expand resource base Recent discovery of significant new southern lithium pegmatite zone Recently acquired 121 new claims adjacent to Moblan (Lac Albert); claims to be assessed for lithium mineralisatio

Slide 12: Moblan Project – Acquired in 2021
Moblan Project – Acquired in 2021 Moblan a large, high grade property anchoring Sayona’s Northern Hub Located 130km to the N-NW of Chibougamau, with year-round highway/gravel road access, rail access at Chibougamau and grid power 52km from site ELECTRIC FUTURE PLUGGED INTO AN One of the highest-

Slide 13: NAL Restart Plan
NAL Restart Plan All works completed to date form the basis for progressing to Definitive Feasibility Study (“DFS”), expected CY22 on integrated NAL/Authier operation ELECTRIC FUTURE PLUGGED INTO AN NAL concentrator commission on target for late Q3 2022 / early Q4 2022 Planned restart in Q1 20

Slide 14: NAL & Authier - Timeline To Production
NAL & Authier - Timeline To Production In parallel with key project milestones outlined below, Sayona expects to release an updated Authier feasibility study in Q2 CY22 and a confirmatory NAL / Authier integrated DFS later in 2022 Timeline to Production in the Abitibi Hub ELECTRIC FUTURE PLUGGED I

Slide 15: Investment Summary
Investment Summary • Abitibi and Northern Hubs in Quebec represent world-class & synergistic group of STRATEGIC PORTFOLIO lithium assets amid accelerating demand from EV revolution ELECTRIC FUTURE PLUGGED INTO AN SPEED TO PRODUCTION • First spodumene production by 2023 – first local production in No

Slide 16: Contact Us
Contact Us Sayona Mining Limited ACN 091 951 978 ELECTRIC FUTURE PLUGGED INTO AN Contacts Suite 68, 283 Given Terrace Paddington, Queensland, 4064 Brisbane, Australia Subscribe to Sayona’s e-news: http://sayonamining.com.au/subscribe/ Join the conversation on Twitter: @SayonaMining Follow us on Link
Source: company website
More decks from Elevra Lithium Limited
Shareholder Meeting (November 2026)29 slides · Nov 20, 2026
Shareholder Meeting (November 2026)32 slides · Nov 19, 2026
Investor Presentation (November 2026)26 slides · Nov 6, 2026
Investor Presentation (September 2026)27 slides · Sep 8, 2026
FY2026 Earnings Presentation27 slides · Aug 28, 2026
Shareholder Meeting (July 2026)17 slides · Jul 17, 2026